| EP3211968 - CIRCUIT ASSEMBLY FOR THE OPERATION OF AT LEAST ONE LED LAMP [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.11.2021 Database last updated on 28.02.2026 | |
| Former | The patent has been granted Status updated on 27.11.2020 | ||
| Former | Grant of patent is intended Status updated on 17.08.2020 | ||
| Former | Examination is in progress Status updated on 06.04.2018 | ||
| Former | Request for examination was made Status updated on 28.12.2017 | ||
| Former | The application has been published Status updated on 28.07.2017 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states METZE, Michael Distelweg 4 3032 Eichgraben / AT | [2017/35] | Inventor(s) | 01 /
see applicant ... | [2017/35] | Representative(s) | Beer & Partner Patentanwälte KG Lindengasse 8 1070 Wien / AT | [2017/35] | Application number, filing date | 16450029.0 | 02.11.2016 | [2017/35] | Priority number, date | AT20160000099 | 25.02.2016 Original published format: AT 992016 | [2017/35] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3211968 | Date: | 30.08.2017 | Language: | DE | [2017/35] | Type: | B1 Patent specification | No.: | EP3211968 | Date: | 30.12.2020 | Language: | DE | [2020/53] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 17.05.2017 | Classification | IPC: | H05B45/357, F21V25/10, F21V25/04, F21K9/27, A63H33/16, B31D5/00 | [2020/34] | CPC: |
B31D5/0086 (EP,US);
A63H33/16 (EP);
F21V25/04 (AT);
F21V25/10 (AT);
H05B45/00 (EP,AT,US);
H05B45/357 (EP,US);
Y02B20/30 (EP)
(-)
|
| Former IPC [2017/35] | H05B33/08, F21V25/10, F21V25/04, F21K9/27 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/04] |
| Former [2017/35] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SCHALTUNGSANORDNUNG ZUM BETRIEB VON MINDESTENS EINER LED-LEUCHTE | [2017/35] | English: | CIRCUIT ASSEMBLY FOR THE OPERATION OF AT LEAST ONE LED LAMP | [2017/35] | French: | SYSTÈME DE COMMUTATION DESTINÉ AU FONCTIONNEMENT D'AU MOINS UNE LAMPE À DEL | [2017/35] | Examination procedure | 02.11.2016 | Date on which the examining division has become responsible | 12.12.2017 | Amendment by applicant (claims and/or description) | 12.12.2017 | Examination requested [2018/04] | 10.04.2018 | Despatch of a communication from the examining division (Time limit: M04) | 07.08.2018 | Reply to a communication from the examining division | 27.02.2019 | Despatch of a communication from the examining division (Time limit: M04) | 27.06.2019 | Reply to a communication from the examining division | 18.08.2020 | Communication of intention to grant the patent | 07.10.2020 | Fee for grant paid | 07.10.2020 | Fee for publishing/printing paid | 07.10.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 01.10.2021 | No opposition filed within time limit [2021/49] | Fees paid | Renewal fee | 28.11.2018 | Renewal fee patent year 03 | 26.02.2020 | Renewal fee patent year 04 | 19.11.2020 | Renewal fee patent year 05 | Penalty fee | Additional fee for renewal fee | 30.11.2019 | 04   M06   Fee paid on   26.02.2020 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 02.11.2016 | AL | 30.12.2020 | CY | 30.12.2020 | CZ | 30.12.2020 | DK | 30.12.2020 | EE | 30.12.2020 | ES | 30.12.2020 | FI | 30.12.2020 | HR | 30.12.2020 | IT | 30.12.2020 | LT | 30.12.2020 | LV | 30.12.2020 | MC | 30.12.2020 | MK | 30.12.2020 | MT | 30.12.2020 | NL | 30.12.2020 | PL | 30.12.2020 | RO | 30.12.2020 | RS | 30.12.2020 | SE | 30.12.2020 | SI | 30.12.2020 | SK | 30.12.2020 | SM | 30.12.2020 | TR | 30.12.2020 | BG | 30.03.2021 | NO | 30.03.2021 | GR | 31.03.2021 | IS | 30.04.2021 | PT | 30.04.2021 | [2026/04] |
| Former [2024/41] | HU | 02.11.2016 | |
| AL | 30.12.2020 | ||
| CY | 30.12.2020 | ||
| CZ | 30.12.2020 | ||
| DK | 30.12.2020 | ||
| EE | 30.12.2020 | ||
| ES | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| IT | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| MC | 30.12.2020 | ||
| MK | 30.12.2020 | ||
| MT | 30.12.2020 | ||
| NL | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SI | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| SM | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| IS | 30.04.2021 | ||
| PT | 30.04.2021 | ||
| Former [2024/22] | HU | 02.11.2016 | |
| AL | 30.12.2020 | ||
| CY | 30.12.2020 | ||
| CZ | 30.12.2020 | ||
| DK | 30.12.2020 | ||
| EE | 30.12.2020 | ||
| ES | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| IT | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| MC | 30.12.2020 | ||
| MK | 30.12.2020 | ||
| NL | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SI | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| SM | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| IS | 30.04.2021 | ||
| PT | 30.04.2021 | ||
| Former [2023/33] | HU | 02.11.2016 | |
| AL | 30.12.2020 | ||
| CY | 30.12.2020 | ||
| CZ | 30.12.2020 | ||
| DK | 30.12.2020 | ||
| EE | 30.12.2020 | ||
| ES | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| IT | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| MC | 30.12.2020 | ||
| NL | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SI | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| SM | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| IS | 30.04.2021 | ||
| PT | 30.04.2021 | ||
| Former [2023/30] | HU | 02.11.2016 | |
| AL | 30.12.2020 | ||
