EP3276259 - WATERTIGHT PROJECTOR AND METHOD FOR MANUFACTURING SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.11.2021 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 04.12.2020 | ||
Former | Grant of patent is intended Status updated on 12.10.2020 | ||
Former | Examination is in progress Status updated on 12.07.2019 | ||
Former | Request for examination was made Status updated on 03.08.2018 | ||
Former | The application has been published Status updated on 29.12.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Alphadif 1522 Avenue de Draguignan 83130 La Garde / FR | [2018/39] |
Former [2018/05] | For all designated states PPLV Trading SIA Skunu Street 19 1050 Riga / LV | Inventor(s) | 01 /
POMA, Philippe 2, Impasse Alphonse Daudet 83260 LA CRAU / FR | 02 /
VINCENT, Didier 3, Rue Lamalgue 83400 HYERES / FR | 03 /
LORENZI, Andréa 135, Rue Gabriel Péri 83220 LE PRADET / FR | [2018/05] | Representative(s) | Roman, Alexis SPE Roman-Andre 35 rue Paradis B.P. 30064 13484 Marseille / FR | [2021/01] |
Former [2018/05] | Roman, Alexis Cabinet Roman 35 rue Paradis B.P. 30064 13484 Marseille Cedex 20 / FR | Application number, filing date | 16181119.5 | 25.07.2016 | [2018/05] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP3276259 | Date: | 31.01.2018 | Language: | FR | [2018/05] | Type: | B1 Patent specification | No.: | EP3276259 | Date: | 06.01.2021 | Language: | FR | [2021/01] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 08.11.2016 | Classification | IPC: | F21V31/00, F21S9/02, F21V23/04, // F21Y105/10, F21Y115/10, F21W131/401 | [2018/05] | CPC: |
F21V31/005 (EP);
F21S9/02 (EP);
F21V23/04 (EP);
F21W2131/401 (EP);
F21Y2105/10 (EP);
F21Y2115/10 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/36] |
Former [2018/05] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | WASSERDICHTER SCHEINWERFER UND SEIN HERSTELLUNGSVERFAHREN | [2018/05] | English: | WATERTIGHT PROJECTOR AND METHOD FOR MANUFACTURING SAME | [2018/05] | French: | PROJECTEUR ETANCHE A L'EAU ET SON PROCEDE DE FABRICATION | [2018/05] | Examination procedure | 25.07.2016 | Date on which the examining division has become responsible | 26.07.2018 | Amendment by applicant (claims and/or description) | 26.07.2018 | Examination requested [2018/36] | 17.07.2019 | Despatch of a communication from the examining division (Time limit: M04) | 20.11.2019 | Reply to a communication from the examining division | 03.03.2020 | Despatch of a communication from the examining division (Time limit: M04) | 30.06.2020 | Reply to a communication from the examining division | 13.10.2020 | Communication of intention to grant the patent | 30.11.2020 | Fee for grant paid | 30.11.2020 | Fee for publishing/printing paid | 30.11.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 07.10.2021 | No opposition filed within time limit [2021/50] | Fees paid | Renewal fee | 24.07.2018 | Renewal fee patent year 03 | 30.07.2019 | Renewal fee patent year 04 | 29.07.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 25.07.2016 | AL | 06.01.2021 | AT | 06.01.2021 | CY | 06.01.2021 | CZ | 06.01.2021 | DK | 06.01.2021 | EE | 06.01.2021 | FI | 06.01.2021 | HR | 06.01.2021 | IT | 06.01.2021 | LT | 06.01.2021 | LV | 06.01.2021 | MC | 06.01.2021 | MK | 06.01.2021 | PL | 06.01.2021 | RO | 06.01.2021 | RS | 06.01.2021 | SE | 06.01.2021 | SI | 06.01.2021 | SK | 06.01.2021 | SM | 06.01.2021 | TR | 06.01.2021 | NL | 06.02.2021 | BG | 06.04.2021 | NO | 06.04.2021 | GR | 07.04.2021 | IS | 06.05.2021 | PT | 06.05.2021 | GB | 25.07.2021 | IE | 25.07.2021 | LU | 25.07.2021 | CH | 31.07.2021 | LI | 31.07.2021 | [2024/29] |
Former [2024/22] | HU | 25.07.2016 | |
AL | 06.01.2021 | ||
AT | 06.01.2021 | ||
CY | 06.01.2021 | ||
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
IT | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
MK | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SI | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
NL | 06.02.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
GB | 25.07.2021 | ||
IE | 25.07.2021 | ||
LU | 25.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2023/30] | HU | 25.07.2016 | |
AL | 06.01.2021 | ||
AT | 06.01.2021 | ||
CY | 06.01.2021 | ||
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
IT | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SI | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
NL | 06.02.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
GB | 25.07.2021 | ||
IE | 25.07.2021 | ||
LU | 25.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2023/29] | HU | 25.07.2016 | |
AL | 06.01.2021 | ||
AT | 06.01.2021 | ||
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
IT | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SI | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
