EP3123985 - DELIVERY SYSTEM FOR EXPANDABLE STENTS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 31.12.2021 Database last updated on 18.10.2024 | |
Former | The patent has been granted Status updated on 22.01.2021 | ||
Former | Grant of patent is intended Status updated on 27.10.2020 | ||
Former | Request for examination was made Status updated on 18.09.2020 | ||
Former | Grant of patent is intended Status updated on 12.05.2020 | ||
Former | Request for examination was made Status updated on 04.08.2017 | ||
Former | The application has been published Status updated on 30.12.2016 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states DePuy Synthes Products, LLC 325 Paramount Drive Raynham, MA 02767 / US | [2017/05] | Inventor(s) | 01 /
GIRNARY, Hussein H. 79 SW 12th Street PH108 Miami, FL 33130 / US | 02 /
SOTODELVALLE, Ariel 6987 NW 168 Street Hialeah, FL 33015 / US | 03 /
LORENZO, Juan A. 3650 SW 106 Terr. Davie, FL 33328 / US | 04 /
FORSYTHE, Peter 79 SW 12th Street Apt., 3402 Miami, FL 33130 / US | [2017/05] | Representative(s) | Carpmaels & Ransford LLP One Southampton Row London WC1B 5HA / GB | [2017/05] | Application number, filing date | 16189783.0 | 12.03.2014 | [2017/05] | Priority number, date | US201313801905 | 13.03.2013 Original published format: US201313801905 | [2017/05] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3123985 | Date: | 01.02.2017 | Language: | EN | [2017/05] | Type: | B1 Patent specification | No.: | EP3123985 | Date: | 24.02.2021 | Language: | EN | [2021/08] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 23.11.2016 | Classification | IPC: | A61F2/966, A61F2/848 | [2017/05] | CPC: |
A61F2/966 (EP,US);
A61F2/848 (EP,US);
A61F2/91 (EP,US);
A61F2002/9665 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/36] |
Former [2017/05] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | ABGABESYSTEM FÜR EXPANDIERBARE STENTS | [2017/05] | English: | DELIVERY SYSTEM FOR EXPANDABLE STENTS | [2017/05] | French: | SYSTÈME D'ADMINISTRATION POUR DES ENDOPROTHÈSES EXTENSIBLES | [2017/05] | Examination procedure | 20.09.2016 | Date on which the examining division has become responsible | 01.08.2017 | Amendment by applicant (claims and/or description) | 01.08.2017 | Examination requested [2017/36] | 13.05.2020 | Communication of intention to grant the patent | 16.09.2020 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 28.10.2020 | Communication of intention to grant the patent | 14.01.2021 | Fee for grant paid | 14.01.2021 | Fee for publishing/printing paid | 14.01.2021 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP14159030.7 / EP2777649 | Opposition(s) | 25.11.2021 | No opposition filed within time limit [2022/05] | Fees paid | Renewal fee | 20.09.2016 | Renewal fee patent year 03 | 10.03.2017 | Renewal fee patent year 04 | 13.03.2018 | Renewal fee patent year 05 | 13.03.2019 | Renewal fee patent year 06 | 12.03.2020 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.03.2014 | AL | 24.02.2021 | AT | 24.02.2021 | CY | 24.02.2021 | CZ | 24.02.2021 | DK | 24.02.2021 | EE | 24.02.2021 | FI | 24.02.2021 | HR | 24.02.2021 | LT | 24.02.2021 | LV | 24.02.2021 | MC | 24.02.2021 | MK | 24.02.2021 | MT | 24.02.2021 | NL | 24.02.2021 | PL | 24.02.2021 | RO | 24.02.2021 | RS | 24.02.2021 | SE | 24.02.2021 | SI | 24.02.2021 | SK | 24.02.2021 | SM | 24.02.2021 | TR | 24.02.2021 | IE | 12.03.2021 | LU | 12.03.2021 | ES | 13.03.2021 | BE | 31.03.2021 | BG | 24.05.2021 | NO | 24.05.2021 | GR | 25.05.2021 | IS | 24.06.2021 | PT | 24.06.2021 | [2024/41] |
Former [2024/29] | HU | 12.03.2014 | |
AL | 24.02.2021 | ||
AT | 24.02.2021 | ||
CY | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
MK | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
TR | 24.02.2021 | ||
IE | 12.03.2021 | ||
LU | 12.03.2021 | ||
ES | 13.03.2021 | ||
BE | 31.03.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2024/22] | HU | 12.03.2014 | |
AL | 24.02.2021 | ||
AT | 24.02.2021 | ||
CY | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
MK | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
IE | 12.03.2021 | ||
LU | 12.03.2021 | ||
ES | 13.03.2021 | ||
BE | 31.03.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2023/30] | HU | 12.03.2014 | |
AL | 24.02.2021 | ||
AT | 24.02.2021 | ||
CY | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
IE | 12.03.2021 | ||
LU | 12.03.2021 | ||
ES | 13.03.2021 | ||
BE | 31.03.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2023/27] | HU | 12.03.2014 | |
AL | 24.02.2021 | ||
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
IE | 12.03.2021 | ||
LU | 12.03.2021 | ||
ES | 13.03.2021 | ||
BE | 31.03.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2022/34] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
IE | 12.03.2021 | ||
LU | 12.03.2021 | ||
ES | 13.03.2021 | ||
BE | 31.03.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2022/23] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
IE | 12.03.2021 | ||
LU | 12.03.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2022/13] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
IE | 12.03.2021 | ||
LU | 12.03.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2022/10] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
IE | 12.03.2021 | ||
LU | 12.03.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2022/09] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
IE | 12.03.2021 | ||
LU | 12.03.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2022/07] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
IE | 12.03.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/50] | AT | 24.02.2021 | |
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/49] | AT | 24.02.2021 | |
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/48] | AT | 24.02.2021 | |
CZ | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/46] | AT | 24.02.2021 | |
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/42] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/39] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2021/38] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2021/37] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
RS | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2021/36] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2021/35] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
NO | 24.05.2021 | ||
PT | 24.06.2021 | ||
Former [2021/33] | FI | 24.02.2021 | |
LT | 24.02.2021 | ||
NO | 24.05.2021 | ||
PT | 24.06.2021 | Documents cited: | Search | [X]EP1400219 (CORDIS NEUROVASCULAR INC [US]) [X] 1-9,14,15 * paragraphs [0024] - [0045]; figures 1-13 *; | [X]US2007255385 (TENNE DIRK [US], et al) [X] 1-9,14,15 * paragraphs [0020] - [0039]; figures 1-3 *; | [A]US2009306761 (HEBERT STEPHEN [US], et al) [A] 10-13 * paragraph [0105]; figure 40 *; | [A]US2011301690 (GIASOLLI ROBERT [US], et al) [A] 1-15* paragraphs [0065] - [0067] - [ 0122] - [0123]; figures 4B-5C * |