| CY | 30.12.2020 | ||
| CZ | 30.12.2020 | ||
| DK | 30.12.2020 | ||
| EE | 30.12.2020 | ||
| ES | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| IT | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| MC | 30.12.2020 | ||
| NL | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SI | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| IS | 30.04.2021 | ||
| PT | 30.04.2021 | ||
| Former [2023/29] | HU | 02.11.2016 | |
| AL | 30.12.2020 | ||
| CZ | 30.12.2020 | ||
| DK | 30.12.2020 | ||
| EE | 30.12.2020 | ||
| ES | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| IT | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| MC | 30.12.2020 | ||
| NL | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SI | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| IS | 30.04.2021 | ||
| PT | 30.04.2021 | ||
| Former [2022/33] | AL | 30.12.2020 | |
| CZ | 30.12.2020 | ||
| DK | 30.12.2020 | ||
| EE | 30.12.2020 | ||
| ES | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| IT | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| MC | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SI | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| IS | 30.04.2021 | ||
| PT | 30.04.2021 | ||
| Former [2022/23] | AL | 30.12.2020 | |
| CZ | 30.12.2020 | ||
| DK | 30.12.2020 | ||
| EE | 30.12.2020 | ||
| ES | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| IT | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SI | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| IS | 30.04.2021 | ||
| PT | 30.04.2021 | ||
| Former [2022/13] | AL | 30.12.2020 | |
| CZ | 30.12.2020 | ||
| DK | 30.12.2020 | ||
| EE | 30.12.2020 | ||
| ES | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| IT | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SI | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| PT | 30.04.2021 | ||
| Former [2022/10] | AL | 30.12.2020 | |
| CZ | 30.12.2020 | ||
| DK | 30.12.2020 | ||
| EE | 30.12.2020 | ||
| ES | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| IT | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| PT | 30.04.2021 | ||
| Former [2022/08] | AL | 30.12.2020 | |
| CZ | 30.12.2020 | ||
| DK | 30.12.2020 | ||
| EE | 30.12.2020 | ||
| ES | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| IT | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| IS | 30.04.2021 | ||
| PT | 30.04.2021 | ||
| Former [2021/49] | AL | 30.12.2020 | |
| CZ | 30.12.2020 | ||
| DK | 30.12.2020 | ||
| EE | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| IT | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| IS | 30.04.2021 | ||
| PT | 30.04.2021 | ||
| Former [2021/48] | AL | 30.12.2020 | |
| CZ | 30.12.2020 | ||
| EE | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| IT | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| IS | 30.04.2021 | ||
| PT | 30.04.2021 | ||
| Former [2021/45] | AL | 30.12.2020 | |
| CZ | 30.12.2020 | ||
| EE | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| IS | 30.04.2021 | ||
| PT | 30.04.2021 | ||
| Former [2021/42] | CZ | 30.12.2020 | |
| EE | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| IS | 30.04.2021 | ||
| PT | 30.04.2021 | ||
| Former [2021/39] | CZ | 30.12.2020 | |
| EE | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| PL | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| PT | 30.04.2021 | ||
| Former [2021/36] | CZ | 30.12.2020 | |
| EE | 30.12.2020 | ||
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| PT | 30.04.2021 | ||
| Former [2021/35] | CZ | 30.12.2020 | |
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| RO | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| SK | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| PT | 30.04.2021 | ||
| Former [2021/34] | CZ | 30.12.2020 | |
| FI | 30.12.2020 | ||
| HR | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| PT | 30.04.2021 | ||
| Former [2021/33] | FI | 30.12.2020 | |
| HR | 30.12.2020 | ||
| LT | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| PT | 30.04.2021 | ||
| Former [2021/28] | FI | 30.12.2020 | |
| HR | 30.12.2020 | ||
| LV | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| Former [2021/24] | FI | 30.12.2020 | |
| LV | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| BG | 30.03.2021 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| Former [2021/23] | FI | 30.12.2020 | |
| LV | 30.12.2020 | ||
| RS | 30.12.2020 | ||
| SE | 30.12.2020 | ||
| NO | 30.03.2021 | ||
| GR | 31.03.2021 | ||
| Former [2021/22] | FI | 30.12.2020 | |
| RS | 30.12.2020 | ||
| NO | 30.03.2021 | ||
| Former [2021/20] | FI | 30.12.2020 | Documents cited: | Search | [XI] DE102014204875 (OSRAM GMBH et al.) [X] 1-3 * paragraph [0050] - paragraph [0052]; figure 4 *[I] 4 | [XI] WO2011014111 (TD LIGHT SWEDEN AB et al.) [X] 1-3 * page 8, line 22 - page 11, line 26; figures 3, 4 *[I] 4 | [XI] DE202010010536 (ASMETEC GMBH et al.) [X] 1-3 * paragraph [0008] - paragraph [0017]; figures 3-5 *[I] 4 | [XI] AU2009101044 (ENLIGHTEN AUSTRALIA PTY LTD et al.) [X] 1-3 * page 6 - page 7 *[I] 4 | [XI] DE19900889 (SURESH HIRALAL SHAH et al.) [X] 1-3 * column 2, line 65 - column 3, line 35; figure 2 *[I] 4 | [A] WO2015014680 (KONINKL PHILIPS NV et al.) [A] 1-4 * page 3, line 17 - line 24 * | Examination | WO2015014584 |