NL | 06.02.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
GB | 25.07.2021 | ||
IE | 25.07.2021 | ||
LU | 25.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2023/27] | HU | 25.07.2016 | |
AL | 06.01.2021 | ||
AT | 06.01.2021 | ||
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
IT | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SI | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
GB | 25.07.2021 | ||
IE | 25.07.2021 | ||
LU | 25.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2022/35] | AL | 06.01.2021 | |
AT | 06.01.2021 | ||
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
IT | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SI | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
GB | 25.07.2021 | ||
IE | 25.07.2021 | ||
LU | 25.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2022/23] | AL | 06.01.2021 | |
AT | 06.01.2021 | ||
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
IT | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SI | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
GB | 25.07.2021 | ||
LU | 25.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2022/22] | AL | 06.01.2021 | |
AT | 06.01.2021 | ||
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SI | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
PT | 06.05.2021 | ||
GB | 25.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2022/21] | AL | 06.01.2021 | |
AT | 06.01.2021 | ||
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SI | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
PT | 06.05.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2022/18] | AL | 06.01.2021 | |
AT | 06.01.2021 | ||
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
MC | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SI | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
PT | 06.05.2021 | ||
Former [2022/13] | AL | 06.01.2021 | |
AT | 06.01.2021 | ||
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SI | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
PT | 06.05.2021 | ||
Former [2022/10] | AL | 06.01.2021 | |
AT | 06.01.2021 | ||
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
PT | 06.05.2021 | ||
Former [2022/07] | AL | 06.01.2021 | |
AT | 06.01.2021 | ||
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2021/50] | AT | 06.01.2021 | |
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
PL | 06.01.2021 | ||
RO | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SK | 06.01.2021 | ||
SM | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2021/49] | AT | 06.01.2021 | |
CZ | 06.01.2021 | ||
DK | 06.01.2021 | ||
EE | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
PL | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SM | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2021/48] | AT | 06.01.2021 | |
CZ | 06.01.2021 | ||
EE | 06.01.2021 | ||
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
PL | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SM | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2021/46] | AT | 06.01.2021 | |
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
PL | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
SM | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2021/42] | AT | 06.01.2021 | |
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
PL | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
IS | 06.05.2021 | ||
PT | 06.05.2021 | ||
Former [2021/39] | AT | 06.01.2021 | |
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
PL | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
PT | 06.05.2021 | ||
Former [2021/38] | AT | 06.01.2021 | |
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
RS | 06.01.2021 | ||
SE | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
PT | 06.05.2021 | ||
Former [2021/37] | AT | 06.01.2021 | |
FI | 06.01.2021 | ||
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
LV | 06.01.2021 | ||
RS | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
PT | 06.05.2021 | ||
Former [2021/36] | FI | 06.01.2021 | |
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
BG | 06.04.2021 | ||
NO | 06.04.2021 | ||
GR | 07.04.2021 | ||
PT | 06.05.2021 | ||
Former [2021/35] | FI | 06.01.2021 | |
HR | 06.01.2021 | ||
LT | 06.01.2021 | ||
NO | 06.04.2021 | ||
PT | 06.05.2021 | ||
Former [2021/33] | FI | 06.01.2021 | |
LT | 06.01.2021 | ||
NO | 06.04.2021 | ||
PT | 06.05.2021 | Documents cited: | Search | [XYI]CN2699110Y (GUO ZONGFU [CN]) [X] 1-4,12 * page 4 * * figures 1-4 * [Y] 7-10 [I] 11; | [A]US2009109677 (COUSHAINE CHARLES M [US], et al) [A] 1-12* the whole document *; | [Y]JP2010055981 (NIPPON SEIKI CO LTD) [Y] 7-10 * the whole document * | by applicant | JP2008091217 |