EP3301884 - DATA TRANSFERRING METHOD BASED ON PROTECTION AND CONTROL SYSTEM FOR INTELLIGENT SUBSTATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.07.2020 Database last updated on 13.07.2024 | |
Former | The patent has been granted Status updated on 12.07.2019 | ||
Former | Grant of patent is intended Status updated on 07.03.2019 | ||
Former | Request for examination was made Status updated on 02.03.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Kyland Technology Co., Ltd. F15 Building 2 No. 30 Shixing Road Shijingshan District Beijing 100041 / CN | [2018/14] | Inventor(s) | 01 /
DING, Yuqi Building No.2 30 Shixing Avenue Shijingshan District Beijing, 100041 / CN | [2018/14] | Representative(s) | Gevers Patents De Kleetlaan 7A 1831 Diegem / BE | [N/P] |
Former [2018/14] | Gevers Patents Intellectual Property House Holidaystraat 5 1831 Diegem / BE | Application number, filing date | 16207225.0 | 29.12.2016 | [2018/14] | Priority number, date | CN201610866118 | 29.09.2016 Original published format: CN201610866118 | [2018/14] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3301884 | Date: | 04.04.2018 | Language: | EN | [2018/14] | Type: | B1 Patent specification | No.: | EP3301884 | Date: | 14.08.2019 | Language: | EN | [2019/33] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 17.05.2017 | Classification | IPC: | H04L12/24, H02J13/00, H04L12/853, H04Q9/02, H04L29/08, G06F1/26 | [2019/13] | CPC: |
H04L67/12 (EP,US);
H04L49/30 (CN);
G06F1/26 (US);
H02J13/0013 (CN);
H04L41/069 (US);
H04L47/2416 (US);
H04Q2209/826 (US);
H04Q9/02 (US);
Y02E60/00 (EP);
|
Former IPC [2018/14] | H04L29/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/14] | Title | German: | DATENÜBERTRAGUNGSVERFAHREN AUF BASIS EINES SCHUTZ- UND STEUERUNGSSYSTEMS FÜR INTELLIGENTE UNTERSTATION | [2018/14] | English: | DATA TRANSFERRING METHOD BASED ON PROTECTION AND CONTROL SYSTEM FOR INTELLIGENT SUBSTATION | [2018/14] | French: | PROCÉDÉ DE TRANSFERT DE DONNÉES SUR LA BASE D'UN SYSTÈME DE PROTECTION ET DE COMMANDE DE SOUS-STATION INTELLIGENTE | [2018/14] | Examination procedure | 29.12.2016 | Examination requested [2018/14] | 29.12.2016 | Date on which the examining division has become responsible | 03.10.2018 | Amendment by applicant (claims and/or description) | 08.03.2019 | Communication of intention to grant the patent | 04.07.2019 | Fee for grant paid | 04.07.2019 | Fee for publishing/printing paid | 04.07.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 03.06.2020 | No opposition filed within time limit [2020/33] | Fees paid | Renewal fee | 19.12.2018 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.12.2016 | AL | 14.08.2019 | AT | 14.08.2019 | CY | 14.08.2019 | CZ | 14.08.2019 | DK | 14.08.2019 | EE | 14.08.2019 | FI | 14.08.2019 | HR | 14.08.2019 | LT | 14.08.2019 | LV | 14.08.2019 | MC | 14.08.2019 | MK | 14.08.2019 | MT | 14.08.2019 | PL | 14.08.2019 | RO | 14.08.2019 | RS | 14.08.2019 | SI | 14.08.2019 | SK | 14.08.2019 | SM | 14.08.2019 | BG | 14.11.2019 | NO | 14.11.2019 | GR | 15.11.2019 | IS | 14.12.2019 | IE | 29.12.2019 | LU | 29.12.2019 | BE | 31.12.2019 | [2022/32] |
Former [2021/34] | HU | 29.12.2016 | |
AL | 14.08.2019 | ||
AT | 14.08.2019 | ||
CY | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
MC | 14.08.2019 | ||
MT | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SI | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
IE | 29.12.2019 | ||
LU | 29.12.2019 | ||
BE | 31.12.2019 | ||
Former [2021/32] | HU | 29.12.2016 | |
AL | 14.08.2019 | ||
AT | 14.08.2019 | ||
CY | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
MC | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SI | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
IE | 29.12.2019 | ||
LU | 29.12.2019 | ||
BE | 31.12.2019 | ||
Former [2021/26] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
CY | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
MC | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SI | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
IE | 29.12.2019 | ||
LU | 29.12.2019 | ||
BE | 31.12.2019 | ||
Former [2020/51] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
MC | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SI | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
IE | 29.12.2019 | ||
LU | 29.12.2019 | ||
BE | 31.12.2019 | ||
Former [2020/46] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
MC | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SI | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
IE | 29.12.2019 | ||
LU | 29.12.2019 | ||
Former [2020/39] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
MC | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SI | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
Former [2020/37] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SI | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
Former [2020/36] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
Former [2020/27] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SK | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
Former [2020/22] | AL | 14.08.2019 | |
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
RS | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
Former [2020/15] | AL | 14.08.2019 | |
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
RS | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
Former [2020/12] | FI | 14.08.2019 | |
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
RS | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
Former [2020/10] | FI | 14.08.2019 | |
LT | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
Former [2020/09] | FI | 14.08.2019 | |
LT | 14.08.2019 | ||
NO | 14.11.2019 | ||
Former [2020/08] | LT | 14.08.2019 | |
NO | 14.11.2019 | Documents cited: | Search | [A]CN103683502 (XUJI ELECTRIC CO LTD, et al) [A] 1-11 * page 2, line 9 - page 3, line 33; figure 1 ** page 4, line 5 - page 5, line 50 *; | [XY]CN103887885 (STATE GRID CORP CHINA, et al) [X] 1,9,11 * paragraphs [0001] , [ 0013] - [0017] - [ 0031] - [0034] * * figures 1-5 * [Y] 10; | [Y]CN104008214 (SP NICE SYSTEM CONTROL INC) [Y] 10 * page 2, line 10 - page 4, line 22 * |