| EP3144154 - TERMINAL CONNECTION ASSEMBLY AND CARTRIDGE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 21.01.2022 Database last updated on 30.03.2026 | |
| Former | The patent has been granted Status updated on 12.02.2021 | ||
| Former | Grant of patent is intended Status updated on 03.11.2020 | ||
| Former | Examination is in progress Status updated on 02.07.2019 | ||
| Former | Request for examination was made Status updated on 28.07.2017 | ||
| Former | The application has been published Status updated on 17.02.2017 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Seiko Epson Corporation 1-6, Shinjuku 4-chome Shinjuku-ku Tokyo 160-8801 / JP | [2017/12] | Inventor(s) | 01 /
Ishizawa, Taku c/o Seiko Epson Corporation 3-5, Owa 3-chome Suwa-shi Nagano 392-8502 / JP | 02 /
Kawate, Hiroyuki c/o Seiko Epson Corporation 3-5, Owa 3-chome Suwa-shi Nagano 392-8502 / JP | 03 /
Miyata, Yoshinao - Deceased / JP | [2021/11] |
| Former [2017/12] | 01 /
Ishizawa, Taku c/o Seiko Epson Corporation 3-5, Owa 3-chome Suwa-shi Nagano, 392-8502 / JP | ||
| 02 /
Kawate, Hiroyuki c/o Seiko Epson Corporation 3-5, Owa 3-chome Suwa-shi Nagano, 392-8502 / JP | |||
| 03 /
Miyata, Yoshinao - DECEASED c/o Seiko Epson Corporation 3-5, Owa 3-chome Suwa-shi Nagano, 392-8502 / JP | Representative(s) | Hoffmann Eitle Patent- und Rechtsanwälte PartmbB Arabellastraße 30 81925 München / DE | [2017/12] | Application number, filing date | 16188724.5 | 14.09.2016 | [2017/12] | Priority number, date | JP20150185884 | 18.09.2015 Original published format: JP 2015185884 | [2017/12] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3144154 | Date: | 22.03.2017 | Language: | EN | [2017/12] | Type: | B1 Patent specification | No.: | EP3144154 | Date: | 17.03.2021 | Language: | EN | [2021/11] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 31.01.2017 | Classification | IPC: | B41J2/175 | [2017/12] | CPC: |
B41J2/17526 (EP,US);
B41J2/21 (CN);
H01R13/631 (US);
B41J2/17503 (CN);
B41J25/00 (CN);
H01R12/57 (US);
H01R2201/06 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/35] |
| Former [2017/12] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | KLEMMENANSCHLUSSANORDNUNGEN UND KARTUSCHE | [2017/12] | English: | TERMINAL CONNECTION ASSEMBLY AND CARTRIDGE | [2017/12] | French: | ENSEMBLE DE CONNEXION DE TERMINAL ET CARTOUCHE | [2017/12] | Examination procedure | 14.09.2016 | Date on which the examining division has become responsible | 24.07.2017 | Examination requested [2017/35] | 16.08.2017 | Amendment by applicant (claims and/or description) | 05.07.2019 | Despatch of a communication from the examining division (Time limit: M04) | 06.11.2019 | Reply to a communication from the examining division | 12.02.2020 | Despatch of a communication from the examining division (Time limit: M04) | 22.04.2020 | Reply to a communication from the examining division | 04.11.2020 | Communication of intention to grant the patent | 09.02.2021 | Fee for grant paid | 09.02.2021 | Fee for publishing/printing paid | 09.02.