EP3315145 - MULTI-LAYER WOUND CARE PRODUCT WITH PERFORATED COLLAGEN LAYER [Right-click to bookmark this link] | Status | The patent has been granted Status updated on 06.05.2022 Database last updated on 19.10.2024 | |
Former | Grant of patent is intended Status updated on 09.12.2021 | ||
Former | Examination is in progress Status updated on 19.07.2019 | ||
Former | Request for examination was made Status updated on 09.11.2018 | ||
Former | The application has been published Status updated on 30.03.2018 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states BSN medical GmbH Schützenstraße 1-3 22761 Hamburg / DE | [2022/23] |
Former [2021/01] | For all designated states BSN medical GmbH Schützenstraße 1-3 22761 Hamburg / DE | ||
Former [2018/18] | For all designated states BSN medical GmbH Quickbornstrasse 24 20253 Hamburg / DE | Inventor(s) | 01 /
HEMMRICH, Karsten Niederlöricker Str. 52 40667 Meerbusch / DE | 02 /
BLUMENTHAL, Nils Harkorstrasse 50 22765 Hamburg / DE | [2018/18] | Representative(s) | Cohausz & Florack Patent- & Rechtsanwälte Partnerschaftsgesellschaft mbB Bleichstraße 14 40211 Düsseldorf / DE | [2022/23] |
Former [2018/18] | Jostarndt Patentanwalts-AG Philipsstrasse 8 52068 Aachen / DE | Application number, filing date | 16196320.2 | 28.10.2016 | [2018/18] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3315145 | Date: | 02.05.2018 | Language: | EN | [2018/18] | Type: | B1 Patent specification | No.: | EP3315145 | Date: | 08.06.2022 | Language: | EN | [2022/23] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 06.04.2017 | Classification | IPC: | A61L15/32, A61L15/42, A61L15/46, A61L15/60 | [2018/18] | CPC: |
A61L15/32 (EP);
A61L15/325 (EP);
A61L15/425 (EP);
A61L15/46 (EP);
A61L15/60 (EP);
A61L2300/404 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/50] |
Former [2018/18] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | MEHRSCHICHTIGES WUNDPFLEGEPRODUKT MIT PERFORIERTER KOLLAGENSCHICHT | [2018/18] | English: | MULTI-LAYER WOUND CARE PRODUCT WITH PERFORATED COLLAGEN LAYER | [2018/18] | French: | PRODUIT DE PARAGE MULTICOUCHE AVEC COUCHE DE COLLAGÈNE PERFORÉE | [2018/18] | Examination procedure | 29.10.2018 | Amendment by applicant (claims and/or description) | 02.11.2018 | Examination requested [2018/50] | 02.11.2018 | Date on which the examining division has become responsible | 23.07.2019 | Despatch of a communication from the examining division (Time limit: M06) | 28.01.2020 | Reply to a communication from the examining division | 08.04.2020 | Despatch of a communication from the examining division (Time limit: M06) | 11.01.2021 | Reply to a communication from the examining division | 10.12.2021 | Communication of intention to grant the patent | 07.04.2022 | Receipt of the translation of the claim(s) | 02.05.2022 | Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time | 02.05.2022 | Fee for grant paid | 02.05.2022 | Fee for publishing/printing paid | Opposition(s) | Opponent(s) | 01
08.03.2023
09.03.2023
ADMISSIBLE ConvaTec Limited GDC, First Avenue Deeside Industrial Park Deeside Flintshire CH5 2NU / GB Opponent's representative D Young & Co LLP 3 Noble Street London EC2V 7BQ / GB | [N/P] |
Former [2023/15] | |||
Opponent(s) | 01
08.03.2023
09.03.2023
ADMISSIBLE ConvaTec Limited GDC, First Avenue Deeside Industrial Park Deeside Flintshire CH5 2NU / GB Opponent's representative D Young & Co LLP 120 Holborn London EC1N 2DY / GB | 23.03.2023 | Invitation to proprietor to file observations on the notice of opposition | 26.07.2023 | Reply of patent proprietor to notice(s) of opposition | 12.09.2024 | Date of oral proceedings | Request for further processing for: | The application is deemed to be withdrawn due to failure to fulfill actions required for granting the patent | 02.05.2022 | Request for further processing filed | 02.05.2022 | Full payment received (date of receipt of payment) Request granted | 12.05.2022 | Decision despatched | The application is deemed to be withdrawn due to failure to reply to the examination report | 11.01.2021 | Request for further processing filed | 11.01.2021 | Full payment received (date of receipt of payment) Request granted | 18.01.2021 | Decision despatched | Fees paid | Renewal fee | 31.10.2018 | Renewal fee patent year 03 | 15.10.2019 | Renewal fee patent year 04 | 14.10.2020 | Renewal fee patent year 05 | 19.10.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Stay/Interruption | 25.02.2022 | Interruption of proceedings. Reason: legal prevention of representative | [2022/18] | deleted | Interruption of proceedings. Reason: {0} | [2022/25] | Lapses during opposition Tooltip | HU | 28.10.2016 | AL | 08.06.2022 | AT | 08.06.2022 | CY | 08.06.2022 | CZ | 08.06.2022 | DK | 08.06.2022 | EE | 08.06.2022 | ES | 08.06.2022 | FI | 08.06.2022 | HR | 08.06.2022 | IT | 08.06.2022 | LT | 08.06.2022 | LV | 08.06.2022 | MC | 08.06.2022 | MK | 08.06.2022 | MT | 08.06.2022 | PL | 08.06.2022 | RO | 08.06.2022 | RS | 08.06.2022 | SI | 08.06.2022 | SK | 08.06.2022 | SM | 08.06.2022 | BG | 08.09.2022 | NO | 08.09.2022 | GR | 09.09.2022 | IS | 08.10.2022 | PT | 10.10.2022 | IE | 28.10.2022 | LU | 28.10.2022 | BE | 31.10.2022 | CH | 31.10.2022 | LI | 31.10.2022 | [2024/42] |
