EP3211315 - COMBUSTOR ASSEMBLY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.02.2022 Database last updated on 22.01.2025 | |
Former | The patent has been granted Status updated on 19.03.2021 | ||
Former | Grant of patent is intended Status updated on 17.11.2020 | ||
Former | Examination is in progress Status updated on 31.08.2018 | ||
Former | Request for examination was made Status updated on 09.03.2018 | ||
Former | The application has been published Status updated on 28.07.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states General Electric Company 1 River Road Schenectady, NY 12345 / US | [2017/35] | Inventor(s) | 01 /
HANNWACKER, David Andrew 1000 Western Avenue Lynn, MA 01910 / US | 02 /
HOWELL, Stephen John 1000 Western Avenue Lynn, MA 01910 / US | [2021/16] |
Former [2017/35] | 01 /
HANNWACKER, David Andrew 1000 Western Avenue Lynn, MA Massachusetts 01910 / US | ||
02 /
HOWELL, Stephen John 1000 Western Avenue Lynn, MA Massachusetts 01910 / US | Representative(s) | Openshaw & Co. 8 Castle Street Farnham, Surrey GU9 7HR / GB | [2021/16] |
Former [2017/35] | Pöpper, Evamaria General Electric Technology GmbH GE Corporate Intellectual Property Brown Boveri Strasse 7 5400 Baden / CH | Application number, filing date | 16206157.6 | 22.12.2016 | [2017/35] | Priority number, date | US201615053541 | 25.02.2016 Original published format: US201615053541 | [2017/35] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3211315 | Date: | 30.08.2017 | Language: | EN | [2017/35] | Type: | B1 Patent specification | No.: | EP3211315 | Date: | 21.04.2021 | Language: | EN | [2021/16] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 25.07.2017 | Classification | IPC: | F23R3/00 | [2020/48] | CPC: |
F23R3/04 (EP,US);
F23R3/283 (EP,CN,US);
F02C7/18 (US);
F23R3/007 (EP);
F23R3/02 (US);
F23R2900/03044 (EP,US);
Y02T50/60 (EP,US)
(-)
|
Former IPC [2017/35] | F23R3/04, F23R3/28 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/15] |
Former [2017/35] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | BRENNKAMMERANORDNUNG | [2017/35] | English: | COMBUSTOR ASSEMBLY | [2017/35] | French: | ASSEMBLAGE DE CHAMBRE DE COMBUSTION | [2017/35] | Examination procedure | 22.12.2016 | Date on which the examining division has become responsible | 27.02.2018 | Amendment by applicant (claims and/or description) | 28.02.2018 | Examination requested [2018/15] | 30.08.2018 | Despatch of a communication from the examining division (Time limit: M06) | 01.03.2019 | Reply to a communication from the examining division | 09.01.2020 | Cancellation of oral proceeding that was planned for 21.01.2020 | 21.01.2020 | Date of oral proceedings (cancelled) | 24.01.2020 | Despatch of a communication from the examining division (Time limit: M06) | 12.06.2020 | Reply to a communication from the examining division | 18.11.2020 | Communication of intention to grant the patent | 15.03.2021 | Fee for grant paid | 15.03.2021 | Fee for publishing/printing paid | 15.03.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 24.01.2022 | No opposition filed within time limit [2022/13] | Fees paid | Renewal fee | 02.01.2019 | Renewal fee patent year 03 | 19.12.2019 | Renewal fee patent year 04 | 17.12.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.12.2016 | AL | 21.04.2021 | AT | 21.04.2021 | CY | 21.04.2021 | CZ | 21.04.2021 | DK | 21.04.2021 | EE | 21.04.2021 | ES | 21.04.2021 | FI | 21.04.2021 | HR | 21.04.2021 | IT | 21.04.2021 | LT | 21.04.2021 | LV | 21.04.2021 | MC | 21.04.2021 | MK | 21.04.2021 | MT | 21.04.2021 | NL | 21.04.2021 | PL | 21.04.2021 | RO | 21.04.2021 | RS | 21.04.2021 | SE | 21.04.2021 | SI | 21.04.2021 | SK | 21.04.2021 | SM | 21.04.2021 | TR | 21.04.2021 | BG | 21.07.2021 | NO | 21.07.2021 | GR | 22.07.2021 | IS | 21.08.2021 | PT | 23.08.2021 | IE | 22.12.2021 | LU | 22.12.2021 | BE | 31.12.2021 | CH | 31.12.2021 | LI | 31.12.2021 | [2024/41] |
Former [2024/29] | HU | 22.12.2016 | |
AL | 21.04.2021 | ||
AT | 21.04.2021 | ||
CY | 21.04.2021 | ||
CZ | 21.04.2021 | ||
DK | 21.04.2021 | ||
EE | 21.04.2021 | ||
ES | 21.04.2021 | ||
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
IT | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
MC | 21.04.2021 | ||
MK | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RO | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SI | 21.04.2021 | ||
SK | 21.04.2021 | ||
SM | 21.04.2021 | ||
