blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3179352

EP3179352 - GUIDED PROGRESSIVE SEARCH SYSTEM AND METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  04.06.2021
Database last updated on 21.05.2024
FormerThe patent has been granted
Status updated on  26.06.2020
FormerGrant of patent is intended
Status updated on  06.04.2020
FormerRequest for examination was made
Status updated on  15.12.2017
FormerThe application has been published
Status updated on  12.05.2017
Most recent event   Tooltip22.07.2022Lapse of the patent in a contracting state
New state(s): BE
published on 24.08.2022  [2022/34]
Applicant(s)For all designated states
Siemens Industry Software Inc.
5800 Granite Parkway, Suite 600
Plano, TX 75024-6612 / US
[2020/02]
Former [2017/24]For all designated states
Siemens Product Lifecycle Management Software Inc.
5800 Granite Parkway, Suite 600
Plano, TX 75024-6612 / US
Inventor(s)01 / CHIPLONKAR, Lalit
9852 Montclaire Drive
Mason, OH 45150 / US
02 / DEHMLOW, James
1720 140th Court SE
Bellevue, WA 98007 / US
03 / PATIL, Sandip
8785 Harper Point Drive
Cincinnati, OH 45249 / US
 [2017/24]
Representative(s)Isarpatent
Patent- und Rechtsanwälte Barth
Charles Hassa Peckmann & Partner mbB
Friedrichstrasse 31
80801 München / DE
[N/P]
Former [2017/24]Isarpatent
Patent- und Rechtsanwälte Behnisch Barth Charles
Hassa Peckmann & Partner mbB
Friedrichstrasse 31
80801 München / DE
Application number, filing date16199557.618.11.2016
[2017/24]
Priority number, dateUS20151496427809.12.2015         Original published format: US201514964278
[2017/24]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3179352
Date:14.06.2017
Language:EN
[2017/24]
Type: B1 Patent specification 
No.:EP3179352
Date:29.07.2020
Language:EN
[2020/31]
Search report(s)(Supplementary) European search report - dispatched on:EP08.05.2017
ClassificationIPC:G06F16/332, G06F16/2455, G06F16/9535
[2020/18]
CPC:
G06F16/3328 (EP,US); G06F16/2465 (CN); G06F16/9535 (CN,US);
G06F16/2282 (CN); G06F16/2455 (EP,US); G06F16/284 (CN);
G06F3/048 (EP,US); G06F30/00 (EP,US) (-)
Former IPC [2017/24]G06F3/048, G06F17/30
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/03]
Former [2017/24]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:GEFÜHRTES PROGRESSIVES SUCHSYSTEM UND VERFAHREN[2017/24]
English:GUIDED PROGRESSIVE SEARCH SYSTEM AND METHOD[2017/24]
French:PROCÉDÉ ET SYSTÈME DE RECHERCHE PROGRESSIVE GUIDÉE[2017/24]
Examination procedure18.11.2016Date on which the examining division has become responsible
07.12.2017Amendment by applicant (claims and/or description)
07.12.2017Examination requested  [2018/03]
07.04.2020Communication of intention to grant the patent
18.06.2020Fee for grant paid
18.06.2020Fee for publishing/printing paid
18.06.2020Receipt of the translation of the claim(s)
Opposition(s)30.04.2021No opposition filed within time limit [2021/27]
Fees paidRenewal fee
19.11.2018Renewal fee patent year 03
19.11.2019Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU18.11.2016
AL29.07.2020
AT29.07.2020
CY29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
MK29.07.2020
MT29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
TR29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IE18.11.2020
LU18.11.2020
IS29.11.2020
BE30.11.2020
CH30.11.2020
LI30.11.2020
PT30.11.2020
[2022/34]
Former [2022/32]HU18.11.2016
AL29.07.2020
AT29.07.2020
CY29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
MK29.07.2020
MT29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
TR29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IE18.11.2020
LU18.11.2020
IS29.11.2020
CH30.11.2020
LI30.11.2020
PT30.11.2020
Former [2022/27]HU18.11.2016
AL29.07.2020
AT29.07.2020
CY29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
MT29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
TR29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IE18.11.2020
LU18.11.2020
IS29.11.2020
CH30.11.2020
LI30.11.2020
PT30.11.2020
Former [2021/46]AL29.07.2020
AT29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IE18.11.2020
LU18.11.2020
IS29.11.2020
CH30.11.2020
LI30.11.2020
PT30.11.2020
Former [2021/37]AL29.07.2020
AT29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
LU18.11.2020
IS29.11.2020
CH30.11.2020
LI30.11.2020
PT30.11.2020
Former [2021/36]AL29.07.2020
AT29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
LU18.11.2020
IS29.11.2020
PT30.11.2020
Former [2021/33]AL29.07.2020
AT29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
LU18.11.2020
IS29.11.2020
PT30.11.2020
Former [2021/31]AL29.07.2020
AT29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/28]AL29.07.2020
AT29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/25]AL29.07.2020
AT29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/22]AT29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/20]AT29.07.2020
DK29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
NL29.07.2020
PL29.07.2020
RS29.07.2020
SE29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/17]AT29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
LT29.07.2020
LV29.07.2020
NL29.07.2020
PL29.07.2020
RS29.07.2020
SE29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/10]AT29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
LT29.07.2020
LV29.07.2020
PL29.07.2020
RS29.07.2020
SE29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/09]AT29.07.2020
ES29.07.2020
FI29.07.2020
LT29.07.2020
SE29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
PT30.11.2020
Former [2021/08]ES29.07.2020
FI29.07.2020
LT29.07.2020
SE29.07.2020
BG29.10.2020
NO29.10.2020
PT30.11.2020
Former [2021/07]FI29.07.2020
LT29.07.2020
NO29.10.2020
Documents cited:Search[I]US7149983  (ROBERTSON GEORGE G [US], et al) [I] 1-15 * column 29, line 56 - column 31, line 29 ** figures 34-37 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.