EP3288198 - SYSTEM AND METHOD OF CLOCK SYNCHRONIZATION IN A COMPUTER NETWORK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.03.2022 Database last updated on 04.11.2024 | |
Former | The patent has been granted Status updated on 26.03.2021 | ||
Former | Grant of patent is intended Status updated on 09.02.2021 | ||
Former | Request for examination was made Status updated on 31.08.2018 | ||
Former | The application has been published Status updated on 26.01.2018 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Robert Bosch GmbH Postfach 30 02 20 70442 Stuttgart / DE | [2020/18] |
Former [2018/09] | For all designated states ROBERT BOSCH GMBH Postfach 30 02 20 70442 Stuttgart / DE | Inventor(s) | 01 /
DIARRA, Aboubacar Linzerstrasse 6 70469 Stuttgart-Feuerbach / DE | [2018/09] | Application number, filing date | 16185277.7 | 23.08.2016 | [2018/09] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3288198 | Date: | 28.02.2018 | Language: | EN | [2018/09] | Type: | B1 Patent specification | No.: | EP3288198 | Date: | 28.04.2021 | Language: | EN | [2021/17] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 22.02.2017 | Classification | IPC: | H04J3/06, H04L12/40 | [2018/09] | CPC: |
H04J3/0664 (EP);
H04J3/0635 (CN);
H04J3/0638 (CN);
H04J3/0667 (EP);
H04L12/40202 (EP);
H04L7/00 (CN)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/40] |
Former [2018/09] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SYSTEM UND VERFAHREN ZUR TAKTSYNCHRONISIERUNG IN EINEM COMPUTERNETZWERK | [2018/09] | English: | SYSTEM AND METHOD OF CLOCK SYNCHRONIZATION IN A COMPUTER NETWORK | [2018/09] | French: | SYSTÈME ET PROCÉDÉ DE SYNCHRONISATION D'HORLOGE DANS UN RÉSEAU INFORMATIQUE | [2018/09] | Examination procedure | 23.08.2016 | Date on which the examining division has become responsible | 13.08.2018 | Amendment by applicant (claims and/or description) | 28.08.2018 | Examination requested [2018/40] | 10.02.2021 | Communication of intention to grant the patent | 17.03.2021 | Fee for grant paid | 17.03.2021 | Fee for publishing/printing paid | 17.03.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 31.01.2022 | No opposition filed within time limit [2022/14] | Fees paid | Renewal fee | 31.08.2018 | Renewal fee patent year 03 | 02.09.2019 | Renewal fee patent year 04 | 31.08.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.08.2016 | AL | 28.04.2021 | AT | 28.04.2021 | CY | 28.04.2021 | CZ | 28.04.2021 | DK | 28.04.2021 | EE | 28.04.2021 | ES | 28.04.2021 | FI | 28.04.2021 | HR | 28.04.2021 | IT | 28.04.2021 | LT | 28.04.2021 | LV | 28.04.2021 | MC | 28.04.2021 | MK | 28.04.2021 | MT | 28.04.2021 | NL | 28.04.2021 | PL | 28.04.2021 | RO | 28.04.2021 | RS | 28.04.2021 | SE | 28.04.2021 | SI | 28.04.2021 | SK | 28.04.2021 | SM | 28.04.2021 | BG | 28.07.2021 | NO | 28.07.2021 | GR | 29.07.2021 | GB | 23.08.2021 | IE | 23.08.2021 | LU | 23.08.2021 | IS | 28.08.2021 | PT | 30.08.2021 | BE | 31.08.2021 | CH | 31.08.2021 | FR | 31.08.2021 | LI | 31.08.2021 | [2024/41] |
Former [2024/22] | HU | 23.08.2016 | |
AL | 28.04.2021 | ||
AT | 28.04.2021 | ||
CY | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
MK | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
GB | 23.08.2021 | ||
IE | 23.08.2021 | ||
LU | 23.08.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2023/30] | HU | 23.08.2016 | |
AL | 28.04.2021 | ||
AT | 28.04.2021 | ||
CY | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
GB | 23.08.2021 | ||
IE | 23.08.2021 | ||
LU | 23.08.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2023/29] | HU | 23.08.2016 | |
AL | 28.04.2021 | ||
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
GB | 23.08.2021 | ||
IE | 23.08.2021 | ||
LU | 23.08.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/36] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
GB | 23.08.2021 | ||
IE | 23.08.2021 | ||
LU | 23.08.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/35] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
GB | 23.08.2021 | ||
IE | 23.08.2021 | ||
LU | 23.08.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/34] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
LU | 23.08.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/29] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
LU | 23.08.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/26] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
LU | 23.08.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/23] | AT | 28.04.2021 | |
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
LU | 23.08.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/21] | AT | 28.04.2021 | |
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
PT | 30.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
IS | 22.12.2021 | ||
Former [2022/18] | AT | 28.04.2021 | |
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
PT | 30.08.2021 | ||
IS | 22.12.2021 | ||
Former [2022/10] | AT | 28.04.2021 | |
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
PT | 30.08.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 28.04.2021 | |
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/08] | AT | 28.04.2021 | |
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/07] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2021/52] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2021/51] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2021/50] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
SE | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
PT | 30.08.2021 | ||
Former [2021/49] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
SE | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
Former [2021/47] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
LT | 28.04.2021 | ||
NL | 28.04.2021 | ||
BG | 28.07.2021 | ||
Former [2021/46] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
LT | 28.04.2021 | Documents cited: | Search | [XI]US2013163617 (CHANDRA PRASHANT R [US], et al) [X] 1,8,9 * paragraph [0088] - paragraph [0091] * * paragraph [0098] - paragraph [0099] * * paragraph [0101] - paragraph [0105] * * figures 10,21 * [I] 2-7; | [I]US2005055469 (SCHEELE OLIVER [DE]) [I] 1,8,9 * paragraph [0001] - paragraph [0004] * * paragraph [0008] - paragraph [0010] * * paragraph [0014] - paragraph [0015] * * paragraph [0022] - paragraph [0033] * * paragraph [0038] - paragraph [0040] * * figure 1 *; | [A]WO2013189536 (NOKIA SIEMENS NETWORKS OY [FI], et al) [A] 1-9 * page 1, line 5 - line 25 * * page 3, line 23 - page 4, line 14 * * page 4, line 27 - line 39 * * figures 1,3 * |