EP3156571 - LOCK WITH ACTUATION SYSTEM OF THE LATCH BOLT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 16.07.2021 Database last updated on 21.01.2025 | |
Former | The patent has been granted Status updated on 07.08.2020 | ||
Former | Grant of patent is intended Status updated on 01.06.2020 | ||
Former | Request for examination was made Status updated on 08.09.2017 | ||
Former | The application has been published Status updated on 20.03.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states OMEC Serrature S.P.A. Via Caselli, 22/24 25065 Lumezzane (Brescia) / IT | [2020/37] |
Former [2017/16] | For all designated states OMEC Serrature S.P.A. Via Caselli 22/24 25066 Lumezzane (Brescia) / IT | Inventor(s) | 01 /
CAMPLANI, Alessandro OMEC SERRATURE S.p.A. Via Caselli, 22/24 25065 LUMEZZANE / IT | [2017/16] | Representative(s) | Tirloni, Bartolomeo BTA Srl 2nd floor Viale Papa Giovanni XXIII, 106 24121 Bergamo / IT | [2017/16] | Application number, filing date | 16192806.4 | 07.10.2016 | [2017/16] | Priority number, date | IT2015UB04686 | 15.10.2015 Original published format: IT UB20154686 | [2017/16] | Filing language | IT | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3156571 | Date: | 19.04.2017 | Language: | EN | [2017/16] | Type: | B1 Patent specification | No.: | EP3156571 | Date: | 09.09.2020 | Language: | EN | [2020/37] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 27.02.2017 | Classification | IPC: | E05C9/02, E05C9/04, E05B15/00, // E05B47/00 | [2020/24] | CPC: |
E05C9/023 (EP,RU);
E05B15/0013 (EP);
E05B47/0012 (EP,RU);
E05C9/041 (EP,RU)
|
Former IPC [2017/16] | E05C9/02, E05C9/04, // E05B47/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/41] |
Former [2017/16] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Validation states | MA | 30.08.2017 | Title | German: | SCHLOSS MIT BETÄTIGUNGSSYSTEM FÜR SCHLOSSFALLE | [2017/16] | English: | LOCK WITH ACTUATION SYSTEM OF THE LATCH BOLT | [2017/16] | French: | SERRURE AVEC SYSTÈME D'ACTIONNEMENT D'UN PÊNE DEMI-TOUR | [2017/16] | Examination procedure | 07.10.2016 | Date on which the examining division has become responsible | 30.08.2017 | Amendment by applicant (claims and/or description) | 30.08.2017 | Examination requested [2017/41] | 02.06.2020 | Communication of intention to grant the patent | 23.07.2020 | Fee for grant paid | 23.07.2020 | Fee for publishing/printing paid | 23.07.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 10.06.2021 | No opposition filed within time limit [2021/33] | Fees paid | Renewal fee | 31.07.2018 | Renewal fee patent year 03 | 02.10.2019 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.10.2016 | AL | 09.09.2020 | AT | 09.09.2020 | CY | 09.09.2020 | CZ | 09.09.2020 | DK | 09.09.2020 | EE | 09.09.2020 | ES | 09.09.2020 | FI | 09.09.2020 | LT | 09.09.2020 | LV | 09.09.2020 | MC | 09.09.2020 | MK | 09.09.2020 | MT | 09.09.2020 | NL | 09.09.2020 | PL | 09.09.2020 | RO | 09.09.2020 | RS | 09.09.2020 | SE | 09.09.2020 | SK | 09.09.2020 | SM | 09.09.2020 | TR | 09.09.2020 | IE | 07.10.2020 | LU | 07.10.2020 | CH | 31.10.2020 | LI | 31.10.2020 | BG | 09.12.2020 | NO | 09.12.2020 | GR | 10.12.2020 | IS | 09.01.2021 | PT | 11.01.2021 | [2022/32] |
Former [2022/27] | HU | 07.10.2016 | |
AL | 09.09.2020 | ||
AT | 09.09.2020 | ||
CY | 09.09.2020 | ||
CZ | 09.09.2020 | ||
DK | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
MC | 09.09.2020 | ||
MT | 09.09.2020 | ||
NL | 09.09.2020 | ||