TR | 21.04.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
IE | 22.12.2021 | ||
LU | 22.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2024/22] | HU | 22.12.2016 | |
AL | 21.04.2021 | ||
AT | 21.04.2021 | ||
CY | 21.04.2021 | ||
CZ | 21.04.2021 | ||
DK | 21.04.2021 | ||
EE | 21.04.2021 | ||
ES | 21.04.2021 | ||
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
IT | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
MC | 21.04.2021 | ||
MK | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RO | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SI | 21.04.2021 | ||
SK | 21.04.2021 | ||
SM | 21.04.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
IE | 22.12.2021 | ||
LU | 22.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/30] | HU | 22.12.2016 | |
AL | 21.04.2021 | ||
AT | 21.04.2021 | ||
CY | 21.04.2021 | ||
CZ | 21.04.2021 | ||
DK | 21.04.2021 | ||
EE | 21.04.2021 | ||
ES | 21.04.2021 | ||
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
IT | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
MC | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RO | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SI | 21.04.2021 | ||
SK | 21.04.2021 | ||
SM | 21.04.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
IE | 22.12.2021 | ||
LU | 22.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/29] | HU | 22.12.2016 | |
AL | 21.04.2021 | ||
AT | 21.04.2021 | ||
CZ | 21.04.2021 | ||
DK | 21.04.2021 | ||
EE | 21.04.2021 | ||
ES | 21.04.2021 | ||
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
IT | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
MC | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RO | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SI | 21.04.2021 | ||
SK | 21.04.2021 | ||
SM | 21.04.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
IE | 22.12.2021 | ||
LU | 22.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/03] | AL | 21.04.2021 | |
AT | 21.04.2021 | ||
CZ | 21.04.2021 | ||
DK | 21.04.2021 | ||
EE | 21.04.2021 | ||
ES | 21.04.2021 | ||
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
IT | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
MC | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RO | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SI | 21.04.2021 | ||
SK | 21.04.2021 | ||
SM | 21.04.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
IE | 22.12.2021 | ||
LU | 22.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/01] | AL | 21.04.2021 | |
AT | 21.04.2021 | ||
CZ | 21.04.2021 | ||
DK | 21.04.2021 | ||
EE | 21.04.2021 | ||
ES | 21.04.2021 | ||
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
IT | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
MC | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RO | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SI | 21.04.2021 | ||
SK | 21.04.2021 | ||
SM | 21.04.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
IE | 22.12.2021 | ||
LU | 22.12.2021 | ||
BE | 31.12.2021 | ||
Former [2022/48] | AL | 21.04.2021 | |
AT | 21.04.2021 | ||
CZ | 21.04.2021 | ||
DK | 21.04.2021 | ||
EE | 21.04.2021 | ||
ES | 21.04.2021 | ||
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
IT | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
MC | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RO | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SI | 21.04.2021 | ||
SK | 21.04.2021 | ||
SM | 21.04.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
IE | 22.12.2021 | ||
LU | 22.12.2021 | ||
Former [2022/46] | AL | 21.04.2021 | |
AT | 21.04.2021 | ||
CZ | 21.04.2021 | ||
DK | 21.04.2021 | ||
EE | 21.04.2021 | ||
ES | 21.04.2021 | ||
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
IT | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
MC | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RO | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SI | 21.04.2021 | ||
SK | 21.04.2021 | ||
SM | 21.04.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
LU | 22.12.2021 | ||
Former [2022/36] | AL | 21.04.2021 | |
AT | 21.04.2021 | ||
CZ | 21.04.2021 | ||
DK | 21.04.2021 | ||
EE | 21.04.2021 | ||
ES | 21.04.2021 | ||
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
IT | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
MC | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RO | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SI | 21.04.2021 | ||
