blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3170879

EP3170879 - ABRASIVE GRAIN WITH A SURFACE CONTAINING AT LEAST ONE BASE SURFACE WITH AN OUTER CONTOUR HAVING AT LEAST SEVEN CORNERS [Right-click to bookmark this link]
Former [2017/21]ABRASIVE GRIT COMPRISING FIRST SURFACE WITHOUT CORNER AND SECOND SURFACE WITH CORNER
[2021/13]
StatusNo opposition filed within time limit
Status updated on  15.07.2022
Database last updated on 05.10.2024
FormerThe patent has been granted
Status updated on  06.08.2021
FormerGrant of patent is intended
Status updated on  23.03.2021
FormerExamination is in progress
Status updated on  16.08.2019
FormerRequest for examination was made
Status updated on  09.03.2018
FormerThe application has been published
Status updated on  21.04.2017
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024 [2024/41]
Applicant(s)For all designated states
Robert Bosch GmbH
Postfach 30 02 20
70442 Stuttgart / DE
[2020/18]
Former [2017/21]For all designated states
ROBERT BOSCH GMBH
Postfach 30 02 20
70442 Stuttgart / DE
Inventor(s)01 / Hejtmann, Georg
Seelhofenstr. 43
74395 Mundelsheim / DE
02 / Lindemann, Gert
Lerchenweg 10
72805 Lichtenstein / DE
03 / Stedile, Petra
Langer Weg 5
73732 Esslingen / DE
04 / Fuenfschilling, Stefan
Thundorferstrasse 58b
8500 Frauenfeld / CH
05 / Jenni, Adrian
Turnerstr. 28
9000 St. Gallen / CH
06 / Pleschinger, Tony
Bruehlstr. 9
71679 Asperg / DE
 [2017/21]
Application number, filing date16199983.431.07.2013
[2017/21]
Priority number, dateEP2012017893102.08.2012         Original published format: EP 12178931
DE20121021362902.08.2012         Original published format: DE102012213629
EP2012017893702.08.2012         Original published format: EP 12178937
DE20121021363202.08.2012         Original published format: DE102012213632
[2017/21]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP3170879
Date:24.05.2017
Language:DE
[2017/21]
Type: A3 Search report 
No.:EP3170879
Date:06.09.2017
Language:DE
[2017/36]
Type: B1 Patent specification 
No.:EP3170879
Date:08.09.2021
Language:DE
[2021/36]
Search report(s)(Supplementary) European search report - dispatched on:EP03.08.2017
ClassificationIPC:C09K3/14, B24D3/14, C04B35/111, C04B35/626
[2017/21]
CPC:
C09K3/1409 (EP,CN,US); B24D3/14 (CN); C04B35/1115 (EP,CN,US);
C04B35/6261 (EP,CN,US); C09K3/1418 (US); C09K3/1427 (EP,US);
C04B2235/3206 (EP,CN,US); C04B2235/6027 (EP,CN,US); C04B2235/6567 (EP,CN,US);
C04B2235/94 (EP,CN,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/15]
Former [2017/21]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:SCHLEIFKORN MIT EINER OBERFLÄCHE, DIE MINDESTENS EINE GRUNDFLÄCHE MIT EINER AUSSENKONTUR ENTHÄLT, DIE MINDESTENS SIEBEN ECKEN AUFWEIST[2021/13]
English:ABRASIVE GRAIN WITH A SURFACE CONTAINING AT LEAST ONE BASE SURFACE WITH AN OUTER CONTOUR HAVING AT LEAST SEVEN CORNERS[2021/13]
French:GRAIN ABRASIF AYANT UNE SURFACE COMPRENANT AU MOINS UNE SURFACE DE BASE AVEC UN CONTOUR EXTÉRIEUR AYANT AU MOINS SEPT COINS[2021/13]
Former [2017/21]SCHLEIFKORN, ENTHALTEND EINE ERSTE FLÄCHE OHNE ECKE UND ZWEITE FLÄCHE MIT ECKE
Former [2017/21]ABRASIVE GRIT COMPRISING FIRST SURFACE WITHOUT CORNER AND SECOND SURFACE WITH CORNER
Former [2017/21]GRAIN ABRASIF COMPRENANT UNE PREMIÈRE SURFACE SANS ANGLE ET UNE SECONDE SURFACE AVEC ANGLE
Examination procedure22.11.2016Date on which the examining division has become responsible
06.02.2018Amendment by applicant (claims and/or description)
06.03.2018Examination requested  [2018/15]
20.08.2019Despatch of a communication from the examining division (Time limit: M06)
14.02.2020Reply to a communication from the examining division
24.03.2021Communication of intention to grant the patent
15.07.2021Fee for grant paid
15.07.2021Fee for publishing/printing paid
15.07.2021Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP13744534.2  / EP2880117
Opposition(s)09.06.2022No opposition filed within time limit [2022/33]
Fees paidRenewal fee
22.03.2017Renewal fee patent year 03