Former [2024/27] | HU | 28.10.2016 | |
AL | 08.06.2022 | ||
AT | 08.06.2022 | ||
CY | 08.06.2022 | ||
CZ | 08.06.2022 | ||
DK | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
IT | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
MC | 08.06.2022 | ||
MK | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SI | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
IE | 28.10.2022 | ||
LU | 28.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
Former [2024/21] | HU | 28.10.2016 | |
AL | 08.06.2022 | ||
AT | 08.06.2022 | ||
CY | 08.06.2022 | ||
CZ | 08.06.2022 | ||
DK | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
IT | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
MC | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SI | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
IE | 28.10.2022 | ||
LU | 28.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
Former [2024/18] | HU | 28.10.2016 | |
AL | 08.06.2022 | ||
AT | 08.06.2022 | ||
CZ | 08.06.2022 | ||
DK | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
IT | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
MC | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SI | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
IE | 28.10.2022 | ||
LU | 28.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
Former [2024/11] | AL | 08.06.2022 | |
AT | 08.06.2022 | ||
CZ | 08.06.2022 | ||
DK | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
IT | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
MC | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SI | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
IE | 28.10.2022 | ||
LU | 28.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
Former [2023/48] | AL | 08.06.2022 | |
AT | 08.06.2022 | ||
CZ | 08.06.2022 | ||
DK | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
MC | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SI | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
IE | 28.10.2022 | ||
LU | 28.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
Former [2023/42] | AL | 08.06.2022 | |
AT | 08.06.2022 | ||
CZ | 08.06.2022 | ||
DK | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
MC | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SI | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
LU | 28.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
Former [2023/35] | AL | 08.06.2022 | |
AT | 08.06.2022 | ||
CZ | 08.06.2022 | ||
DK | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
MC | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SI | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
LU | 28.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
Former [2023/30] | AL | 08.06.2022 | |
AT | 08.06.2022 | ||
CZ | 08.06.2022 | ||
DK | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
MC | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SI | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
LU | 28.10.2022 | ||
Former [2023/25] | AL | 08.06.2022 | |
AT | 08.06.2022 | ||
CZ | 08.06.2022 | ||
DK | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
MC | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SI | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
Former [2023/21] | AL | 08.06.2022 | |
AT | 08.06.2022 | ||
CZ | 08.06.2022 | ||
DK | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
Former [2023/17] | AL | 08.06.2022 | |
AT | 08.06.2022 | ||
CZ | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
Former [2023/12] | AT | 08.06.2022 | |
CZ | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
Former [2023/11] | AT | 08.06.2022 | |
CZ | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
PT | 10.10.2022 | ||
Former [2023/09] | AT | 08.06.2022 | |
CZ | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
PT | 10.10.2022 | ||
Former [2023/07] | AT | 08.06.2022 | |
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
RS | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
Former [2022/50] | ES | 08.06.2022 | |
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
RS | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
Former [2022/49] | ES | 08.06.2022 | |
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
Former [2022/47] | ES | 08.06.2022 | |
FI | 08.06.2022 | ||
LT | 08.06.2022 | ||
NO | 08.09.2022 | Documents cited: | Search | [A]WO2006062470 (ABIGO AB [SE]); | [X]US2014276493 (LEUNG BRADEN KING-FUNG [US], et al); | [XI]US2015080815 (CHAKRAVARTHY DEBASHISH [US], et al) | by applicant | US5202247 | US5593859 | US5962648 | WO0152780 | US6407208 | WO03094813 | WO2004078120 | US6953839 | WO2007051599 | WO2010091251 | WO2014040591 | Opposition | US4529623 | US4617326 | US4759354 | US4841962 | EP0599589 | WO9706837 | WO9800180 | EP1153622 | US2002111576 | EP1374812 | US2004127420 | US2005159695 | WO2005123170 | US2007027414 | WO2010017437 | WO2010052485 | US2010160853 | US2013296760 | US2014163447 | WO2014140608 | US2015080815 | WO2015096543 | WO2015130471 |