EP3141528 - POLYCRYSTALLINE METAL OXIDE, METHODS OF MANUFACTURE THEREOF, AND ARTICLES COMPRISING THE SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.07.2020 Database last updated on 14.11.2024 | |
Former | The patent has been granted Status updated on 02.08.2019 | ||
Former | Grant of patent is intended Status updated on 25.03.2019 | ||
Former | Examination is in progress Status updated on 20.07.2018 | ||
Former | Request for examination was made Status updated on 22.09.2017 | ||
Former | The application has been published Status updated on 10.02.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states TIAX LLC 35 Hartwell Avenue Lexington, MA 02421 / US | [2017/11] | Inventor(s) | 01 /
OFER, David 37 Booth Street Needham, MA 02494 / US | 02 /
PULLEN, Adrian 65 Boylston Street Boston, MA 02130 / US | 03 /
SRIRAMULU, Suresh 23 Virginia Road Arlington, MA 02476 / US | [2017/11] | Representative(s) | Verhorevoort, Kerry Linda Bridle Intellectual Property Limited 6F Thomas Way Lakesview International Business Park Canterbury, Kent CT3 4JZ / GB | [2017/11] | Application number, filing date | 16190160.8 | 27.07.2012 | [2017/11] | Priority number, date | US201161575115P | 16.08.2011 Original published format: US 201161575115 P | [2017/11] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3141528 | Date: | 15.03.2017 | Language: | EN | [2017/11] | Type: | B1 Patent specification | No.: | EP3141528 | Date: | 04.09.2019 | Language: | EN | [2019/36] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 13.01.2017 | Classification | IPC: | C01G53/00, C01G51/00, C01D15/02, H01M10/0525, H01M4/505, H01M4/525, H01M4/36, C04B35/26, H01M4/485, // H01M4/02 | [2017/11] | CPC: |
H01M4/364 (EP,CN,US);
C01G53/42 (EP,CN,KR,US);
C01D15/02 (EP,CN,US);
C01G49/0027 (KR);
C01G51/42 (EP,CN,US);
C01G51/50 (EP,CN,US);
C01G53/66 (CN,US);
H01M10/0525 (EP,CN,US);
H01M4/366 (KR);
H01M4/505 (EP,CN,US);
H01M4/525 (EP,CN,KR,US);
C01P2002/54 (EP,CN,US);
C01P2002/85 (EP,CN,US);
C01P2004/03 (EP,CN,US);
C01P2004/04 (EP,CN,US);
C01P2004/50 (KR);
C01P2004/62 (KR);
C01P2006/40 (KR);
H01M2004/021 (EP,CN,US);
H01M2004/028 (CN,US);
Y02E60/10 (EP,US);
Y02P70/50 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/43] |
Former [2017/11] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | POLYKRISTALLINES METALLOXID, VERFAHREN ZUR HERSTELLUNG DAVON UND ARTIKEL DAMIT | [2017/11] | English: | POLYCRYSTALLINE METAL OXIDE, METHODS OF MANUFACTURE THEREOF, AND ARTICLES COMPRISING THE SAME | [2017/11] | French: | OXYDE MÉTALLIQUE POLYCRISTALLIN, SES PROCÉDÉS DE FABRICATION ET ARTICLES LE COMPRENANT | [2017/11] | Examination procedure | 22.09.2016 | Date on which the examining division has become responsible | 15.09.2017 | Amendment by applicant (claims and/or description) | 15.09.2017 | Examination requested [2017/43] | 18.07.2018 | Despatch of a communication from the examining division (Time limit: M06) | 15.01.2019 | Reply to a communication from the examining division | 26.03.2019 | Communication of intention to grant the patent | 23.07.2019 | Fee for grant paid | 23.07.2019 | Fee for publishing/printing paid | 