22.03.2017Renewal fee patent year 04
31.07.2017Renewal fee patent year 05
31.07.2018Renewal fee patent year 06
31.07.2019Renewal fee patent year 07
31.07.2020Renewal fee patent year 08
02.08.2021Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU31.07.2013
AL08.09.2021
CY08.09.2021
CZ08.09.2021
DK08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
IT08.09.2021
LT08.09.2021
LV08.09.2021
MC08.09.2021
MK08.09.2021
MT08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SI08.09.2021
SK08.09.2021
SM08.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
[2024/41]
Former [2024/22]HU31.07.2013
AL08.09.2021
CY08.09.2021
CZ08.09.2021
DK08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
IT08.09.2021
LT08.09.2021
LV08.09.2021
MC08.09.2021
MK08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SI08.09.2021
SK08.09.2021
SM08.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2024/20]HU31.07.2013
AL08.09.2021
CY08.09.2021
CZ08.09.2021
DK08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
IT08.09.2021
LT08.09.2021
LV08.09.2021
MC08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SI08.09.2021
SK08.09.2021
SM08.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2024/18]HU31.07.2013
AL08.09.2021
CZ08.09.2021
DK08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
IT08.09.2021
LT08.09.2021
LV08.09.2021
MC08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SI08.09.2021
SK08.09.2021
SM08.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2023/11]AL08.09.2021
CZ08.09.2021
DK08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
IT08.09.2021
LT08.09.2021
LV08.09.2021
MC08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SI08.09.2021
SK08.09.2021
SM08.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2023/10]AL08.09.2021
CZ08.09.2021
DK08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
IT08.09.2021
LT08.09.2021
LV08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SI08.09.2021
SK08.09.2021
SM08.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2022/36]AL08.09.2021
CZ08.09.2021
DK08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SI08.09.2021
SK08.09.2021
SM08.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2022/29]AL08.09.2021
CZ08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SK08.09.2021
SM08.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2022/25]CZ08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SK08.09.2021
SM08.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2022/24]CZ08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SK08.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2022/23]CZ08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
PL08.09.2021
RS08.09.2021
SE08.09.2021
SK08.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
PT10.01.2022
Former [2022/10]ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
RS08.09.2021
SE08.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
Former [2022/09]ES08.09.2021
FI08.09.2021
LT08.09.2021
RS08.09.2021
SE08.09.2021
BG08.12.2021
NO08.12.2021
Former [2022/08]ES08.09.2021
FI08.09.2021
LT08.09.2021
SE08.09.2021
BG08.12.2021
NO08.12.2021
Former [2022/07]LT08.09.2021
NO08.12.2021
Documents cited:Search[XI]US2012167481  (YENER DORUK O [US], et al) [X] 1,10,13,15 * figures 1-3; claims 1, 26, 29 * * the whole document * [I] 2-9,12;
 [XI]US5681217  (HOOPMAN TIMOTHY L [US], et al) [X] 1,10,13,15 * column 16, lines 42-55; figure 10 * * the whole document * [I] 2-9,12;
 [XI]US5989111  (LAMPHERE CRAIG F [US], et al) [X] 1,10,13,15 * column 16, lines 20-34; figure 1; claim 13 * * the whole document * [I] 2-9,12;
 [XDI]US5201916  (BERG TODD A [US], et al) [XD] 11 * example 11; claim 1 * * the whole document * [I] 14
by applicantUS5201916
 EP0615816
 WO2009085841
 WO2010077495
 WO2010077518
 WO2010077491
 WO2010077519
 WO2011068724
 WO2011109188
 WO2010077509
 WO2011068714
 WO2011139562
 WO2012018903
 WO2012061016
 WO9612776
 WO2011087649
 WO2012061033
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.