blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3214032

EP3214032 - ADJUSTABLE BRAKE CONTROLLER OF AN ELEVATOR BRAKE, ELEVATOR BRAKE AND ELEVATOR [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  05.03.2021
Database last updated on 08.10.2024
FormerThe patent has been granted
Status updated on  27.03.2020
FormerGrant of patent is intended
Status updated on  15.10.2019
FormerRequest for examination was made
Status updated on  16.02.2018
FormerThe application has been published
Status updated on  04.08.2017
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024 [2024/41]
Applicant(s)For all designated states
Kone Corporation
Kartanontie 1
00330 Helsinki / FI
[2017/36]
Inventor(s)01 / Vakkamäki, Henri
Kaskenpolttajantie 21 A B
00670 Helsinki / FI
02 / Korhonen, Tuukka
Haagan pappilantie 5A8
00320 Helsinki / FI
03 / Stolt, Lauri
Haagan urheilutie 13 A 16
00320 Helsinki / FI
04 / Pikivirta, Ari
Tammenterho 38
12400 Tervakoski / FI
05 / Nakari, Arto
Kynnöstie 6
05810 Hyvinkää / FI
 [2017/36]
Representative(s)Berggren Oy, Helsinki & Oulu
P.O. Box 16
Eteläinen Rautatiekatu 10A
00101 Helsinki / FI
[2017/36]
Application number, filing date16397506.303.03.2016
[2017/36]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3214032
Date:06.09.2017
Language:EN
[2017/36]
Type: B1 Patent specification 
No.:EP3214032
Date:29.04.2020
Language:EN
[2020/18]
Search report(s)(Supplementary) European search report - dispatched on:EP16.09.2016
ClassificationIPC:B66B1/32, B66D5/30, B66D5/08
[2019/35]
CPC:
B66B1/32 (EP,CN,US); B66B1/365 (US); B66D5/08 (EP,CN,US);
B66D5/30 (EP,CN,US); F16D49/00 (US); F16D65/16 (US);
F16D2121/14 (US); F16D2121/22 (US); F16D2125/582 (US) (-)
Former IPC [2017/36]B66B1/32
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/12]
Former [2017/36]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:EINSTELLBARE BREMSSTEUERUNG EINER AUFZUGSBREMSE, AUFZUGSBREMSE UND AUFZUG[2017/36]
English:ADJUSTABLE BRAKE CONTROLLER OF AN ELEVATOR BRAKE, ELEVATOR BRAKE AND ELEVATOR[2017/36]
French:CONTRÔLEUR DE RÉGLAGE D'UN FREIN D'ASCENSEUR, LEDIT FREIN ET ASCENSEUR[2017/36]
Examination procedure03.03.2016Date on which the examining division has become responsible
06.02.2018Amendment by applicant (claims and/or description)
06.02.2018Examination requested  [2018/12]
16.10.2019Communication of intention to grant the patent
14.02.2020Fee for grant paid
14.02.2020Fee for publishing/printing paid
14.02.2020Receipt of the translation of the claim(s)
Opposition(s)01.02.2021No opposition filed within time limit [2021/14]
Fees paidRenewal fee
23.03.2018Renewal fee patent year 03
26.03.2019Renewal fee patent year 04
24.03.2020Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU03.03.2016
AL29.04.2020
AT29.04.2020
CY29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
MK29.04.2020
MT29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
TR29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
[2024/41]
Former [2024/29]HU03.03.2016
AL29.04.2020
AT29.04.2020
CY29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
MK29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
TR29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2024/22]HU03.03.2016
AL29.04.2020
AT29.04.2020
CY29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
MK29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2023/30]HU03.03.2016
AL29.04.2020
AT29.04.2020
CY29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2023/27]HU03.03.2016
AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/45]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/24]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/10]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/09]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/08]AL29.04.2020
DK29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/04]AL29.04.2020
FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
RS29.04.2020
SE29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/01]FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
RS29.04.2020
SE29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2020/51]FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
RS29.04.2020
SE29.04.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2020/50]FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
SE29.04.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2020/48]FI29.04.2020
LT29.04.2020
SE29.04.2020
NO29.07.2020
IS29.08.2020
PT31.08.2020
Former [2020/47]LT29.04.2020
NO29.07.2020
IS29.08.2020
Former [2020/46]IS29.08.2020
Documents cited:Search[A]JP2003292257  (MITSUBISHI ELECTRIC CORP) [A] 1* figure 1 *;
 [XI]WO2005047157  (KONE CORP [FI], et al) [X] 1-6 * pages 10-11; figure 4; claims 10,12 * [I] 7;
 [A]WO2010100316  (KONE CORP [FI], et al) [A] 1 * figures 1,2 *;
 [A]EP2287102  (MITSUBISHI ELECTRIC CORP [JP]) [A] 1 * paragraphs [0021] - [0026] - [0031] - [0033] - [0041] - [0043]; figures 1,3 *;
 [XI]WO2012052600  (KONE CORP [FI], et al) [X] 1-6 * figures 1,2a,2b; claims 1,12 * [I] 7
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.