EP3251386 - IDENTIFICATION OF SOURCES OF MEDIA TRAFFIC THROUGH A NETWORK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.03.2022 Database last updated on 08.10.2024 | |
Former | The patent has been granted Status updated on 26.03.2021 | ||
Former | Grant of patent is intended Status updated on 28.10.2020 | ||
Former | Examination is in progress Status updated on 01.06.2018 | ||
Former | Request for examination was made Status updated on 03.11.2017 | ||
Former | The international publication has been made Status updated on 25.08.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Sinch Sweden AB Lindhagensgatan 74, vån 7 112 18 Stockholm / SE | [2021/35] |
Former [2021/17] | For all designated states CLX Networks AB Box 1206 164 28 Kista / SE | ||
Former [2017/49] | For all designated states CLX Networks AB Box 1206 164 28 Kista / SE | Inventor(s) | 01 /
NEAL, Peter 9 Dawes Road Belrose, New South Wales 2085 / AU | 02 /
DAVIES, Owen Mark 17 Alinta Close Thornleigh, New South Wales 2120 / AU | 03 /
DODDS, Richard David Cochrane 22B 39 Ocean Avenue Double Bay, NSW 2022 / AU | [2018/28] |
Former [2017/49] | 01 /
NEAL, Peter 9 Dawes Road Belrose, New South Wales 2085 / AU | ||
02 /
DAVIES, Owen Mark 17 Alinta Close Thornleigh, New South Wales 2120 / AU | |||
03 /
DODDS, Richard David Cochrane Unit 13 230 - 234 Old South Head Road Bondi Beach, New South Wales 2023 / AU | Representative(s) | Howe, Steven Reddie & Grose LLP The White Chapel Building 10 Whitechapel High Street London E1 8QS / GB | [2021/17] |
Former [2017/49] | Sternini-Clements, Kate Reddie & Grose LLP The White Chapel Building 10 Whitechapel High Street London E1 8QS / GB | Application number, filing date | 16702911.5 | 29.01.2016 | [2017/49] | WO2016EP51990 | Priority number, date | GB20150001602 | 30.01.2015 Original published format: GB 201501602 | [2017/49] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016120476 | Date: | 04.08.2016 | Language: | EN | [2016/31] | Type: | A1 Application with search report | No.: | EP3251386 | Date: | 06.12.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 04.08.2016 takes the place of the publication of the European patent application. | [2017/49] | Type: | B1 Patent specification | No.: | EP3251386 | Date: | 28.04.2021 | Language: | EN | [2021/17] | Search report(s) | International search report - published on: | EP | 04.08.2016 | Classification | IPC: | H04W4/12, H04L12/58, H04L29/06, H04W4/14, H04W12/08, H04W12/12 | [2017/49] | CPC: |
H04W4/12 (EP,US);
H04W4/14 (EP,GB,US);
H04L51/212 (EP,GB,US);
H04L51/58 (EP,US);
H04W12/08 (EP,US);
H04W12/12 (EP,GB,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/49] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | IDENTIFIZIERUNG VON MEDIENVERKEHRSQUELLEN ÜBER EIN NETZWERK | [2017/49] | English: | IDENTIFICATION OF SOURCES OF MEDIA TRAFFIC THROUGH A NETWORK | [2017/49] | French: | IDENTIFICATION DE SOURCES DE TRAFIC MULTIMÉDIA DANS UN RÉSEAU | [2017/49] | Entry into regional phase | 30.08.2017 | National basic fee paid | 30.08.2017 | Designation fee(s) paid | 30.08.2017 | Examination fee paid | Examination procedure | 30.08.2017 | Examination requested [2017/49] | 30.08.2017 | Date on which the examining division has become responsible | 29.03.2018 | Amendment by applicant (claims and/or description) | 01.06.2018 | Despatch of a communication from the examining division (Time limit: M04) | 14.09.2018 | Reply to a communication from the examining division | 06.09.2019 | Despatch of a communication from the examining division (Time limit: M06) | 09.03.2020 | Reply to a communication from the examining division | 19.03.2020 | Despatch of a communication from the examining division (Time limit: M06) | 23.09.2020 | Reply to a communication from the examining division | 29.10.2020 | Communication of intention to grant the patent | 05.02.2021 | Fee for grant paid | 05.02.2021 | Fee for publishing/printing paid | 05.02.