blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3188349

EP3188349 - SYSTEMS AND METHODS FOR CONNECTING ENERGY SOURCES TO POWER DISTRIBUTION NETWORK [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  23.10.2020
Database last updated on 03.09.2024
FormerRequest for examination was made
Status updated on  02.06.2017
Most recent event   Tooltip23.10.2020Application deemed to be withdrawnpublished on 25.11.2020  [2020/48]
Applicant(s)For all designated states
Revolt LLC
2018 East Thomas Avenue
Milwaukee, WI 53211 / US
[2017/27]
Inventor(s)01 / Katcha, Jason Stuart
5537 North Bay Ridge Avenue
Whitefish Bay, WI Wisconsin 53217 / US
 [2017/27]
Representative(s)Carpmael, Robert Maurice Charles
Marks & Clerk LLP
15 Fetter Lane
London EC4A 1BW / GB
[N/P]
Former [2017/27]Carpmael, Robert Maurice Charles
Marks & Clerk LLP
90 Long Acre
London WC2E 9RA / GB
Application number, filing date16207564.230.12.2016
[2017/27]
Priority number, dateUS20151498627331.12.2015         Original published format: US201514986273
[2017/27]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3188349
Date:05.07.2017
Language:EN
[2017/27]
Search report(s)(Supplementary) European search report - dispatched on:EP28.04.2017
ClassificationIPC:H02M1/00, H02M7/48, H02J3/38, H02J9/00, H02J7/35, // H02M3/335, H02J9/06
[2017/27]
CPC:
H02J3/388 (EP,US); H02J3/381 (EP,US); H02J5/00 (US);
H02J7/35 (EP,US); H02J9/062 (EP,US); H02M3/33507 (EP,US);
H02M7/4807 (EP,US); H02J2300/24 (EP,US); H02J2300/28 (EP,US);
H02J9/063 (EP,US); H02M1/007 (EP,US); Y02B10/70 (EP,US);
Y02E10/56 (EP,US); Y02E10/76 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/27]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:SYSTEME UND VERFAHREN ZUM VERBINDEN VON ENERGIEQUELLEN MIT DEM STROMVERSORGUNGSNETZ[2017/27]
English:SYSTEMS AND METHODS FOR CONNECTING ENERGY SOURCES TO POWER DISTRIBUTION NETWORK[2017/27]
French:SYSTÈMES ET PROCÉDÉS PERMETTANT DE CONNECTER DES SOURCES D'ÉNERGIE À UN RÉSEAU DE DISTRIBUTION D'ÉNERGIE[2017/27]
Examination procedure30.12.2016Examination requested  [2017/27]
30.12.2016Date on which the examining division has become responsible
05.01.2018Amendment by applicant (claims and/or description)
01.07.2020Application deemed to be withdrawn, date of legal effect  [2020/48]
21.07.2020Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time  [2020/48]
Fees paidRenewal fee
28.01.2019Renewal fee patent year 03
Penalty fee
Additional fee for renewal fee
31.12.201803   M06   Fee paid on   28.01.2019
31.12.201904   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XYI]EP1531542  (SHARP KK [JP]) [X] 1-7 * abstract * * paragraphs [0051] , [0 74] , [0 78]; figures 2, 4 * [Y] 1-15 [I] 8;
 [A]US2009302686  (FISHMAN OLEG S [US]) [A] 1-15 * abstract ** paragraph [0158]; figures 46, 47 *;
 [A]EP2256894  (GEN ELECTRIC [US]) [A] 1-15 * abstract *;
 [A]US8023295  (SHEKHAWAT SAMPAT [US], et al) [A] 1-15 * abstract *;
 [A]US2013027979  (PHADKE VIJAY G [PH]) [A] 1-15 * abstract *;
 [A]WO2013127230  (LEADSOLAR ENERGY CO LTD [CN]) [A] 1-15 * abstract *;
 [Y]EP2701264  (KYOCERA CORP [JP]) [Y] 1-15 * abstract * * paragraphs [0021] - [0023] - [0 27] - [0038] - [0 41] - [0051]; figures 1-3 *;
 [A]US2014078791  (GURUDASANI VIJAY DAYALDAS [IN], et al) [A] 1-15 * abstract *;
 [A]WO2014203561  (SHARP KK [JP]) [A] 1-15 * abstract *;
 [A]US2014375131  (SPANOCHE SORIN [US], et al) [A] 1-15 * abstract * * paragraph [0031]; figure 2 *;
 [A]US2015078049  (YOO ANNO [KR], et al) [A] 1-15 * abstract * * paragraph [0055]; figure 5 *;
 [A]US2015288188  (KESHNER MARVIN S [US], et al) [A] 1-15 * abstract *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.