EP3338928 - CUTTING INSERT AND SHOULDER MILLING TOOL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.02.2023 Database last updated on 18.11.2024 | |
Former | The patent has been granted Status updated on 25.02.2022 | ||
Former | Grant of patent is intended Status updated on 11.10.2021 | ||
Former | Examination is in progress Status updated on 03.02.2020 | ||
Former | Request for examination was made Status updated on 18.01.2019 | ||
Former | The application has been published Status updated on 25.05.2018 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Sandvik Intellectual Property AB 811 81 Sandviken / SE | [2018/26] | Inventor(s) | 01 /
JANSSON UDD, Jörgen Skogsmursvägen 9 SE-802 64 Gävle / SE | 02 /
ERIKSSON, Thomas Hosjöstrand 41 SE-791 47 FALUN / SE | [2018/26] | Representative(s) | Sandvik Sandvik Intellectual Property AB 811 81 Sandviken / SE | [2018/26] | Application number, filing date | 16206443.0 | 22.12.2016 | [2018/26] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3338928 | Date: | 27.06.2018 | Language: | EN | [2018/26] | Type: | B1 Patent specification | No.: | EP3338928 | Date: | 30.03.2022 | Language: | EN | [2022/13] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 17.07.2017 | Classification | IPC: | B23C5/06, B23C5/20, B23C5/22 | [2018/26] | CPC: |
B23C5/06 (EP,KR,RU,US);
B23C5/202 (US);
B23C5/205 (KR);
B23C5/2213 (EP,KR);
B23C2200/0411 (EP,KR);
B23C2200/128 (EP,KR);
B23C2200/201 (EP,KR,US);
B23C2200/205 (EP,KR);
B23C2200/208 (EP,KR,US);
B23C2200/284 (EP);
B23C2200/286 (US);
B23C2210/168 (EP,KR,US);
B23C5/22 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/08] |
Former [2018/26] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SCHNEIDEINSATZ UND SCHULTERFRÄSWERKZEUG | [2018/26] | English: | CUTTING INSERT AND SHOULDER MILLING TOOL | [2018/26] | French: | INSERT DE DÉCOUPE ET FRAISE POUR ÉPAULEMENT | [2018/26] | Examination procedure | 12.12.2018 | Amendment by applicant (claims and/or description) | 02.01.2019 | Examination requested [2019/08] | 02.01.2019 | Date on which the examining division has become responsible | 06.02.2020 | Despatch of a communication from the examining division (Time limit: M04) | 01.06.2020 | Reply to a communication from the examining division | 27.10.2021 | Communication of intention to grant the patent | 17.02.2022 | Fee for grant paid | 17.02.2022 | Fee for publishing/printing paid | 17.02.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 03.01.2023 | No opposition filed within time limit [2023/10] | Fees paid | Renewal fee | 02.01.2019 | Renewal fee patent year 03 | 02.01.2020 | Renewal fee patent year 04 | 11.01.2021 | Renewal fee patent year 05 | 03.01.2022 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.12.2016 | AL | 30.03.2022 | AT | 30.03.2022 | CY | 30.03.2022 | CZ | 30.03.2022 | DK | 30.03.2022 | EE | 30.03.2022 | ES | 30.03.2022 | FI | 30.03.2022 | HR | 30.03.2022 | LT | 30.03.2022 | LV | 30.03.2022 | MC | 30.03.2022 | MK | 30.03.2022 | MT | 30.03.2022 | NL | 30.03.2022 | PL | 30.03.2022 | RO | 30.03.2022 | RS | 30.03.2022 | SE | 30.03.2022 | SI | 30.03.2022 | SK | 30.03.2022 | SM | 30.03.2022 | TR | 30.03.2022 | BG | 30.06.2022 | NO | 30.06.2022 | GR | 01.07.2022 | IS | 30.07.2022 | PT | 01.08.2022 | IE | 22.12.2022 | LU | 22.12.2022 | BE | 31.12.2022 | CH | 31.12.2022 | LI | 31.12.2022 | [2024/42] |
Former [2024/29] | HU | 22.12.2016 | |
AL | 30.03.2022 | ||
AT | 30.03.2022 | ||
CY | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
MK | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
TR | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
IE | 22.12.2022 | ||
LU | 22.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/27] | HU | 22.12.2016 | |
AL | 30.03.2022 | ||
AT | 30.03.2022 | ||
CY | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MK | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
IE | 22.12.2022 | ||
LU | 22.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/21] | HU | 22.12.2016 | |
AL | 30.03.2022 | ||
AT | 30.03.2022 | ||
CY | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
IE | 22.12.2022 | ||
LU | 22.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/18] | HU | 22.12.2016 | |
AL | 30.03.2022 | ||
AT | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
IE | 22.12.2022 | ||
LU | 22.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/49] | AL | 30.03.2022 | |
AT | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
IE | 22.12.2022 | ||
LU | 22.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/48] | AL | 30.03.2022 | |
AT | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
IE | 22.12.2022 | ||
LU | 22.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/47] | AL | 30.03.2022 | |
AT | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
LU | 22.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/38] | AL | 30.03.2022 | |
AT | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
LU | 22.12.2022 | ||
Former [2023/25] | AL | 30.03.2022 | |
AT | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/07] | AL | 30.03.2022 | |
AT | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/01] | AL | 30.03.2022 | |
AT | 30.03.2022 | ||
CZ | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/51] | AT | 30.03.2022 | |
CZ | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/50] | AT | 30.03.2022 | |
CZ | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/49] | AT | 30.03.2022 | |
CZ | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/48] | AT | 30.03.2022 | |
CZ | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/47] | AT | 30.03.2022 | |
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/44] | FI | 30.03.2022 | |
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
Former [2022/39] | FI | 30.03.2022 | |
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
Former [2022/36] | HR | 30.03.2022 | |
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
Former [2022/35] | HR | 30.03.2022 | |
LT | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
Former [2022/33] | LT | 30.03.2022 | |
NO | 30.06.2022 | Documents cited: | Search | [X]WO2014006609 (ISCAR LTD [IL]) [X] 1,3-5 * abstract * * page 6, line 23 - page 7, line 2 * * page 8, line 4 - line 14 * * page 10, line 12 - line 14 * * figure - *; | [XI]US2015190868 (KOIFMAN ALEXANDER [IL], et al) [X] 1,3,6,8 * abstract * * figures 8-14 * * paragraphs [0001] , [0002] , [0009] - [0017] - [0030] , [0031] , [0057] , [0 59] , [0 62] * [I] 2,7; | [X]US2016082528 (BALLAS ASSAF [IL]) [X] 1,4* the whole document * | Examination | EP3162481 | EP3338926 | by applicant | WO2015174200 |