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 20.12.2021 | No opposition filed within time limit [2022/08] | Fees paid | Renewal fee | 03.09.2018 | Renewal fee patent year 03 | 05.09.2019 | Renewal fee patent year 04 | 07.09.2020 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.09.2016 | AL | 17.03.2021 | AT | 17.03.2021 | CY | 17.03.2021 | CZ | 17.03.2021 | DK | 17.03.2021 | EE | 17.03.2021 | ES | 17.03.2021 | FI | 17.03.2021 | HR | 17.03.2021 | IT | 17.03.2021 | LT | 17.03.2021 | LV | 17.03.2021 | MC | 17.03.2021 | MK | 17.03.2021 | MT | 17.03.2021 | NL | 17.03.2021 | PL | 17.03.2021 | RO | 17.03.2021 | RS | 17.03.2021 | SE | 17.03.2021 | SI | 17.03.2021 | SK | 17.03.2021 | SM | 17.03.2021 | TR | 17.03.2021 | BG | 17.06.2021 | NO | 17.06.2021 | GR | 18.06.2021 | IS | 17.07.2021 | PT | 19.07.2021 | GB | 14.09.2021 | IE | 14.09.2021 | LU | 14.09.2021 | BE | 30.09.2021 | CH | 30.09.2021 | FR | 30.09.2021 | LI | 30.09.2021 | [2026/04] |
| Former [2024/41] | HU | 14.09.2016 | |
| AL | 17.03.2021 | ||
| AT | 17.03.2021 | ||
| CY | 17.03.2021 | ||
| CZ | 17.03.2021 | ||
| DK | 17.03.2021 | ||
| EE | 17.03.2021 | ||
| ES | 17.03.2021 | ||
| FI | 17.03.2021 | ||
| HR | 17.03.2021 | ||
| IT | 17.03.2021 | ||
| LT | 17.03.2021 | ||
| LV | 17.03.2021 | ||
| MC | 17.03.2021 | ||
| MK | 17.03.2021 | ||
| MT | 17.03.2021 | ||
| NL | 17.03.2021 | ||
| PL | 17.03.2021 | ||
| RO | 17.03.2021 | ||
| RS | 17.03.2021 | ||
| SE | 17.03.2021 | ||
| SI | 17.03.2021 | ||
| SK | 17.03.2021 | ||
| SM | 17.03.2021 | ||
| BG | 17.06.2021 | ||
| NO | 17.06.2021 | ||
| GR | 18.06.2021 | ||
| IS | 17.07.2021 | ||
| PT | 19.07.2021 | ||
| GB | 14.09.2021 | ||
| IE | 14.09.2021 | ||
| LU | 14.09.2021 | ||
| BE | 30.09.2021 | ||
| CH | 30.09.2021 | ||
| FR | 30.09.2021 | ||
| LI | 30.09.2021 | ||
| Former [2024/22] | HU | 14.09.2016 | |
| AL | 17.03.2021 | ||
| AT | 17.03.2021 | ||
| CY | 17.03.2021 | ||
| CZ | 17.03.2021 | ||
| DK | 17.03.2021 | ||
| EE | 17.03.2021 | ||
| ES | 17.03.2021 | ||
| FI | 17.03.2021 | ||
| HR | 17.03.2021 | ||
| IT | 17.03.2021 | ||
| LT | 17.03.2021 | ||
| LV | 17.03.2021 | ||
| MC | 17.03.2021 | ||
| MK | 17.03.2021 | ||
| NL | 17.03.2021 | ||
| PL | 17.03.2021 | ||
| RO | 17.03.2021 | ||
| RS | 17.03.2021 | ||
| SE | 17.03.2021 | ||
| SI | 17.03.2021 | ||
| SK | 17.03.2021 | ||
| SM | 17.03.2021 | ||
| BG | 17.06.2021 | ||
| NO | 17.06.2021 | ||
| GR | 18.06.2021 | ||
| IS | 17.07.2021 | ||
