EP3171198 - SYSTEMS AND METHODS FOR TILTABLE GRATING OUT-COUPLERS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 16.04.2021 Database last updated on 01.01.2025 | |
Former | The patent has been granted Status updated on 08.05.2020 | ||
Former | Grant of patent is intended Status updated on 07.01.2020 | ||
Former | Request for examination was made Status updated on 21.04.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states The Boeing Company 100 North Riverside Plaza Chicago, IL 60606-1596 / US | [2017/21] | Inventor(s) | 01 /
Singer, Scott Benjamin c/o The Boeing Company 100 North Riverside Plaza Chicago, IL Illinois 60606-1596 / US | [2017/21] | Representative(s) | Witte, Weller & Partner Patentanwälte mbB Postfach 10 54 62 70047 Stuttgart / DE | [2017/21] | Application number, filing date | 16181404.1 | 27.07.2016 | [2017/21] | Priority number, date | US201514944621 | 18.11.2015 Original published format: US201514944621 | [2017/21] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3171198 | Date: | 24.05.2017 | Language: | EN | [2017/21] | Type: | B1 Patent specification | No.: | EP3171198 | Date: | 10.06.2020 | Language: | EN | [2020/24] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 13.04.2017 | Classification | IPC: | G01S7/481, G02B6/124, G02B6/30, G02B26/08 | [2020/02] | CPC: |
G01S7/4817 (EP,IL,US);
G01S7/481 (IL,US);
G02B6/29314 (US);
G01S7/4818 (EP,US);
G01S7/484 (IL);
G02B26/0808 (EP,IL,US);
G02B6/124 (EP,US);
G02B6/305 (EP,US);
G02B6/34 (US);
G02B6/4215 (US)
(-)
|
Former IPC [2017/21] | G01S7/481, G02B6/34, G02B6/35, G02B26/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/50] |
Former [2017/21] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SYSTEME UND VERFAHREN FÜR KIPPBARE GITTERAUSKOPPLER | [2017/21] | English: | SYSTEMS AND METHODS FOR TILTABLE GRATING OUT-COUPLERS | [2017/21] | French: | SYSTÈMES ET PROCÉDÉS POUR COUPLEURS À RÉSEAU INCLINABLES | [2017/21] | Examination procedure | 27.07.2016 | Examination requested [2017/21] | 27.07.2016 | Date on which the examining division has become responsible | 07.11.2017 | Amendment by applicant (claims and/or description) | 08.01.2020 | Communication of intention to grant the patent | 05.05.2020 | Fee for grant paid | 05.05.2020 | Fee for publishing/printing paid | 05.05.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 11.03.2021 | No opposition filed within time limit [2021/20] | Fees paid | Renewal fee | 27.07.2018 | Renewal fee patent year 03 | 29.07.2019 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.07.2016 | AL | 10.06.2020 | AT | 10.06.2020 | CY | 10.06.2020 | CZ | 10.06.2020 | DK | 10.06.2020 | EE | 10.06.2020 | ES | 10.06.2020 | FI | 10.06.2020 | HR | 10.06.2020 | IT | 10.06.2020 | LT | 10.06.2020 | LV | 10.06.2020 | MC | 10.06.2020 | MK | 10.06.2020 | MT | 10.06.2020 | NL | 10.06.2020 | PL | 10.06.2020 | RO | 10.06.2020 | RS | 10.06.2020 | SE | 10.06.2020 | SI | 10.06.2020 | SK | 10.06.2020 | SM | 10.06.2020 | TR | 10.06.2020 | IE | 27.07.2020 | LU | 27.07.2020 | BE | 31.07.2020 | CH | 31.07.2020 | LI | 31.07.2020 | BG | 10.09.2020 | NO | 10.09.2020 | GR | 11.09.2020 | IS | 10.10.2020 | PT | 12.10.2020 | [2022/32] |
Former [2022/27] | HU | 27.07.2016 | |
AL | 10.06.2020 | ||
AT | 10.06.2020 | ||
CY | 10.06.2020 | ||
CZ | 10.06.2020 | ||
DK | 10.06.2020 | ||
EE | 10.06.2020 | ||
ES | 10.06.2020 | ||
FI | 10.06.2020 | ||
HR | 10.06.2020 | ||
IT | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
MC | 10.06.2020 | ||
MT | 10.06.2020 | ||
NL | 10.06.2020 | ||
PL | 10.06.2020 | ||
RO | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
SI | 10.06.2020 | ||
SK | 10.06.2020 | ||
SM | 10.06.2020 | ||
TR | 10.06.2020 | ||
IE | 27.07.2020 | ||
LU | 27.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
IS | 10.10.2020 | ||
PT | 12.10.2020 | ||
Former [2021/37] | AL | 10.06.2020 | |
AT | 10.06.2020 | ||
CZ | 10.06.2020 | ||
DK | 10.06.2020 | ||
EE | 10.06.2020 | ||
ES | 10.06.2020 | ||
FI | 10.06.2020 | ||
HR | 10.06.2020 | ||
IT | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
MC | 10.06.2020 | ||
NL | 10.06.2020 | ||
PL | 10.06.2020 | ||
RO | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
SI | 10.06.2020 | ||
SK | 10.06.2020 | ||
SM | 10.06.2020 | ||
IE | 27.07.2020 | ||
LU | 27.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
IS | 10.10.2020 | ||
PT | 12.10.2020 | ||
Former [2021/24] | AL | 10.06.2020 | |
AT | 10.06.2020 | ||
CZ | 10.06.2020 | ||
DK | 10.06.2020 | ||
EE | 10.06.2020 | ||
ES | 10.06.2020 | ||
