EP3179775 - METHOD AND SYSTEM OF SETTING TRANSMITTER POWER LEVELS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.12.2019 Database last updated on 26.04.2025 | |
Former | The patent has been granted Status updated on 30.12.2018 | ||
Former | Grant of patent is intended Status updated on 20.08.2018 | ||
Former | Request for examination was made Status updated on 28.12.2017 | ||
Former | The application has been published Status updated on 12.05.2017 | Most recent event Tooltip | 16.07.2021 | Lapse of the patent in a contracting state New state(s): HU | published on 18.08.2021 [2021/33] | Applicant(s) | For all designated states CommScope Technologies LLC 1100 CommScope Place SE Hickory, NC 28602 / US | [N/P] |
Former [2019/05] | For all designated states Commscope Technologies LLC 1100 CommScope Place SE Hickory, NC 28602 / US | ||
Former [2017/24] | For all designated states Commscope Technologies LLC 1100 CommScope Place SE Hickory, NC 28602 / US | Inventor(s) | 01 /
Richardson, Andrew 3 Way Networks Limited Trinity House, Cambridge Business Park Cowley Road Cambridge CB4 0WZ/GB / GB | [2017/24] | Representative(s) | Parker, Andrew James Meissner Bolte Patentanwälte Rechtsanwälte Partnerschaft mbB Widenmayerstraße 47 80538 München / DE | [2019/05] |
Former [2017/24] | Ponder, William Anthony John, et al Reddie & Grose LLP 16 Theobalds Road London WC1X 8PL / GB | Application number, filing date | 16192286.9 | 01.08.2005 | [2017/24] | Priority number, date | GB20040017051 | 30.07.2004 Original published format: GB 0417051 | GB20040017025 | 30.07.2004 Original published format: GB 0417025 | GB20040017052 | 30.07.2004 Original published format: GB 0417052 | GB20050009243 | 05.05.2005 Original published format: GB 0509243 | [2017/24] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3179775 | Date: | 14.06.2017 | Language: | EN | [2017/24] | Type: | B1 Patent specification | No.: | EP3179775 | Date: | 30.01.2019 | Language: | EN | [2019/05] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 22.02.2017 | Classification | IPC: | H04W36/12, H04W4/02, H04W52/24, H04W52/28, H04W52/34, H04W52/36, H04W84/10, H04B17/327 | [2017/24] | CPC: |
H04W52/34 (EP,US);
H04B17/327 (EP,US);
H04W36/12 (EP,US);
H04W52/283 (EP,US);
H04B17/26 (EP,US);
H04W4/023 (EP,US);
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2018/04] |
Former [2017/24] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR | Title | German: | VERFAHREN UND SYSTEM ZUR EINSTELLUNG DER SENDERLEISTUNGSPEGEL | [2017/24] | English: | METHOD AND SYSTEM OF SETTING TRANSMITTER POWER LEVELS | [2017/24] | French: | PROCÉDÉ ET SYSTÈME DE RÉGLAGE DES NIVEAUX DE PUISSANCE D'ÉMETTEUR | [2017/24] | Examination procedure | 04.10.2016 | Date on which the examining division has become responsible | 14.12.2017 | Amendment by applicant (claims and/or description) | 14.12.2017 | Examination requested [2018/04] | 21.08.2018 | Communication of intention to grant the patent | 11.12.2018 | Fee for grant paid | 11.12.2018 | Fee for publishing/printing paid | 11.12.2018 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP05767920.1 / EP1782551 | Opposition(s) | 31.10.2019 | No opposition filed within time limit [2020/02] | Fees paid | Renewal fee | 02.11.2016 | Renewal fee patent year 03 | 02.11.2016 | Renewal fee patent year 04 | 02.11.2016 | Renewal fee patent year 05 | 02.11.2016 | Renewal fee patent year 06 | 02.11.2016 | Renewal fee patent year 07 | 02.11.2016 | Renewal fee patent year 08 | 02.11.2016 | Renewal fee patent year 09 | 02.11.2016 | Renewal fee patent year 10 | 02.11.2016 | Renewal fee patent year 11 | 02.11.2016 | Renewal fee patent year 12 | 28.08.2017 | Renewal fee patent year 13 | 27.08.2018 | Renewal fee patent year 14 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 01.08.2005 | AT | 30.01.2019 | CY | 30.01.2019 | CZ | 30.01.2019 | DK | 30.01.2019 | EE | 30.01.2019 | ES | 30.01.2019 | FI | 30.01.2019 | IT | 30.01.2019 | LT | 30.01.2019 | LV | 30.01.2019 | MC | 30.01.2019 | NL | 30.01.2019 | PL | 30.01.2019 | RO | 30.01.2019 | SE | 30.01.2019 | SI | 30.01.2019 | SK | 30.01.2019 | TR | 30.01.2019 | BG | 30.04.2019 | GR | 01.05.2019 | IS | 30.05.2019 | PT | 30.05.2019 | IE | 01.08.2019 | LU | 01.08.2019 | BE | 31.08.2019 | CH | 31.08.2019 | FR | 31.08.2019 | LI | 31.08.2019 | [2021/33] |
Former [2021/26] | AT | 30.01.2019 | |
CY | 30.01.2019 | ||
CZ | 30.01.2019 | ||
DK | 30.01.2019 | ||
EE | 30.01.2019 | ||
ES | 30.01.2019 | ||
FI | 30.01.2019 | ||
IT | 30.01.2019 | ||
LT | 30.01.2019 | ||
LV | 30.01.2019 | ||
MC | 30.01.2019 | ||
NL | 30.01.2019 | ||
PL | 30.01.2019 | ||
RO | 30.01.2019 | ||
SE | 30.01.2019 | ||
SI | 30.01.2019 | ||
SK | 30.01.2019 | ||
TR | 30.01.2019 | ||
BG | 30.04.2019 | ||
GR | 01.05.2019 | ||
IS | 30.05.2019 | ||
PT | 30.05.2019 | ||
IE | 01.08.2019 | ||
LU | 01.08.2019 | ||
BE | 31.08.2019 | ||
CH | 31.08.2019 | ||
FR | 31.08.2019 | ||
LI | 31.08.2019 | ||
Former [2020/38] | AT | 30.01.2019 | |
CZ | 30.01.2019 | ||
DK | 30.01.2019 | ||
EE | 30.01.2019 | ||
ES | 30.01.2019 | ||
FI | 30.01.2019 | ||
IT | 30.01.2019 | ||
LT | 30.01.2019 | ||
LV | 30.01.2019 | ||
MC | 30.01.2019 | ||
NL | 30.01.2019 | ||
PL | 30.01.2019 | ||
RO | 30.01.2019 | ||
SE | 30.01.2019 | ||
SI | 30.01.2019 | ||
SK | 30.01.2019 | ||
TR | 30.01.2019 | ||
BG | 30.04.2019 | ||
GR | 01.05.2019 | ||
IS | 30.05.2019 | ||
PT | 30.05.2019 | ||
IE | 01.08.2019 | ||
LU | 01.08.2019 | ||
BE | 31.08.2019 | ||
CH | 31.08.2019 | ||
FR | 31.08.2019 | ||
LI | 31.08.2019 | ||
Former [2020/36] | AT | 30.01.2019 | |
CZ | 30.01.2019 | ||
DK | 30.01.2019 | ||
EE | 30.01.2019 | ||
ES | 30.01.2019 | ||
FI | 30.01.2019 | ||
IT | 30.01.2019 | ||
LT | 30.01.2019 | ||
LV | 30.01.2019 | ||
MC | 30.01.2019 | ||
NL | 30.01.2019 | ||
PL | 30.01.2019 | ||
RO | 30.01.2019 | ||
SE | 30.01.2019 | ||
SI | 30.01.2019 | ||
SK | 30.01.2019 | ||
TR | 30.01.2019 | ||
BG | 30.04.2019 | ||
GR | 01.05.2019 | ||
IS | 30.05.2019 | ||
PT | 30.05.2019 | ||
IE | 01.08.2019 | ||
LU | 01.08.2019 | ||
CH | 31.08.2019 | ||
FR | 31.08.2019 | ||
LI | 31.08.2019 | ||
Former [2020/25] | AT | 30.01.2019 | |
CZ | 30.01.2019 | ||
DK | 30.01.2019 | ||
EE | 30.01.2019 | ||
ES | 30.01.2019 | ||
FI | 30.01.2019 | ||
IT | 30.01.2019 | ||
LT | 30.01.2019 | ||
LV | 30.01.2019 | ||
MC | 30.01.2019 | ||
NL | 30.01.2019 | ||
PL | 30.01.2019 | ||
RO | 30.01.2019 | ||
SE | 30.01.2019 | ||
SI | 30.01.2019 | ||
SK | 30.01.2019 | ||
TR | 30.01.2019 | ||
BG | 30.04.2019 | ||
GR | 01.05.2019 | ||
IS | 30.05.2019 | ||
PT | 30.05.2019 | ||
LU | 01.08.2019 | ||
CH | 31.08.2019 | ||
LI | 31.08.2019 | ||
Former [2020/17] | AT | 30.01.2019 | |
CZ | 30.01.2019 | ||
DK | 30.01.2019 | ||
EE | 30.01.2019 | ||
ES | 30.01.2019 | ||
FI | 30.01.2019 | ||