| PT | 19.07.2021 | ||
| GB | 14.09.2021 | ||
| IE | 14.09.2021 | ||
| LU | 14.09.2021 | ||
| BE | 30.09.2021 | ||
| CH | 30.09.2021 | ||
| FR | 30.09.2021 | ||
| LI | 30.09.2021 | ||
| Former [2023/30] | HU | 14.09.2016 | |
| AL | 17.03.2021 | ||
| AT | 17.03.2021 | ||
| CY | 17.03.2021 | ||
| CZ | 17.03.2021 | ||
| DK | 17.03.2021 | ||
| EE | 17.03.2021 | ||
| ES | 17.03.2021 | ||
| FI | 17.03.2021 | ||
| HR | 17.03.2021 | ||
| IT | 17.03.2021 | ||
| LT | 17.03.2021 | ||
| LV | 17.03.2021 | ||
| MC | 17.03.2021 | ||
| NL | 17.03.2021 | ||
| PL | 17.03.2021 | ||
| RO | 17.03.2021 | ||
| RS | 17.03.2021 | ||
| SE | 17.03.2021 | ||
| SI | 17.03.2021 | ||
| SK | 17.03.2021 | ||
| SM | 17.03.2021 | ||
| BG | 17.06.2021 | ||
| NO | 17.06.2021 | ||
| GR | 18.06.2021 | ||
| IS | 17.07.2021 | ||
| PT | 19.07.2021 | ||
| GB | 14.09.2021 | ||
| IE | 14.09.2021 | ||
| LU | 14.09.2021 | ||
| BE | 30.09.2021 | ||
| CH | 30.09.2021 | ||
| FR | 30.09.2021 | ||
| LI | 30.09.2021 | ||
| Former [2023/29] | HU | 14.09.2016 | |
| AL | 17.03.2021 | ||
| AT | 17.03.2021 | ||
| CZ | 17.03.2021 | ||
| DK | 17.03.2021 | ||
| EE | 17.03.2021 | ||
| ES | 17.03.2021 | ||
| FI | 17.03.2021 | ||
| HR | 17.03.2021 | ||
| IT | 17.03.2021 | ||
| LT | 17.03.2021 | ||
| LV | 17.03.2021 | ||
| MC | 17.03.2021 | ||
| NL | 17.03.2021 | ||
| PL | 17.03.2021 | ||
| RO | 17.03.2021 | ||
| RS | 17.03.2021 | ||
| SE | 17.03.2021 | ||
| SI | 17.03.2021 | ||
| SK | 17.03.2021 | ||
| SM | 17.03.2021 | ||
| BG | 17.06.2021 | ||
| NO | 17.06.2021 | ||
| GR | 18.06.2021 | ||
| IS | 17.07.2021 | ||
| PT | 19.07.2021 | ||
| GB | 14.09.2021 | ||
| IE | 14.09.2021 | ||
| LU | 14.09.2021 | ||
| BE | 30.09.2021 | ||
| CH | 30.09.2021 | ||
| FR | 30.09.2021 | ||
| LI | 30.09.2021 | ||
| Former [2022/37] | AL | 17.03.2021 | |
| AT | 17.03.2021 | ||
| CZ | 17.03.2021 | ||
| DK | 17.03.2021 | ||
| EE | 17.03.2021 | ||
| ES | 17.03.2021 | ||
| FI | 17.03.2021 | ||
| HR | 17.03.2021 | ||
| IT | 17.03.2021 | ||
| LT | 17.03.2021 | ||
| LV | 17.03.2021 | ||
| MC | 17.03.2021 | ||
| NL | 17.03.2021 | ||
| PL | 17.03.2021 | ||
| RO | 17.03.2021 | ||
| RS | 17.03.2021 | ||
| SE | 17.03.2021 | ||
| SI | 17.03.2021 | ||
| SK | 17.03.2021 | ||
| SM | 17.03.2021 | ||
| BG | 17.06.2021 | ||
| NO | 17.06.2021 | ||
| GR | 18.06.2021 | ||
| IS | 17.07.2021 | ||
| PT | 19.07.2021 | ||
| GB | 14.09.2021 | ||
| IE | 14.09.2021 | ||
| LU | 14.09.2021 | ||
| BE | 30.09.2021 | ||
| CH | 30.09.2021 | ||
| FR | 30.09.2021 | ||
| LI | 30.09.2021 | ||
| Former [2022/35] | AL | 17.03.2021 | |
| AT | 17.03.2021 | ||
| CZ | 17.03.2021 | ||
| DK | 17.03.2021 | ||
| EE | 17.03.2021 | ||
| ES | 17.03.2021 | ||
| FI | 17.03.2021 | ||
| HR | 17.03.2021 | ||
| IT | 17.03.2021 | ||
| LT | 17.03.2021 | ||