FI | 10.06.2020 | ||
HR | 10.06.2020 | ||
IT | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
MC | 10.06.2020 | ||
NL | 10.06.2020 | ||
PL | 10.06.2020 | ||
RO | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
SI | 10.06.2020 | ||
SK | 10.06.2020 | ||
SM | 10.06.2020 | ||
LU | 27.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
IS | 10.10.2020 | ||
PT | 12.10.2020 | ||
Former [2021/20] | AL | 10.06.2020 | |
AT | 10.06.2020 | ||
CZ | 10.06.2020 | ||
DK | 10.06.2020 | ||
EE | 10.06.2020 | ||
ES | 10.06.2020 | ||
FI | 10.06.2020 | ||
HR | 10.06.2020 | ||
IT | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
MC | 10.06.2020 | ||
NL | 10.06.2020 | ||
PL | 10.06.2020 | ||
RO | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
SK | 10.06.2020 | ||
SM | 10.06.2020 | ||
LU | 27.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
IS | 10.10.2020 | ||
PT | 12.10.2020 | ||
Former [2021/18] | AL | 10.06.2020 | |
AT | 10.06.2020 | ||
CZ | 10.06.2020 | ||
EE | 10.06.2020 | ||
ES | 10.06.2020 | ||
FI | 10.06.2020 | ||
HR | 10.06.2020 | ||
IT | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
MC | 10.06.2020 | ||
NL | 10.06.2020 | ||
PL | 10.06.2020 | ||
RO | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
SK | 10.06.2020 | ||
SM | 10.06.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
IS | 10.10.2020 | ||
PT | 12.10.2020 | ||
Former [2021/10] | AL | 10.06.2020 | |
AT | 10.06.2020 | ||
CZ | 10.06.2020 | ||
EE | 10.06.2020 | ||
ES | 10.06.2020 | ||
FI | 10.06.2020 | ||
HR | 10.06.2020 | ||
IT | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
NL | 10.06.2020 | ||
PL | 10.06.2020 | ||
RO | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
SK | 10.06.2020 | ||
SM | 10.06.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
IS | 10.10.2020 | ||
PT | 12.10.2020 | ||
Former [2021/09] | AL | 10.06.2020 | |
AT | 10.06.2020 | ||
CZ | 10.06.2020 | ||
EE | 10.06.2020 | ||
ES | 10.06.2020 | ||
FI | 10.06.2020 | ||
HR | 10.06.2020 | ||
IT | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
NL | 10.06.2020 | ||
RO | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
SM | 10.06.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
PT | 12.10.2020 | ||
Former [2021/04] | AL | 10.06.2020 | |
FI | 10.06.2020 | ||
HR | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
NL | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
Former [2021/01] | FI | 10.06.2020 | |
HR | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
Former [2020/51] | FI | 10.06.2020 | |
HR | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
Former [2020/50] | FI | 10.06.2020 | |
HR | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
SE | 10.06.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
Former [2020/48] | FI | 10.06.2020 | |
LT | 10.06.2020 | ||
SE | 10.06.2020 | ||
NO | 10.09.2020 | ||
Former [2020/47] | LT | 10.06.2020 | |
NO | 10.09.2020 | Documents cited: | Search | [A]US5003550 (WELCH DAVID F [US], et al) [A] 1-13 * abstract * * column 2, lines 36-45 * * column 3, lines 24-53 * * column 5, lines 20-58 *; | [A]JPH05232519 (IBIDEN CO LTD) [A] 1-13 * abstract *; | [A]JPH10111524 (MINOLTA CO LTD) [A] 1-13* abstract *; | [XAI] - MENG-HSIUNG KIANG ET AL, "Surface-micromachined diffraction gratings for scanning spectroscopic applications", INTERNATIONAL CONFERENCE ON SOLID-STATE SENSORS AND ACTUATORS; [INTERNATIONAL CONFERENCE ON SOLID-STATE SENSORS AND ACTUATORS. DIGEST OF TECHNICAL PAPERS], NEW YORK, NY : IEEE; US, (19970616), vol. 1, doi:10.1109/SENSOR.1997.613654, ISBN 978-0-7803-3829-6, pages 343 - 345, XP010240480 [X] 1 * abstract * * section "Introduction" * [A] 3-13 [I] 2 DOI: http://dx.doi.org/10.1109/SENSOR.1997.613654 | [XA] - YU DU ET AL, "A 21.5kHz high optical resolution electrostatic double-layered vibratory grating laser scanner", SENSORS AND ACTUATORS A: PHYSICAL, ELSEVIER BV, NL, vol. 168, no. 2, doi:10.1016/J.SNA.2011.04.007, ISSN 0924-4247, (20110402), pages 253 - 261, (20110408), XP028386469 [X] 1 * abstract * * section "1. Introduction" * [A] 2-13 DOI: http://dx.doi.org/10.1016/j.sna.2011.04.007 | [A] - TAO J F ET AL, "Ultra-high coupling efficiency of MEMS tunable laser via 3-dimensional micro-optical coupling system", IEEE 24TH INTERNATIONAL CONFERENCE ON MICRO ELECTRO MECHANICAL SYSTEMS (MEMS 2011), IEEE, US, (20110123), doi:10.1109/MEMSYS.2011.5734350, ISBN 978-1-4244-9632-7, pages 13 - 16, XP031982338 [A] 1-13 * abstract * * section "Introduction" * DOI: http://dx.doi.org/10.1109/MEMSYS.2011.5734350 |