Extract from the Register of European Patents

EP About this file: EP3277028

EP3277028 - METHOD AND DEVICES FOR OPERATING A MOBILE COMMUNICATIONS NETWORK [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  08.01.2021
Database last updated on 28.03.2026
FormerThe patent has been granted
Status updated on  31.01.2020
FormerGrant of patent is intended
Status updated on  28.01.2020
FormerExamination is in progress
Status updated on  17.01.2020
FormerGrant of patent is intended
Status updated on  24.10.2019
FormerExamination is in progress
Status updated on  22.02.2019
FormerRequest for examination was made
Status updated on  29.12.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Deutsche Telekom AG
Friedrich-Ebert-Allee 140
53113 Bonn / DE
[2020/10]
Former [2018/05]For all designated states
Deutsche Telekom AG
Friedrich-Ebert-Allee 140
53113 Bonn / DE
Inventor(s)01 / Sonntag, Dr. Thomas
Compbachweg 27b
53343 Wachtberg / DE
 [2018/05]
Representative(s)Vossius & Partner Patentanwälte Rechtsanwälte mbB
P.O. Box 86 07 67
81634 München / DE
[2020/10]
Former [2018/05]Patentship Patentanwaltsgesellschaft mbH
Elsenheimerstraße 65
80687 München / DE
Application number, filing date16182071.729.07.2016
[2018/05]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3277028
Date:31.01.2018
Language:DE
[2018/05]
Type: B1 Patent specification 
No.:EP3277028
Date:04.03.2020
Language:DE
[2020/10]
Search report(s)(Supplementary) European search report - dispatched on:EP16.01.2017
ClassificationIPC:H04W48/02, H04W12/12, // H04W8/22
[2019/37]
CPC:
H04W48/02 (EP,US); H04W12/126 (EP,US); H04W8/22 (EP)
Former IPC [2018/05]H04W48/02
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/05]
TitleGerman:VERFAHREN UND VORRICHTUNGEN ZUM BETREIBEN EINES MOBILFUNKNETZWERKS[2018/05]
English:METHOD AND DEVICES FOR OPERATING A MOBILE COMMUNICATIONS NETWORK[2018/05]
French:PROCEDE ET DISPOSITIF DE FONCTIONNEMENT D'UN RESEAU DE RADIOCOMMUNICATION MOBILE[2018/05]
Examination procedure29.07.2016Date on which the examining division has become responsible
05.07.2017Amendment by applicant (claims and/or description)
05.07.2017Examination requested  [2018/05]
27.02.2019Despatch of a communication from the examining division (Time limit: M04)
04.06.2019Reply to a communication from the examining division
25.10.2019Communication of intention to grant the patent
15.01.2020Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
15.01.2020Fee for grant paid
15.01.2020Fee for publishing/printing paid
28.01.2020Information about intention to grant a patent
28.01.2020Receipt of the translation of the claim(s)
Opposition(s)07.12.2020No opposition filed within time limit [2021/06]
Fees paidRenewal fee
30.07.2018Renewal fee patent year 03
22.07.2019Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU29.07.2016
AL04.03.2020
CY04.03.2020
CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
IT04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
MK04.03.2020
MT04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
TR04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
GB29.07.2020
IE29.07.2020
LU29.07.2020
PT29.07.2020
BE31.07.2020
CH31.07.2020
FR31.07.2020
LI31.07.2020
[2022/31]
Former [2022/30]HU29.07.2016
AL04.03.2020
CY04.03.2020
CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
IT04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
MT04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
TR04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
GB29.07.2020
IE29.07.2020
LU29.07.2020
PT29.07.2020
BE31.07.2020
CH31.07.2020
FR31.07.2020
LI31.07.2020
Former [2022/27]HU29.07.2016
CY04.03.2020
CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
IT04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
MT04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
TR04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
GB29.07.2020
IE29.07.2020
LU29.07.2020
PT29.07.2020
BE31.07.2020
CH31.07.2020
FR31.07.2020
LI31.07.2020
Former [2021/37]CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
IT04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
GB29.07.2020
IE29.07.2020
LU29.07.2020
PT29.07.2020
BE31.07.2020
CH31.07.2020
FR31.07.2020
LI31.07.2020
Former [2021/23]CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
IT04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
GB29.07.2020
LU29.07.2020
PT29.07.2020
BE31.07.2020
CH31.07.2020
FR31.07.2020
LI31.07.2020
Former [2021/22]CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
IT04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
GB29.07.2020
LU29.07.2020
PT29.07.2020
CH31.07.2020
LI31.07.2020
Former [2021/20]CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
IT04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
LU29.07.2020
PT29.07.2020
CH31.07.2020
LI31.07.2020
Former [2021/13]CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
IT04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2021/10]CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
IT04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2021/08]CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2020/50]CZ04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2020/49]CZ04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2020/48]ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2020/47]ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
RS04.03.2020
SE04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
Former [2020/46]FI04.03.2020
HR04.03.2020
LV04.03.2020
NL04.03.2020
RS04.03.2020
SE04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
Former [2020/45]FI04.03.2020
HR04.03.2020
LV04.03.2020
NL04.03.2020
RS04.03.2020
SE04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
Former [2020/39]FI04.03.2020
HR04.03.2020
LV04.03.2020
RS04.03.2020
SE04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
Former [2020/38]FI04.03.2020
HR04.03.2020
LV04.03.2020
RS04.03.2020
SE04.03.2020
NO04.06.2020
GR05.06.2020
Former [2020/37]FI04.03.2020
HR04.03.2020
LV04.03.2020
RS04.03.2020
SE04.03.2020
NO04.06.2020
Former [2020/35]FI04.03.2020
NO04.06.2020
Documents cited:Search[Y] US2005280557  (JHA ANJALI et al.) [Y] 1-15 * paragraph [0005] - paragraph [0006] * * paragraph [0019] * * paragraph [0023] - paragraph [0026] * * paragraph [0032] - paragraph [0036] * * paragraph [0042] * * figures 2, 4 *
 [Y] EP2975872  (SAMSUNG ELECTRONICS CO LTD et al.) [Y] 1-15 * paragraphs [0002] , [0005] - paragraph [0006] * * paragraph [0054] - paragraph [0057] * * figures 2, 5 *
 [A] US2016183166  (CHEN XUMING et al.) [A] 1-15 * paragraphs [0010] , [0013] * * paragraph [0029] - paragraph [0030] * * paragraph [0041] - paragraph [0043] * * paragraphs [0051] , [0061] , [0070] * * figures 2, 5, 6 *
 [A] US2009249443  (FITZGERALD WILLIAM et al.) [A] 1-15 * paragraph [0003] * * paragraph [0034] - paragraph [0036] * * paragraph [0073] - paragraph [0075] * * paragraph [0101] - paragraph [0102] * * figures 1, 6 *
 [A]   NGMN ALLIANCE: "NGMN 5G P1 Requirements & Architecture Work Stream End-to-End Architecture Description of Network Slicing Concept Document Type: Final Deliverable (approved) Confidentiality Class: P -Public Authorised Recipients", 13 January 2016 (2016-01-13), XP055303480, Retrieved from the Internet [retrieved on 20160916] [A] 1,7,8,14,15 * the whole document *
 [A]   RACHID EL HATTACHI ET AL: "5G White Paper", 17 February 2015 (2015-02-17), XP055242573, Retrieved from the Internet [retrieved on 20160119] [A] 1,7,8,14,15 * page 45, paragraph 5.4 - page 48, paragraph 5.4 * * figures 8, 9 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.