| LV | 17.03.2021 | ||
| MC | 17.03.2021 | ||
| NL | 17.03.2021 | ||
| PL | 17.03.2021 | ||
| RO | 17.03.2021 | ||
| RS | 17.03.2021 | ||
| SE | 17.03.2021 | ||
| SI | 17.03.2021 | ||
| SK | 17.03.2021 | ||
| SM | 17.03.2021 | ||
| BG | 17.06.2021 | ||
| NO | 17.06.2021 | ||
| GR | 18.06.2021 | ||
| IS | 17.07.2021 | ||
| PT | 19.07.2021 | ||
| GB | 14.09.2021 | ||
| IE | 14.09.2021 | ||
| LU | 14.09.2021 | ||
| BE | 30.09.2021 | ||
| FR | 30.09.2021 | ||
| Former [2022/34] | AL | 17.03.2021 | |
| AT | 17.03.2021 | ||
| CZ | 17.03.2021 | ||
| DK | 17.03.2021 | ||
| EE | 17.03.2021 | ||
| ES | 17.03.2021 | ||
| FI | 17.03.2021 | ||
| HR | 17.03.2021 | ||
| IT | 17.03.2021 | ||
| LT | 17.03.2021 | ||
| LV | 17.03.2021 | ||
| MC | 17.03.2021 | ||
| NL | 17.03.2021 | ||
| PL | 17.03.2021 | ||
| RO | 17.03.2021 | ||
| RS | 17.03.2021 | ||
| SE | 17.03.2021 | ||
| SI | 17.03.2021 | ||
| SK | 17.03.2021 | ||
| SM | 17.03.2021 | ||
| BG | 17.06.2021 | ||
| NO | 17.06.2021 | ||
| GR | 18.06.2021 | ||
| IS | 17.07.2021 | ||
| PT | 19.07.2021 | ||
| LU | 14.09.2021 | ||
| BE | 30.09.2021 | ||
| FR | 30.09.2021 | ||
| Former [2022/25] | AL | 17.03.2021 | |
| AT | 17.03.2021 | ||
| CZ | 17.03.2021 | ||
| DK | 17.03.2021 | ||
| EE | 17.03.2021 | ||
| ES | 17.03.2021 | ||
| FI | 17.03.2021 | ||
| HR | 17.03.2021 | ||
| IT | 17.03.2021 | ||
| LT | 17.03.2021 | ||
| LV | 17.03.2021 | ||
| MC | 17.03.2021 | ||
| NL | 17.03.2021 | ||
| PL | 17.03.2021 | ||
| RO | 17.03.2021 | ||
| RS | 17.03.2021 | ||
| SE | 17.03.2021 | ||
| SI | 17.03.2021 | ||
| SK | 17.03.2021 | ||
| SM | 17.03.2021 | ||
| BG | 17.06.2021 | ||
| NO | 17.06.2021 | ||
| GR | 18.06.2021 | ||
| IS | 17.07.2021 | ||
| PT | 19.07.2021 | ||
| Former [2022/23] | AL | 17.03.2021 | |
| AT | 17.03.2021 | ||
| CZ | 17.03.2021 | ||
| DK | 17.03.2021 | ||
| EE | 17.03.2021 | ||
| ES | 17.03.2021 | ||
| FI | 17.03.2021 | ||
| HR | 17.03.2021 | ||
| IT | 17.03.2021 | ||
| LT | 17.03.2021 | ||
| LV | 17.03.2021 | ||
| NL | 17.03.2021 | ||
| PL | 17.03.2021 | ||
| RO | 17.03.2021 | ||
| RS | 17.03.2021 | ||
| SE | 17.03.2021 | ||
| SI | 17.03.2021 | ||
| SK | 17.03.2021 | ||
| SM | 17.03.2021 | ||
| BG | 17.06.2021 | ||
| NO | 17.06.2021 | ||
| GR | 18.06.2021 | ||
| IS | 17.07.2021 | ||
| PT | 19.07.2021 | ||
| Former [2022/13] | AL | 17.03.2021 | |
| AT | 17.03.2021 | ||
| CZ | 17.03.2021 | ||
| DK | 17.03.2021 | ||
| EE | 17.03.2021 | ||
| ES | 17.03.2021 | ||
| FI | 17.03.2021 | ||
| HR | 17.03.2021 | ||
| LT | 17.03.2021 | ||
| LV | 17.03.2021 | ||
| NL | 17.03.2021 | ||
| PL | 17.03.2021 | ||
| RO | 17.03.2021 | ||
| RS | 17.03.2021 | ||
| SE | 17.03.2021 | ||
| SI | 17.03.2021 | ||
| SK | 17.03.2021 | ||
| SM | 17.03.2021 | ||
| BG | 17.06.2021 | ||
