EP3184930 - ARRANGEMENT MADE UP OF A REFRIGERATING SYSTEM AND A BUILDING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.02.2022 Database last updated on 18.01.2025 | |
Former | The patent has been granted Status updated on 05.03.2021 | ||
Former | Grant of patent is intended Status updated on 18.11.2020 | ||
Former | Examination is in progress Status updated on 13.11.2019 | ||
Former | Request for examination was made Status updated on 24.11.2017 | ||
Former | The application has been published Status updated on 26.05.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Société Industrielle de Chauffage (SIC) Rue des Fondeurs 59660 Merville / FR | [2021/14] |
Former [2017/26] | For all designated states Societe Industrielle de Chauffage (SIC) Rue des Fondeurs 59660 Merville / FR | Inventor(s) | 01 /
ANTOINE, Emmanuel 14 allée du Commonwealth 59270 Bailleul / FR | 02 /
CLEMENT, Jean-Francis 38 rue Guyonnet 85000 La Roche-Sur-Yon / FR | [2017/26] | Representative(s) | Ipsilon Le Centralis 63, avenue du Général Leclerc 92340 Bourg-la-Reine / FR | [2021/14] |
Former [2017/26] | Lenne, Laurence, et al Ipsilon Le Centralis 63, avenue du Général Leclerc 92340 Bourg-la-Reine / FR | Application number, filing date | 16202489.7 | 06.12.2016 | [2017/26] | Priority number, date | FR20150062972 | 21.12.2015 Original published format: FR 1562972 | [2017/26] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP3184930 | Date: | 28.06.2017 | Language: | FR | [2017/26] | Type: | B1 Patent specification | No.: | EP3184930 | Date: | 07.04.2021 | Language: | FR | [2021/14] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 21.04.2017 | Classification | IPC: | F24H9/02, F24H9/12, F24D3/18, F24D19/10 | [2017/26] | CPC: |
F24D3/18 (EP);
F24D19/1039 (EP,US);
F24H9/02 (EP);
F24H9/139 (EP);
F24D2200/12 (EP);
Y02B30/12 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/52] |
Former [2017/26] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | ANORDNUNG AUS EINER KÜHLANLAGE UND EINEM GEBÄUDE | [2017/26] | English: | ARRANGEMENT MADE UP OF A REFRIGERATING SYSTEM AND A BUILDING | [2017/26] | French: | AGENCEMENT CONSTITUE D'UNE INSTALLATION FRIGORIFIQUE ET D'UN BATIMENT | [2017/26] | Examination procedure | 06.12.2016 | Date on which the examining division has become responsible | 16.11.2017 | Amendment by applicant (claims and/or description) | 16.11.2017 | Examination requested [2017/52] | 18.11.2019 | Despatch of a communication from the examining division (Time limit: M06) | 29.04.2020 | Reply to a communication from the examining division | 19.11.2020 | Communication of intention to grant the patent | 02.03.2021 | Fee for grant paid | 02.03.2021 | Fee for publishing/printing paid | 02.03.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 10.01.2022 | No opposition filed within time limit [2022/11] | Fees paid | Renewal fee | 19.12.2018 | Renewal fee patent year 03 | 23.12.2019 | Renewal fee patent year 04 | 24.12.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 06.12.2016 | AL | 07.04.2021 | CY | 07.04.2021 | DK | 07.04.2021 | EE | 07.04.2021 | FI | 07.04.2021 | HR | 07.04.2021 | LV | 07.04.2021 | MC | 07.04.2021 | MK | 07.04.2021 | MT | 07.04.2021 | RO | 07.04.2021 | RS | 07.04.2021 | SE | 07.04.2021 | SI | 07.04.2021 | SK | 07.04.2021 | SM | 07.04.2021 | TR | 07.04.2021 | BG | 07.07.2021 | NO | 07.07.2021 | GR | 08.07.2021 | IS | 07.08.2021 | PT | 09.08.2021 | LU | 06.12.2021 | CH | 31.12.2021 | LI | 31.12.2021 | [2024/41] |
Former [2024/29] | HU | 06.12.2016 | |
AL | 07.04.2021 | ||
CY | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
MK | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
TR | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
LU | 06.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2024/22] | HU | 06.12.2016 | |
AL | 07.04.2021 | ||
CY | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
MK | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
LU | 06.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/30] | HU | 06.12.2016 | |
AL | 07.04.2021 | ||
CY | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
LU | 06.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/29] | HU | 06.12.2016 | |
AL | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
LU | 06.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/03] | AL | 07.04.2021 | |
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
LU | 06.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2022/46] | AL | 07.04.2021 | |
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
LU | 06.12.2021 | ||
Former [2022/33] | AL | 07.04.2021 | |
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/29] | AL | 07.04.2021 | |
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LV | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/26] | AL | 07.04.2021 | |
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LV | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/23] | DK | 07.04.2021 | |
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LV | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/10] | DK | 07.04.2021 | |
EE | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LV | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
PT | 09.08.2021 | ||
IS | 22.12.2021 | ||
Former [2022/08] | DK | 07.04.2021 | |
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LV | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/07] | FI | 07.04.2021 | |
HR | 07.04.2021 | ||
LV | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2021/51] | FI | 07.04.2021 | |
HR | 07.04.2021 | ||
LV | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2021/50] | FI | 07.04.2021 | |
HR | 07.04.2021 | ||
LV | 07.04.2021 | ||
SE | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
PT | 09.08.2021 | ||
Former [2021/49] | FI | 07.04.2021 | |
HR | 07.04.2021 | ||
LV | 07.04.2021 | ||
SE | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
Former [2021/47] | FI | 07.04.2021 | |
BG | 07.07.2021 | ||
Former [2021/46] | FI | 07.04.2021 | Documents cited: | Search | [A]FR2554565 (LEBLANC SA E L M [FR]) [A] 1-9 * pages 2, 3; figure 1 *; | [A]US5038580 (HART DAVID P [US]) [A] 1-9* the whole document *; | [A]AT2168U (NEUDORFER JOHANN [AT]) [A] 1-6,9 * the whole document *; | [XAI]WO0237595 (VAILLANT GMBH [DE], et al) [X] 1,6 * page 1, line 4 - page 2, line 6 * * page 4, lines 18-25 * * pages 7, 8; figure 1 * [A] 2-4 [I] 5,7-9 |