blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3333442

EP3333442 - FIXING FOR A BRAKE CARRIER AND A MOUNT FOR A DISC BRAKE AND METHOD THEREOF [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  26.03.2021
Database last updated on 13.09.2024
FormerThe patent has been granted
Status updated on  17.04.2020
FormerGrant of patent is intended
Status updated on  09.12.2019
FormerExamination is in progress
Status updated on  03.06.2019
FormerRequest for examination was made
Status updated on  21.12.2018
FormerThe application has been published
Status updated on  11.05.2018
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): BE
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Meritor Heavy Vehicle Braking Systems (UK) Limited
Grange Road Cwmbran
Gwent NP44 3XU / GB
[2018/24]
Inventor(s)01 / KNOOP, Dietmar
c/o Meritor Heavy Vehicle Braking Systems (UK)
Limited
Grange Road
Cwmbran, Gwent NP44 3XU / GB
 [2018/24]
Representative(s)Foot, Paul Matthew James
Withers & Rogers LLP
2 London Bridge
London SE1 9RA / GB
[N/P]
Former [2018/24]Foot, Paul Matthew James
Withers & Rogers LLP
4 More London Riverside
London
Greater London SE1 2AU / GB
Application number, filing date16202554.806.12.2016
[2018/24]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3333442
Date:13.06.2018
Language:EN
[2018/24]
Type: B1 Patent specification 
No.:EP3333442
Date:20.05.2020
Language:EN
[2020/21]
Search report(s)(Supplementary) European search report - dispatched on:EP30.05.2017
ClassificationIPC:F16D65/00, F16D55/227
[2018/24]
CPC:
F16D65/0056 (EP,US); F16D55/227 (EP,US); F16D2055/0008 (EP,US);
F16D2200/0013 (US); F16D2200/0021 (US); F16D2250/0084 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/04]
Former [2018/24]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:BEFESTIGUNG FÜR BREMSTRÄGER UND HALTERUNG FÜR EINE SCHEIBENBREMSE UND VERFAHREN DAFÜR[2018/24]
English:FIXING FOR A BRAKE CARRIER AND A MOUNT FOR A DISC BRAKE AND METHOD THEREOF[2018/24]
French:FIXATION POUR UN SUPPORT DE FREIN ET SUPPORT POUR UN FREIN À DISQUE ET PROCÉDÉ ASSOCIÉ[2018/24]
Examination procedure13.12.2018Amendment by applicant (claims and/or description)
13.12.2018Examination requested  [2019/04]
13.12.2018Date on which the examining division has become responsible
06.06.2019Despatch of a communication from the examining division (Time limit: M04)
17.09.2019Reply to a communication from the examining division
10.12.2019Communication of intention to grant the patent
08.04.2020Fee for grant paid
08.04.2020Fee for publishing/printing paid
08.04.2020Receipt of the translation of the claim(s)
Opposition(s)23.02.2021No opposition filed within time limit [2021/17]
Fees paidRenewal fee
31.12.2018Renewal fee patent year 03
27.12.2019Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU06.12.2016
AL20.05.2020
AT20.05.2020
CY20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
MK20.05.2020
MT20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
TR20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
PT21.09.2020
GB06.12.2020
IE06.12.2020
LU06.12.2020
BE31.12.2020
CH31.12.2020
LI31.12.2020
[2022/33]
Former [2022/32]HU06.12.2016
AL20.05.2020
AT20.05.2020
CY20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
MK20.05.2020
MT20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
TR20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
PT21.09.2020
GB06.12.2020
IE06.12.2020
LU06.12.2020
CH31.12.2020
LI31.12.2020
Former [2022/27]HU06.12.2016
AL20.05.2020
AT20.05.2020
CY20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
MT20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
TR20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
PT21.09.2020
GB06.12.2020
IE06.12.2020
LU06.12.2020
CH31.12.2020
LI31.12.2020
Former [2022/10]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
PT21.09.2020
GB06.12.2020
IE06.12.2020
LU06.12.2020
CH31.12.2020
LI31.12.2020
Former [2021/52]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
GB06.12.2020
IE06.12.2020
LU06.12.2020
CH31.12.2020
LI31.12.2020
Former [2021/49]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
GB06.12.2020
IE06.12.2020
LU06.12.2020
Former [2021/46]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
IE06.12.2020
LU06.12.2020
Former [2021/40]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/24]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/10]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/09]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
NL20.05.2020
RO20.05.2020
RS20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/08]AL20.05.2020
DK20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
NL20.05.2020
RO20.05.2020
RS20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/04]AL20.05.2020
FI20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
NL20.05.2020
RS20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/01]FI20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
RS20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2020/51]FI20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
RS20.05.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2020/50]FI20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2020/48]FI20.05.2020
LT20.05.2020
NO20.08.2020
IS20.09.2020
PT21.09.2020
Former [2020/47]LT20.05.2020
NO20.08.2020
IS20.09.2020
Former [2020/46]IS20.09.2020
Documents cited:Search[A]DE19946891  (CONTINENTAL TEVES AG & CO OHG [DE]) [A] 1,2 * column 3, line 49 - line 64; figure . *;
 [A]JP2002155910  (ARAI GUMI LTD) [A] 1,2* abstract *;
 [A]EP1437521  (PEUGEOT CITROEN AUTOMOBILES SA [FR]) [A] 1-15 * paragraph [0013] - paragraph [0019] *;
 [A]WO2006007892  (SAUER ACHSENFAB [DE], et al) [A] 1-15 * page 5, line 17 - page 8, line 27; figure - *;
 [A]DE102005059247  (KNORR BREMSE SYSTEME [DE]) [A] 1-15 * paragraph [0025] - paragraph [0028]; figure - *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.