| NO | 17.06.2021 | ||
| GR | 18.06.2021 | ||
| PT | 19.07.2021 | ||
| Former [2022/10] | AL | 17.03.2021 | |
| AT | 17.03.2021 | ||
| CZ | 17.03.2021 | ||
| DK | 17.03.2021 | ||
| EE | 17.03.2021 | ||
| ES | 17.03.2021 | ||
| FI | 17.03.2021 | ||
| HR | 17.03.2021 | ||
| LT | 17.03.2021 | ||
| LV | 17.03.2021 | ||
| NL | 17.03.2021 | ||
| PL | 17.03.2021 | ||
| RO | 17.03.2021 | ||
| RS | 17.03.2021 | ||
| SE | 17.03.2021 | ||
| SK | 17.03.2021 | ||
| SM | 17.03.2021 | ||
| BG | 17.06.2021 | ||
| NO | 17.06.2021 | ||
| GR | 18.06.2021 | ||
| PT | 19.07.2021 | ||
| Former [2022/08] | AL | 17.03.2021 | |
| AT | 17.03.2021 | ||
| CZ | 17.03.2021 | ||
| DK | 17.03.2021 | ||
| EE | 17.03.2021 | ||
| ES | 17.03.2021 | ||
| FI | 17.03.2021 | ||
| HR | 17.03.2021 | ||
| LT | 17.03.2021 | ||
| LV | 17.03.2021 | ||
| NL | 17.03.2021 | ||
| PL | 17.03.2021 | ||
| RO | 17.03.2021 | ||
| RS | 17.03.2021 | ||
| SE | 17.03.2021 | ||
| SK | 17.03.2021 | ||
| SM | 17.03.2021 | ||
| BG | 17.06.2021 | ||
| NO | 17.06.2021 | ||
| GR | 18.06.2021 | ||
| IS | 17.07.2021 | ||
| PT | 19.07.2021 | ||
| Former [2022/07] | AL | 17.03.2021 | |
| AT | 17.03.2021 | ||
| CZ | 17.03.2021 | ||
| EE | 17.03.2021 | ||
| ES | 17.03.2021 | ||
| FI | 17.03.2021 | ||
| HR | 17.03.2021 | ||
| LT | 17.03.2021 | ||
| LV | 17.03.2021 | ||
| NL | 17.03.2021 | ||
| PL | 17.03.2021 | ||
| RO | 17.03.2021 | ||
| RS | 17.03.2021 | ||
| SE | 17.03.2021 | ||
| SK | 17.03.2021 | ||
| SM | 17.03.2021 | ||
| BG | 17.06.2021 | ||
| NO | 17.06.2021 | ||
| GR | 18.06.2021 | ||
| IS | 17.07.2021 | ||
| PT | 19.07.2021 | ||
| Former [2021/52] | AT | 17.03.2021 | |
| CZ | 17.03.2021 | ||
| EE | 17.03.2021 | ||
| ES | 17.03.2021 | ||
| FI | 17.03.2021 | ||
| HR | 17.03.2021 | ||
| LT | 17.03.2021 | ||
| LV | 17.03.2021 | ||
| NL | 17.03.2021 | ||
| PL | 17.03.2021 | ||
| RO | 17.03.2021 | ||
| RS | 17.03.2021 | ||
| SE | 17.03.2021 | ||
| SK | 17.03.2021 | ||
| SM | 17.03.2021 | ||
| BG | 17.06.2021 | ||
| NO | 17.06.2021 | ||
| GR | 18.06.2021 | ||
| IS | 17.07.2021 | ||
| PT | 19.07.2021 | ||
| Former [2021/51] | AT | 17.03.2021 | |
| CZ | 17.03.2021 | ||
| EE | 17.03.2021 | ||
| ES | 17.03.2021 | ||
| FI | 17.03.2021 | ||
| HR | 17.03.2021 | ||
| LT | 17.03.2021 | ||
| LV | 17.03.2021 | ||
| NL | 17.03.2021 | ||
| RO | 17.03.2021 | ||
| RS | 17.03.2021 | ||
| SE | 17.03.2021 | ||
| SK | 17.03.2021 | ||
| SM | 17.03.2021 | ||
| BG | 17.06.2021 | ||
| NO | 17.06.2021 | ||
| GR | 18.06.2021 | ||
| IS | 17.07.2021 | ||
| PT | 19.07.2021 | ||
| Former [2021/50] | AT | 17.03.2021 | |
| CZ | 17.03.2021 | ||
| EE | 17.03.2021 | ||
| FI | 17.03.2021 | ||
| HR | 17.03.2021 | ||
| LT | 17.03.2021 | ||
| LV | 17.03.2021 | ||
| NL | 17.03.2021 | ||