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 31.01.2022 | No opposition filed within time limit [2022/14] | Fees paid | Renewal fee | 15.11.2017 | Renewal fee patent year 03 | 28.06.2019 | Renewal fee patent year 04 | 14.01.2020 | Renewal fee patent year 05 | 17.03.2021 | Renewal fee patent year 06 | Penalty fee | Additional fee for renewal fee | 31.01.2019 | 04   M06   Fee paid on   28.06.2019 | 31.01.2021 | 06   M06   Fee paid on   17.03.2021 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.01.2016 | AL | 28.04.2021 | AT | 28.04.2021 | CY | 28.04.2021 | CZ | 28.04.2021 | DK | 28.04.2021 | EE | 28.04.2021 | ES | 28.04.2021 | FI | 28.04.2021 | IT | 28.04.2021 | LT | 28.04.2021 | LV | 28.04.2021 | MC | 28.04.2021 | MK | 28.04.2021 | NL | 28.04.2021 | PL | 28.04.2021 | RO | 28.04.2021 | RS | 28.04.2021 | SE | 28.04.2021 | SI | 28.04.2021 | SK | 28.04.2021 | SM | 28.04.2021 | TR | 28.04.2021 | BG | 28.07.2021 | NO | 28.07.2021 | GR | 29.07.2021 | IS | 28.08.2021 | PT | 30.08.2021 | LU | 29.01.2022 | [2024/29] |
Former [2024/22] | HU | 29.01.2016 | |
AL | 28.04.2021 | ||
AT | 28.04.2021 | ||
CY | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
MK | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
LU | 29.01.2022 | ||
Former [2024/20] | HU | 29.01.2016 | |
AL | 28.04.2021 | ||
AT | 28.04.2021 | ||
CY | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
LU | 29.01.2022 | ||
Former [2024/18] | HU | 29.01.2016 | |
AL | 28.04.2021 | ||
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
LU | 29.01.2022 | ||
Former [2022/46] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
LU | 29.01.2022 | ||
Former [2022/39] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/36] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/29] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/26] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/23] | AT | 28.04.2021 | |
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/10] | AT | 28.04.2021 | |
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
PT | 30.08.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 28.04.2021 | |
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/08] | AT | 28.04.2021 | |
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/07] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2021/52] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2021/51] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2021/50] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
SE | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
PT | 30.08.2021 | ||
Former [2021/49] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
SE | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
Former [2021/47] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
LT | 28.04.2021 | ||
NL | 28.04.2021 | ||
BG | 28.07.2021 | ||
Former [2021/46] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
LT | 28.04.2021 | Cited in | International search | [XI]US2007275739 (BLACKBURN ROMILLY [AU]) [X] 1-4,6-9,13-16,18,19,21-24,27-31 * paragraph [0002]; figure 2 * * paragraph [0026] - paragraph [0034] * [I] 5,10-12,17,20,25,26; | [XI]US2014179360 (JACKSON JEFFREY A [US], et al) [X] 1-4,6-9,11-19,21,24,25,27-31 * figures 1,2-4,6 * * paragraph [0001] * * paragraph [0040] * * paragraph [0050] * * paragraph [0015] - paragraph [0025] * * paragraph [0066] - paragraph [0075] * [I] 5,10,20,22,23,26; | [XI] - Gsm Association, "End - to - End Functional Capability Specification for Associate - PLMN SMS - Roaming", (20051010), URL: http://www.gsma.com/newsroom/wp-content/uploads/2012/12/IR.31v3.1.0.pdf, (20160502), XP055269791 [X] 1-4,6-9,13-16,18,19,21,24,27-31 * §1.3.3 * [I] 5,10-12,17,20,22,23,25,26 |