SK | 21.04.2021 | ||
SM | 21.04.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
Former [2022/33] | AL | 21.04.2021 | |
AT | 21.04.2021 | ||
CZ | 21.04.2021 | ||
DK | 21.04.2021 | ||
EE | 21.04.2021 | ||
ES | 21.04.2021 | ||
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
MC | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RO | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SI | 21.04.2021 | ||
SK | 21.04.2021 | ||
SM | 21.04.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
Former [2022/29] | AL | 21.04.2021 | |
AT | 21.04.2021 | ||
CZ | 21.04.2021 | ||
DK | 21.04.2021 | ||
EE | 21.04.2021 | ||
ES | 21.04.2021 | ||
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RO | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SI | 21.04.2021 | ||
SK | 21.04.2021 | ||
SM | 21.04.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
Former [2022/26] | AL | 21.04.2021 | |
AT | 21.04.2021 | ||
CZ | 21.04.2021 | ||
DK | 21.04.2021 | ||
EE | 21.04.2021 | ||
ES | 21.04.2021 | ||
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RO | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SK | 21.04.2021 | ||
SM | 21.04.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
Former [2022/23] | AT | 21.04.2021 | |
CZ | 21.04.2021 | ||
DK | 21.04.2021 | ||
EE | 21.04.2021 | ||
ES | 21.04.2021 | ||
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RO | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SK | 21.04.2021 | ||
SM | 21.04.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
Former [2022/10] | AT | 21.04.2021 | |
CZ | 21.04.2021 | ||
DK | 21.04.2021 | ||
EE | 21.04.2021 | ||
ES | 21.04.2021 | ||
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RO | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SK | 21.04.2021 | ||
SM | 21.04.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
PT | 23.08.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 21.04.2021 | |
CZ | 21.04.2021 | ||
DK | 21.04.2021 | ||
ES | 21.04.2021 | ||
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RO | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SK | 21.04.2021 | ||
SM | 21.04.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
Former [2022/08] | AT | 21.04.2021 | |
CZ | 21.04.2021 | ||
DK | 21.04.2021 | ||
ES | 21.04.2021 | ||
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SM | 21.04.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
Former [2022/07] | AT | 21.04.2021 | |
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
SM | 21.04.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
Former [2021/52] | AT | 21.04.2021 | |
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
NL | 21.04.2021 | ||
PL | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
Former [2021/51] | AT | 21.04.2021 | |
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
NL | 21.04.2021 | ||
RS | 21.04.2021 | ||
SE | 21.04.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
IS | 21.08.2021 | ||
PT | 23.08.2021 | ||
Former [2021/50] | AT | 21.04.2021 | |
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
NL | 21.04.2021 | ||
SE | 21.04.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
PT | 23.08.2021 | ||
Former [2021/49] | AT | 21.04.2021 | |
FI | 21.04.2021 | ||
HR | 21.04.2021 | ||
LT | 21.04.2021 | ||
LV | 21.04.2021 | ||
NL | 21.04.2021 | ||
SE | 21.04.2021 | ||
BG | 21.07.2021 | ||
NO | 21.07.2021 | ||
GR | 22.07.2021 | ||
Former [2021/47] | AT | 21.04.2021 | |
FI | 21.04.2021 | ||
LT | 21.04.2021 | ||
NL | 21.04.2021 | ||
BG | 21.07.2021 | ||
Former [2021/46] | AT | 21.04.2021 | |
FI | 21.04.2021 | ||
LT | 21.04.2021 | Documents cited: | Search | [XI]US4322945 (PETERSON STEVEN C, et al) [X] 1-6,8-15 * column 1, lines 16-17, 59-60, 64-65 * * column 2, lines 34-36, 46-50 * * column 3, lines 39-45 * * figures 1, 2, 3 * [I] 7; | [X]US5321951 (FALLS STEPHEN W [US], et al) [X] 1-6,8-15* figure 1 *; | [X]US2003061815 (YOUNG CRAIG DOUGLAS [US], et al) [X] 1-6,8-15 * figure 1 *; | [X]EP1408280 (GEN ELECTRIC [US]) [X] 1-6,8-15 * figure 2 *; | [X]US2004083735 (BORNS FREDERICK G [US], et al) [X] 1-6,8-15 * figure 2 *; | [X]EP1524472 (GEN ELECTRIC [US]) [X] 1-6,8-15 * figure 3 *; | [X]FR2889732 (SNECMA [FR]) [X] 1-6,8-15 * figure 1 *; | [X]WO2008108810 (SOLAR TURBINES INC [US], et al) [X] 1-6,8-15 * figure 3 *; | [X]FR2989451 (SNECMA [FR]) [X] 1-6,8-15 * figure 3 * | Examination | FR2935465 | US2010257864 |