| RO | 17.03.2021 | ||
| RS | 17.03.2021 | ||
| SE | 17.03.2021 | ||
| SK | 17.03.2021 | ||
| SM | 17.03.2021 | ||
| BG | 17.06.2021 | ||
| NO | 17.06.2021 | ||
| GR | 18.06.2021 | ||
| PT | 19.07.2021 | ||
| Former [2021/48] | AT | 17.03.2021 | |
| CZ | 17.03.2021 | ||
| EE | 17.03.2021 | ||
| FI | 17.03.2021 | ||
| HR | 17.03.2021 | ||
| LT | 17.03.2021 | ||
| LV | 17.03.2021 | ||
| NL | 17.03.2021 | ||
| RS | 17.03.2021 | ||
| SE | 17.03.2021 | ||
| SM | 17.03.2021 | ||
| BG | 17.06.2021 | ||
| NO | 17.06.2021 | ||
| GR | 18.06.2021 | ||
| Former [2021/46] | AT | 17.03.2021 | |
| FI | 17.03.2021 | ||
| HR | 17.03.2021 | ||
| LT | 17.03.2021 | ||
| LV | 17.03.2021 | ||
| NL | 17.03.2021 | ||
| RS | 17.03.2021 | ||
| SE | 17.03.2021 | ||
| SM | 17.03.2021 | ||
| BG | 17.06.2021 | ||
| NO | 17.06.2021 | ||
| GR | 18.06.2021 | ||
| Former [2021/43] | FI | 17.03.2021 | |
| HR | 17.03.2021 | ||
| LV | 17.03.2021 | ||
| NL | 17.03.2021 | ||
| RS | 17.03.2021 | ||
| SE | 17.03.2021 | ||
| BG | 17.06.2021 | ||
| NO | 17.06.2021 | ||
| GR | 18.06.2021 | ||
| Former [2021/38] | FI | 17.03.2021 | |
| HR | 17.03.2021 | ||
| LV | 17.03.2021 | ||
| RS | 17.03.2021 | ||
| SE | 17.03.2021 | ||
| BG | 17.06.2021 | ||
| NO | 17.06.2021 | ||
| GR | 18.06.2021 | ||
| Former [2021/37] | FI | 17.03.2021 | |
| HR | 17.03.2021 | ||
| LV | 17.03.2021 | ||
| RS | 17.03.2021 | ||
| BG | 17.06.2021 | ||
| NO | 17.06.2021 | ||
| GR | 18.06.2021 | ||
| Former [2021/36] | FI | 17.03.2021 | |
| HR | 17.03.2021 | ||
| BG | 17.06.2021 | ||
| NO | 17.06.2021 | ||
| GR | 18.06.2021 | ||
| Former [2021/35] | FI | 17.03.2021 | |
| HR | 17.03.2021 | ||
| NO | 17.06.2021 | ||
| Former [2021/33] | FI | 17.03.2021 | |
| NO | 17.06.2021 | Documents cited: | Search | [X] AU2014246601 (SEIKO EPSON CORP et al.) | [X] EP2886346 (SEIKO EPSON CORP et al.) [X] 1-12 * paragraphs [0052] , [0 58] , [0 81] , [0 83] , [0 84] , [0 90] , [ 101] , [ 102] * * paragraphs [0104] , [ 105] , [ 114] , [ 128] , [ 132] * * figures 1, 2, 3, 10, 14, 19, 21, 27, 28, 29, 32 * | [X] EP2703167 (SEIKO EPSON CORP et al.) [X] 1-12 * paragraphs [0045] , [0 48] , [0 52] , [0 53] , [0 55]; figures 3, 5, 12, 13, 14, 15 * | [XA] EP2803488 (SEIKO EPSON CORP et al.) [X] 1,12 * paragraphs [0007] , [00 9] , [0 13] , [0 16] , [0 18] , [0 25] , [ 122] , [ 134] , [ 214] , [ 215] , [ 216] , [ 217]; figures 2, 7B, 23, 24A *[A] 2-11 | [XA] US2012056955 (KODAMA HIDETOSHI et al.) [X] 1,12 * paragraphs [0024] , [0 26] , [0 34] , [0 35] , [0 36] , [0 37]; figures 1, 2, 3, 10, 22, 23, 24 *[A] 2-11 | [XA] US2013182052 (MATSUZAKI KAZUTOSHI et al.) [X] 1,12 * paragraphs [0005] , [0 10] , [0 17] , [0 24] , [0 34] , [ 148] , [ 155]; figures 1, 3,11B, 13B, 13C *[A] 2-11 | by applicant | JP2014061693 |