23.07.2019 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP12823734.4 / EP2744754 | Divisional application(s) | EP19191989.3 / EP3604230 | Opposition(s) | 05.06.2020 | No opposition filed within time limit [2020/33] | Fees paid | Renewal fee | 16.01.2017 | Renewal fee patent year 03 | 16.01.2017 | Renewal fee patent year 04 | 16.01.2017 | Renewal fee patent year 05 | 11.09.2017 | Renewal fee patent year 06 | 24.07.2018 | Renewal fee patent year 07 | 23.07.2019 | Renewal fee patent year 08 | Penalty fee | Additional fee for renewal fee | 31.07.2017 | 06   M06   Fee paid on   11.09.2017 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.07.2012 | AL | 04.09.2019 | AT | 04.09.2019 | CY | 04.09.2019 | CZ | 04.09.2019 | DK | 04.09.2019 | EE | 04.09.2019 | ES | 04.09.2019 | FI | 04.09.2019 | HR | 04.09.2019 | LT | 04.09.2019 | LV | 04.09.2019 | MC | 04.09.2019 | MK | 04.09.2019 | MT | 04.09.2019 | NL | 04.09.2019 | RO | 04.09.2019 | RS | 04.09.2019 | SE | 04.09.2019 | SI | 04.09.2019 | SK | 04.09.2019 | SM | 04.09.2019 | BG | 04.12.2019 | NO | 04.12.2019 | GR | 05.12.2019 | IS | 05.01.2020 | PT | 06.01.2020 | [2022/32] |
Former [2022/28] | HU | 27.07.2012 | |
AL | 04.09.2019 | ||
AT | 04.09.2019 | ||
CY | 04.09.2019 | ||
CZ | 04.09.2019 | ||
DK | 04.09.2019 | ||
EE | 04.09.2019 | ||
ES | 04.09.2019 | ||
FI | 04.09.2019 | ||
HR | 04.09.2019 | ||
LT | 04.09.2019 | ||
LV | 04.09.2019 | ||
MC | 04.09.2019 | ||
MT | 04.09.2019 | ||
NL | 04.09.2019 | ||
RO | 04.09.2019 | ||
RS | 04.09.2019 | ||
SE | 04.09.2019 | ||
SI | 04.09.2019 | ||
SK | 04.09.2019 | ||
SM | 04.09.2019 | ||
BG | 04.12.2019 | ||
NO | 04.12.2019 | ||
GR | 05.12.2019 | ||
IS | 05.01.2020 | ||
PT | 06.01.2020 | ||
Former [2021/15] | AL | 04.09.2019 | |
AT | 04.09.2019 | ||
CZ | 04.09.2019 | ||
DK | 04.09.2019 | ||
EE | 04.09.2019 | ||
ES | 04.09.2019 | ||
FI | 04.09.2019 | ||
HR | 04.09.2019 | ||
LT | 04.09.2019 | ||
LV | 04.09.2019 | ||
MC | 04.09.2019 | ||
NL | 04.09.2019 | ||
RO | 04.09.2019 | ||
RS | 04.09.2019 | ||
SE | 04.09.2019 | ||
SI | 04.09.2019 | ||
SK | 04.09.2019 | ||
SM | 04.09.2019 | ||
BG | 04.12.2019 | ||
NO | 04.12.2019 | ||
GR | 05.12.2019 | ||
IS | 05.01.2020 | ||
PT | 06.01.2020 | ||
Former [2020/37] | AL | 04.09.2019 | |
AT | 04.09.2019 | ||
CZ | 04.09.2019 | ||
DK | 04.09.2019 | ||
EE | 04.09.2019 | ||
ES | 04.09.2019 | ||
FI | 04.09.2019 | ||
HR | 04.09.2019 | ||
LT | 04.09.2019 | ||
LV | 04.09.2019 | ||
NL | 04.09.2019 | ||
RO | 04.09.2019 | ||
RS | 04.09.2019 | ||
SE | 04.09.2019 | ||
SI | 04.09.2019 | ||
SK | 04.09.2019 | ||
SM | 04.09.2019 | ||
BG | 04.12.2019 | ||
NO | 04.12.2019 | ||
GR | 05.12.2019 | ||
IS | 05.01.2020 | ||
PT | 06.01.2020 | ||
Former [2020/36] | AL | 04.09.2019 | |
AT | 04.09.2019 | ||
CZ | 04.09.2019 | ||
DK | 04.09.2019 | ||
EE | 04.09.2019 | ||
ES | 04.09.2019 | ||
FI | 04.09.2019 | ||
HR | 04.09.2019 | ||
LT | 04.09.2019 | ||
LV | 04.09.2019 | ||
NL | 04.09.2019 | ||
RO | 04.09.2019 | ||
RS | 04.09.2019 | ||
SE | 04.09.2019 | ||
SK | 04.09.2019 | ||
SM | 04.09.2019 | ||
BG | 04.12.2019 | ||
NO | 04.12.2019 | ||
GR | 05.12.2019 | ||
IS | 05.01.2020 | ||