PL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SK | 09.09.2020 | ||
SM | 09.09.2020 | ||
TR | 09.09.2020 | ||
IE | 07.10.2020 | ||
LU | 07.10.2020 | ||
CH | 31.10.2020 | ||
LI | 31.10.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
Former [2021/46] | AL | 09.09.2020 | |
AT | 09.09.2020 | ||
CZ | 09.09.2020 | ||
DK | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
MC | 09.09.2020 | ||
NL | 09.09.2020 | ||
PL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SK | 09.09.2020 | ||
SM | 09.09.2020 | ||
IE | 07.10.2020 | ||
LU | 07.10.2020 | ||
CH | 31.10.2020 | ||
LI | 31.10.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
Former [2021/37] | AL | 09.09.2020 | |
AT | 09.09.2020 | ||
CZ | 09.09.2020 | ||
DK | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
MC | 09.09.2020 | ||
NL | 09.09.2020 | ||
PL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SK | 09.09.2020 | ||
SM | 09.09.2020 | ||
LU | 07.10.2020 | ||
CH | 31.10.2020 | ||
LI | 31.10.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
Former [2021/31] | AL | 09.09.2020 | |
AT | 09.09.2020 | ||
CZ | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
MC | 09.09.2020 | ||
NL | 09.09.2020 | ||
PL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SK | 09.09.2020 | ||
SM | 09.09.2020 | ||
LU | 07.10.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
Former [2021/28] | AL | 09.09.2020 | |
AT | 09.09.2020 | ||
CZ | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
NL | 09.09.2020 | ||
PL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SK | 09.09.2020 | ||
SM | 09.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
Former [2021/25] | AL | 09.09.2020 | |
AT | 09.09.2020 | ||
CZ | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
NL | 09.09.2020 | ||
PL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SM | 09.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
Former [2021/23] | AT | 09.09.2020 | |
CZ | 09.09.2020 | ||
EE | 09.09.2020 | ||
FI | 09.09.2020 | ||
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
NL | 09.09.2020 | ||
PL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SM | 09.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
PT | 11.01.2021 | ||
Former [2021/22] | CZ | 09.09.2020 | |
EE | 09.09.2020 | ||
FI | 09.09.2020 | ||
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
NL | 09.09.2020 | ||
PL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
PT | 11.01.2021 | ||
Former [2021/21] | FI | 09.09.2020 | |
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
NL | 09.09.2020 | ||
PL | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
PT | 11.01.2021 | ||
Former [2021/18] | FI | 09.09.2020 | |
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
NL | 09.09.2020 | ||
PL | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
Former [2021/10] | FI | 09.09.2020 | |
LT | 09.09.2020 | ||
LV | 09.09.2020 | ||
PL | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
Former [2021/09] | FI | 09.09.2020 | |
LT | 09.09.2020 | ||
SE | 09.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
Former [2021/08] | FI | 09.09.2020 | |
LT | 09.09.2020 | ||
SE | 09.09.2020 | ||
BG | 09.12.2020 | ||
NO | 09.12.2020 | ||
Former [2021/07] | FI | 09.09.2020 | |
LT | 09.09.2020 | ||
NO | 09.12.2020 | Documents cited: | Search | [XAI]FR2436239 (NOVOBAT SARL); | [A]DE3605826 (FLIETHER KARL GMBH & CO [DE]); | [A]EP0564441 (ROTO FRANK EISENWAREN [AT]); | [A]FR2821380 (VACHETTE SA [FR]); | [A]FR2836505 (STREMLER [FR]) | by applicant | WO2011051086 |