blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

Latvia joins the Federated Register
Click here for more information on the Federated Register.

2025-04-16

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3301263

EP3301263 - TURBINE EXHAUST STRUCTURE OF PARTICULAR DESIGN [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  02.10.2020
Database last updated on 26.04.2025
FormerThe patent has been granted
Status updated on  25.10.2019
FormerGrant of patent is intended
Status updated on  20.05.2019
FormerRequest for examination was made
Status updated on  12.10.2018
FormerThe application has been published
Status updated on  02.03.2018
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
General Electric Technology GmbH
Brown Boveri Strasse 7
5400 Baden / CH
[2019/48]
Former [2018/14]For all designated states
General Electric Technology GmbH
Brown Boveri Strasse 7
5400 Baden / CH
Inventor(s)01 / Santais, Frederic
204 Rond-point du pont de Sèvres
Boulogne Billancourt 92100 / FR
 [2018/14]
Representative(s)BRP Renaud & Partner mbB Rechtsanwälte Patentanwälte Steuerberater
Königstraße 28
70173 Stuttgart / DE
[2019/48]
Former [2018/14]General Electric Technology GmbH
Global Patent Operation - Europe
Brown Boveri Strasse 7
5400 Baden / CH
Application number, filing date16290192.003.10.2016
[2018/14]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3301263
Date:04.04.2018
Language:EN
[2018/14]
Type: B1 Patent specification 
No.:EP3301263
Date:27.11.2019
Language:EN
[2019/48]
Search report(s)(Supplementary) European search report - dispatched on:EP03.03.2017
ClassificationIPC:F01D9/06
[2018/14]
CPC:
F01D9/06 (EP,US); F01D25/24 (US); F01D25/243 (US);
F01D25/30 (US); F05B2260/60 (EP,US); F05D2220/31 (EP,US);
F05D2230/70 (EP,US); F05D2240/10 (US); F05D2260/60 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/46]
Former [2018/14]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:BESONDERE GESTALTUNG EINER TURBINENABGASSTRUKTUR[2019/25]
English:TURBINE EXHAUST STRUCTURE OF PARTICULAR DESIGN[2018/14]
French:STRUCTURE D'ÉCHAPPEMENT DE PARTICULIÈRE CONCEPTION[2018/14]
Former [2018/14]BESONDERE GESTALTUNG EINER TURBINENABGASSSTRUKTUR
Examination procedure04.10.2018Amendment by applicant (claims and/or description)
04.10.2018Examination requested  [2018/46]
04.10.2018Date on which the examining division has become responsible
21.05.2019Communication of intention to grant the patent
27.09.2019Fee for grant paid
27.09.2019Fee for publishing/printing paid
27.09.2019Receipt of the translation of the claim(s)
Opposition(s)28.08.2020No opposition filed within time limit [2020/45]
Fees paidRenewal fee
31.10.2018Renewal fee patent year 03
21.10.2019Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU03.10.2016
AL27.11.2019
AT27.11.2019
CY27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
ES27.11.2019
HR27.11.2019
IT27.11.2019
LT27.11.2019
LV27.11.2019
MC27.11.2019
MK27.11.2019
MT27.11.2019
NL27.11.2019
PL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SI27.11.2019
SK27.11.2019
SM27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
[2022/32]
Former [2022/28]HU03.10.2016
AL27.11.2019
AT27.11.2019
CY27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
ES27.11.2019
HR27.11.2019
IT27.11.2019
LT27.11.2019
LV27.11.2019
MC27.11.2019
MT27.11.2019
NL27.11.2019
PL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SI27.11.2019
SK27.11.2019
SM27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
Former [2021/31]AL27.11.2019
AT27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
ES27.11.2019
HR27.11.2019
IT27.11.2019
LT27.11.2019
LV27.11.2019
MC27.11.2019
NL27.11.2019
PL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SI27.11.2019
SK27.11.2019
SM27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
Former [2021/10]AL27.11.2019
AT27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
ES27.11.2019
HR27.11.2019
IT27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
PL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SI27.11.2019
SK27.11.2019
SM27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
Former [2020/51]AL27.11.2019
AT27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
ES27.11.2019
HR27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
PL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SI27.11.2019
SK27.11.2019
SM27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
Former [2020/37]AL27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
ES27.11.2019
HR27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SK27.11.2019
SM27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
Former [2020/36]AL27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
ES27.11.2019
HR27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
Former [2020/35]AL27.11.2019
CZ27.11.2019
ES27.11.2019
HR27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
Former [2020/34]AL27.11.2019
ES27.11.2019
HR27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
RS27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
Former [2020/32]AL27.11.2019
HR27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
RS27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
Former [2020/26]HR27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
RS27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
Former [2020/24]LT27.11.2019
LV27.11.2019
NL27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
Former [2020/23]LT27.11.2019
LV27.11.2019
NL27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
Former [2020/22]LT27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
Former [2020/21]NO27.02.2020
Documents cited:Search[XI]US2005072157  (TAKAHASHI MASAKI [JP], et al) [X] 1-4,6,10-13 * paragraph [0020]; figure 1 *[I] 8,9;
 [X]US2007014671  (ARAI MASAHIKO [JP], et al) [X] 1-4,6-13 * paragraphs [0068] - [0072]; figure 5 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.