EP3316337 - BATTERY, LEAD TAB THEREFOR AND METHOD FOR PRODUCING A LEAD TAB AND A BATTERY [Right-click to bookmark this link] | |||
Former [2018/18] | BATTERIE, ABLEITERELEMENT HIERFÜR UND VERFAHREN ZUR HERSTELLUNG EINES ABLEITERELEMENTS UND EINER BATTERIE | ||
[2019/31] | Status | No opposition filed within time limit Status updated on 09.10.2020 Database last updated on 14.11.2024 | |
Former | The patent has been granted Status updated on 01.11.2019 | ||
Former | Grant of patent is intended Status updated on 31.07.2019 | ||
Former | Examination is in progress Status updated on 25.03.2019 | ||
Former | Request for examination was made Status updated on 29.06.2018 | ||
Former | The application has been published Status updated on 30.03.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states VARTA Microbattery GmbH Varta Platz 1 73479 Ellwangen Jagst / DE | [2019/52] |
Former [2018/18] | For all designated states VARTA Microbattery GmbH Daimlerstrasse 1 73479 Ellwangen / DE | Inventor(s) | 01 /
Brenner, Rolf Weimarer Straße 13 73479 Ellwangen / DE | [2018/18] | Representative(s) | Patentanwaltskanzlei Cartagena Partnerschaftsgesellschaft Klement, Eberle mbB Urbanstraße 53 70182 Stuttgart / DE | [2018/18] | Application number, filing date | 16195836.8 | 26.10.2016 | [2018/18] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3316337 | Date: | 02.05.2018 | Language: | DE | [2018/18] | Type: | B1 Patent specification | No.: | EP3316337 | Date: | 04.12.2019 | Language: | DE | [2019/49] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 02.05.2017 | Classification | IPC: | H01M2/02, H01M2/26, H01M2/30 | [2018/18] | CPC: |
H01M50/174 (EP);
H01M50/538 (EP,US);
H01M50/103 (EP,US);
H01M50/534 (EP,US);
H01M50/536 (EP,US);
H01M50/55 (EP,US);
Y02E60/10 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/31] |
Former [2018/18] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | BATTERIE, ABLEITERELEMENT HIERFÜR UND VERFAHREN ZUR HERSTELLUNG EINES ABLEITERELEMENTS UND EINER BATTERIE | [2018/18] | English: | BATTERY, LEAD TAB THEREFOR AND METHOD FOR PRODUCING A LEAD TAB AND A BATTERY | [2019/31] | French: | BATTERIE, PATTE DE CONNEXION POUR CELA, ET PROCÉDÉ DE FABRICATION D'UNE PATTE DE CONNEXION ET D'UNE BATTERIE | [2019/31] |
Former [2018/18] | BATTERIE, ABLEITERELEMENT HIERFÜR UND VERFAHREN ZUR HERSTELLUNG EINES ABLEITERELEMENTS UND EINER BATTERIE | ||
Former [2018/18] | BATTERIE, ABLEITERELEMENT HIERFÜR UND VERFAHREN ZUR HERSTELLUNG EINES ABLEITERELEMENTS UND EINER BATTERIE | Examination procedure | 26.10.2016 | Date on which the examining division has become responsible | 20.06.2018 | Amendment by applicant (claims and/or description) | 20.06.2018 | Examination requested [2018/31] | 28.03.2019 | Despatch of a communication from the examining division (Time limit: M04) | 13.05.2019 | Reply to a communication from the examining division | 01.08.2019 | Communication of intention to grant the patent | 09.10.2019 | Fee for grant paid | 09.10.2019 | Fee for publishing/printing paid | 09.10.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 07.09.2020 | No opposition filed within time limit [2020/46] | Fees paid | Renewal fee | 17.10.2018 | Renewal fee patent year 03 | 23.10.2019 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.10.2016 | AL | 04.12.2019 | CY | 04.12.2019 | CZ | 04.12.2019 | DK | 04.12.2019 | EE | 04.12.2019 | ES | 04.12.2019 | FI | 04.12.2019 | HR | 04.12.2019 | IT | 04.12.2019 | LT | 04.12.2019 | LV | 04.12.2019 | MC | 04.12.2019 | MK | 04.12.2019 | MT | 04.12.2019 | NL | 04.12.2019 | PL | 04.12.2019 | RO | 04.12.2019 | RS | 04.12.2019 | SE | 04.12.2019 | SI | 04.12.2019 | SK | 04.12.2019 | SM | 04.12.2019 | TR | 04.12.2019 | BG | 04.03.2020 | NO | 04.03.2020 | GR | 05.03.2020 | IS | 04.04.2020 | PT | 29.04.2020 | [2022/32] |
Former [2022/27] | HU | 26.10.2016 | |
AL | 04.12.2019 | ||
CY | 04.12.2019 | ||
CZ | 04.12.2019 | ||
DK | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
IT | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
MC | 04.12.2019 | ||
MT | 04.12.2019 | ||
NL | 04.12.2019 | ||
PL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SI | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
TR | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2021/31] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
DK | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
IT | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
MC | 04.12.2019 | ||
NL | 04.12.2019 | ||
PL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SI | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2021/10] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
DK | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
IT | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
NL | 04.12.2019 | ||
PL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SI | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2020/51] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
DK | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
NL | 04.12.2019 | ||
PL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SI | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2020/47] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
DK | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2020/40] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2020/37] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
PT | 29.04.2020 | ||
Former [2020/36] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
PT | 29.04.2020 | ||
Former [2020/35] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
Former [2020/34] | AL | 04.12.2019 | |
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
NL | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
Former [2020/32] | AL | 04.12.2019 | |
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
NL | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
Former [2020/26] | FI | 04.12.2019 | |
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
Former [2020/23] | FI | 04.12.2019 | |
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
SE | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
Former [2020/22] | FI | 04.12.2019 | |
LT | 04.12.2019 | ||
SE | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
Former [2020/21] | NO | 04.03.2020 | Documents cited: | Search | [XA]US2006051664 (TASAI HIROSHI [JP], et al) [X] 1,4-14 * paragraphs [0007] - [0016] - [0034] - [0074]; figures 1-8 * [A] 2,3; | [XI]US2011223454 (URANO KAZUAKI [JP], et al) [X] 1,2,4,7-10 * paragraphs [0026] - [0070]; figures 3-6 *[I] 11-14; | [XAI]DE112011101990T (GS YUASA INT LTD [JP]) [X] 1,4,6-10 * paragraphs [0055] - [0070]; figures 2-4 * [A] 2,3 [I] 11-14 | Examination | CN201004475Y | US2013252053 |