PT | 06.01.2020 | ||
Former [2020/27] | AL | 04.09.2019 | |
AT | 04.09.2019 | ||
CZ | 04.09.2019 | ||
EE | 04.09.2019 | ||
ES | 04.09.2019 | ||
FI | 04.09.2019 | ||
HR | 04.09.2019 | ||
LT | 04.09.2019 | ||
LV | 04.09.2019 | ||
NL | 04.09.2019 | ||
RO | 04.09.2019 | ||
RS | 04.09.2019 | ||
SE | 04.09.2019 | ||
SK | 04.09.2019 | ||
SM | 04.09.2019 | ||
BG | 04.12.2019 | ||
NO | 04.12.2019 | ||
GR | 05.12.2019 | ||
PT | 06.01.2020 | ||
IS | 24.02.2020 | ||
Former [2020/26] | AL | 04.09.2019 | |
AT | 04.09.2019 | ||
CZ | 04.09.2019 | ||
EE | 04.09.2019 | ||
ES | 04.09.2019 | ||
FI | 04.09.2019 | ||
HR | 04.09.2019 | ||
LT | 04.09.2019 | ||
LV | 04.09.2019 | ||
NL | 04.09.2019 | ||
RO | 04.09.2019 | ||
RS | 04.09.2019 | ||
SE | 04.09.2019 | ||
SK | 04.09.2019 | ||
BG | 04.12.2019 | ||
NO | 04.12.2019 | ||
GR | 05.12.2019 | ||
PT | 06.01.2020 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AL | 04.09.2019 | |
AT | 04.09.2019 | ||
EE | 04.09.2019 | ||
ES | 04.09.2019 | ||
FI | 04.09.2019 | ||
HR | 04.09.2019 | ||
LT | 04.09.2019 | ||
LV | 04.09.2019 | ||
NL | 04.09.2019 | ||
RO | 04.09.2019 | ||
RS | 04.09.2019 | ||
SE | 04.09.2019 | ||
BG | 04.12.2019 | ||
NO | 04.12.2019 | ||
GR | 05.12.2019 | ||
PT | 06.01.2020 | ||
Former [2020/22] | AL | 04.09.2019 | |
EE | 04.09.2019 | ||
ES | 04.09.2019 | ||
FI | 04.09.2019 | ||
HR | 04.09.2019 | ||
LT | 04.09.2019 | ||
LV | 04.09.2019 | ||
NL | 04.09.2019 | ||
RS | 04.09.2019 | ||
SE | 04.09.2019 | ||
BG | 04.12.2019 | ||
NO | 04.12.2019 | ||
GR | 05.12.2019 | ||
PT | 06.01.2020 | ||
Former [2020/20] | AL | 04.09.2019 | |
ES | 04.09.2019 | ||
FI | 04.09.2019 | ||
HR | 04.09.2019 | ||
LT | 04.09.2019 | ||
LV | 04.09.2019 | ||
NL | 04.09.2019 | ||
RS | 04.09.2019 | ||
SE | 04.09.2019 | ||
BG | 04.12.2019 | ||
NO | 04.12.2019 | ||
GR | 05.12.2019 | ||
Former [2020/15] | AL | 04.09.2019 | |
ES | 04.09.2019 | ||
FI | 04.09.2019 | ||
HR | 04.09.2019 | ||
LT | 04.09.2019 | ||
LV | 04.09.2019 | ||
RS | 04.09.2019 | ||
SE | 04.09.2019 | ||
BG | 04.12.2019 | ||
NO | 04.12.2019 | ||
GR | 05.12.2019 | ||
Former [2020/12] | ES | 04.09.2019 | |
FI | 04.09.2019 | ||
HR | 04.09.2019 | ||
LT | 04.09.2019 | ||
LV | 04.09.2019 | ||
RS | 04.09.2019 | ||
SE | 04.09.2019 | ||
BG | 04.12.2019 | ||
NO | 04.12.2019 | ||
GR | 05.12.2019 | ||
Former [2020/10] | FI | 04.09.2019 | |
LT | 04.09.2019 | ||
SE | 04.09.2019 | ||
BG | 04.12.2019 | ||
NO | 04.12.2019 | ||
Former [2020/09] | FI | 04.09.2019 | |
LT | 04.09.2019 | ||
NO | 04.12.2019 | ||
Former [2020/08] | LT | 04.09.2019 | |
NO | 04.12.2019 | Documents cited: | Search | [A]US6071649 (MAO ZHENHUA [US], et al) [A] 1-11 * column 2, line 15 - column 3, line 40 *; | [X]US2002192552 (LAMPE-ONNERUD CHRISTINA [US], et al) [X] 1-11 * paragraphs [0037] - [0038] * * paragraphs [0051] - [0052] * * paragraph [0134] *; | [A]US2005260495 (ONNERUD PER T [US], et al) [A] 1-11 * paragraph [0010] - paragraph [0017] *; | [A]JP2008234872 (SONY CORP) [A] 1-11* abstract *; | [XA]US2009121179 (SHI JAY JIE [CN]) [X] 1-7,10,11 * page 1, paragraph 0001 * * page 1, paragraph 0008 - page 2, paragraph 0021 * * page 3; example 1 * [A] 8,9 |