IT | 30.01.2019 | ||
LT | 30.01.2019 | ||
LV | 30.01.2019 | ||
NL | 30.01.2019 | ||
PL | 30.01.2019 | ||
RO | 30.01.2019 | ||
SE | 30.01.2019 | ||
SI | 30.01.2019 | ||
SK | 30.01.2019 | ||
TR | 30.01.2019 | ||
BG | 30.04.2019 | ||
GR | 01.05.2019 | ||
IS | 30.05.2019 | ||
PT | 30.05.2019 | ||
Former [2020/13] | AT | 30.01.2019 | |
CZ | 30.01.2019 | ||
DK | 30.01.2019 | ||
EE | 30.01.2019 | ||
ES | 30.01.2019 | ||
FI | 30.01.2019 | ||
IT | 30.01.2019 | ||
LT | 30.01.2019 | ||
LV | 30.01.2019 | ||
NL | 30.01.2019 | ||
PL | 30.01.2019 | ||
RO | 30.01.2019 | ||
SE | 30.01.2019 | ||
SI | 30.01.2019 | ||
SK | 30.01.2019 | ||
BG | 30.04.2019 | ||
GR | 01.05.2019 | ||
IS | 30.05.2019 | ||
PT | 30.05.2019 | ||
Former [2020/03] | AT | 30.01.2019 | |
CZ | 30.01.2019 | ||
DK | 30.01.2019 | ||
EE | 30.01.2019 | ||
ES | 30.01.2019 | ||
FI | 30.01.2019 | ||
IT | 30.01.2019 | ||
LT | 30.01.2019 | ||
LV | 30.01.2019 | ||
NL | 30.01.2019 | ||
PL | 30.01.2019 | ||
RO | 30.01.2019 | ||
SE | 30.01.2019 | ||
SK | 30.01.2019 | ||
BG | 30.04.2019 | ||
GR | 01.05.2019 | ||
IS | 30.05.2019 | ||
PT | 30.05.2019 | ||
Former [2019/49] | CZ | 30.01.2019 | |
DK | 30.01.2019 | ||
EE | 30.01.2019 | ||
ES | 30.01.2019 | ||
FI | 30.01.2019 | ||
IT | 30.01.2019 | ||
LT | 30.01.2019 | ||
LV | 30.01.2019 | ||
NL | 30.01.2019 | ||
PL | 30.01.2019 | ||
RO | 30.01.2019 | ||
SE | 30.01.2019 | ||
SK | 30.01.2019 | ||
BG | 30.04.2019 | ||
GR | 01.05.2019 | ||
IS | 30.05.2019 | ||
PT | 30.05.2019 | ||
Former [2019/48] | DK | 30.01.2019 | |
ES | 30.01.2019 | ||
FI | 30.01.2019 | ||
IT | 30.01.2019 | ||
LT | 30.01.2019 | ||
LV | 30.01.2019 | ||
NL | 30.01.2019 | ||
PL | 30.01.2019 | ||
SE | 30.01.2019 | ||
BG | 30.04.2019 | ||
GR | 01.05.2019 | ||
IS | 30.05.2019 | ||
PT | 30.05.2019 | ||
Former [2019/46] | ES | 30.01.2019 | |
FI | 30.01.2019 | ||
IT | 30.01.2019 | ||
LT | 30.01.2019 | ||
LV | 30.01.2019 | ||
NL | 30.01.2019 | ||
PL | 30.01.2019 | ||
SE | 30.01.2019 | ||
BG | 30.04.2019 | ||
GR | 01.05.2019 | ||
IS | 30.05.2019 | ||
PT | 30.05.2019 | ||
Former [2019/39] | ES | 30.01.2019 | |
FI | 30.01.2019 | ||
LT | 30.01.2019 | ||
LV | 30.01.2019 | ||
NL | 30.01.2019 | ||
PL | 30.01.2019 | ||
SE | 30.01.2019 | ||
BG | 30.04.2019 | ||
GR | 01.05.2019 | ||
IS | 30.05.2019 | ||
PT | 30.05.2019 | ||
Former [2019/38] | ES | 30.01.2019 | |
FI | 30.01.2019 | ||
LT | 30.01.2019 | ||
NL | 30.01.2019 | ||
PL | 30.01.2019 | ||
SE | 30.01.2019 | ||
BG | 30.04.2019 | ||
GR | 01.05.2019 | ||
PT | 30.05.2019 | ||
Former [2019/37] | ES | 30.01.2019 | |
FI | 30.01.2019 | ||
LT | 30.01.2019 | ||
NL | 30.01.2019 | ||
PL | 30.01.2019 | ||
SE | 30.01.2019 | ||
GR | 01.05.2019 | ||
PT | 30.05.2019 | ||
Former [2019/35] | ES | 30.01.2019 | |
FI | 30.01.2019 | ||
LT | 30.01.2019 | ||
NL | 30.01.2019 | ||
PL | 30.01.2019 | ||
SE | 30.01.2019 | ||
PT | 30.05.2019 | ||
Former [2019/34] | FI | 30.01.2019 | |
LT | 30.01.2019 | ||
NL | 30.01.2019 | ||
SE | 30.01.2019 | ||
PT | 30.05.2019 | ||
Former [2019/33] | FI | 30.01.2019 | |
LT | 30.01.2019 | ||
PT | 30.05.2019 | Documents cited: | Search | [A]WO9809465 (ERICSSON TELEFON AB L M [SE]) [A] 1-15 * abstract ** page 3, line 23 - page 4, line 2 *; | [X]US2003161285 (TIEDEMANN EDWARD G [US], et al) [X] 1,9 * paragraphs [0006] , [0019] - [0026] *; | [XP]US2004192371 (ZHAO WEN [CA], et al) [XP] 1,9 * abstract * * paragraphs [0007] - [0010] * |