EP3256759 - TOOTHED SPROCKET HUB WITH ELASTIC CENTERING ELEMENTS [Right-click to bookmark this link] | |||
Former [2017/51] | TOOTHED SPROCKET HUB WITH ELASTIC CENTERING ELEMENT | ||
[2021/10] | Status | No opposition filed within time limit Status updated on 25.11.2022 Database last updated on 10.07.2024 | |
Former | The patent has been granted Status updated on 17.12.2021 | ||
Former | Grant of patent is intended Status updated on 28.07.2021 | ||
Former | Examination is in progress Status updated on 07.07.2021 | ||
Former | Grant of patent is intended Status updated on 22.02.2021 | ||
Former | Examination is in progress Status updated on 21.09.2018 | ||
Former | Request for examination was made Status updated on 17.11.2017 | ||
Former | The international publication has been made Status updated on 22.08.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Gates Corporation (a Delaware corporation) IP Law Dept. 10-A3 1551 Wewatta Street Denver CO 80202 / US | [2017/51] | Inventor(s) | 01 /
CODY, Michael 370 Auburn St Boulder, Colorado 80305 / US | [2017/51] | Representative(s) | Carpmaels & Ransford LLP One Southampton Row London WC1B 5HA / GB | [2017/51] | Application number, filing date | 16705657.1 | 04.02.2016 | [2017/51] | WO2016US16489 | Priority number, date | US201514622057 | 13.02.2015 Original published format: US201514622057 | [2017/51] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016130390 | Date: | 18.08.2016 | Language: | EN | [2016/33] | Type: | A1 Application with search report | No.: | EP3256759 | Date: | 20.12.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 18.08.2016 takes the place of the publication of the European patent application. | [2017/51] | Type: | B1 Patent specification | No.: | EP3256759 | Date: | 19.01.2022 | Language: | EN | [2022/03] | Search report(s) | International search report - published on: | EP | 18.08.2016 | Classification | IPC: | F16H55/30, F16H57/00, F16H55/17, B60B27/02, B60B27/04, F16D1/116, // F16D3/62 | [2021/10] | CPC: |
B60B27/023 (EP,KR,US);
F16H55/30 (EP,CN,KR,US);
B62M9/02 (KR,US);
B60B27/04 (EP,KR,US);
F16D1/116 (EP,KR,US);
F16H55/171 (EP,CN,KR,US);
|
Former IPC [2017/51] | F16H55/30, B60B27/02, B60B27/04, F16D1/112, F16D1/116, F16H57/00, F16H55/17 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/51] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | ZAHNRADNABE MIT ELASTISCHEN ZENTRIERELEMENTEN | [2021/10] | English: | TOOTHED SPROCKET HUB WITH ELASTIC CENTERING ELEMENTS | [2021/10] | French: | MOYEU DE PIGNON DENTÉ AYANT DES ÉLÉMENTS DE CENTRAGE ÉLASTIQUES | [2021/10] |
Former [2017/51] | ZAHNRADNABE MIT ELASTISCHEM ZENTRIERELEMENT | ||
Former [2017/51] | TOOTHED SPROCKET HUB WITH ELASTIC CENTERING ELEMENT | ||
Former [2017/51] | MOYEU DE PIGNON DENTÉ AYANT UN ÉLÉMENT DE CENTRAGE ÉLASTIQUE | Entry into regional phase | 22.08.2017 | National basic fee paid | 22.08.2017 | Designation fee(s) paid | 22.08.2017 | Examination fee paid | Examination procedure | 22.08.2017 | Examination requested [2017/51] | 22.08.2017 | Date on which the examining division has become responsible | 06.04.2018 | Amendment by applicant (claims and/or description) | 24.09.2018 | Despatch of a communication from the examining division (Time limit: M04) | 31.01.2019 | Reply to a communication from the examining division | 10.04.2019 | Despatch of a communication from the examining division (Time limit: M04) | 20.08.2019 | Reply to a communication from the examining division | 23.09.2019 | Despatch of a communication from the examining division (Time limit: M04) | 03.02.2020 | Reply to a communication from the examining division | 28.05.2020 | Despatch of a communication from the examining division (Time limit: M04) | 07.10.2020 | Reply to a communication from the examining division | 23.02.2021 | Communication of intention to grant the patent | 05.07.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 29.07.2021 | Communication of intention to grant the patent | 08.12.2021 | Fee for grant paid | 08.12.2021 | Fee for publishing/printing paid | 08.12.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 20.10.2022 | No opposition filed within time limit [2022/52] | Fees paid | Renewal fee | 27.02.2018 | Renewal fee patent year 03 | 27.02.2019 | Renewal fee patent year 04 | 27.02.2020 | Renewal fee patent year 05 | 25.02.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 04.02.2016 | AL | 19.01.2022 | AT | 19.01.2022 | CY | 19.01.2022 | CZ | 19.01.2022 | DK | 19.01.2022 | EE | 19.01.2022 | ES | 19.01.2022 | FI | 19.01.2022 | HR | 19.01.2022 | IT | 19.01.2022 | LT | 19.01.2022 | LV | 19.01.2022 | MC | 19.01.2022 | MK | 19.01.2022 | NL | 19.01.2022 | PL | 19.01.2022 | RO | 19.01.2022 | RS | 19.01.2022 | SE | 19.01.2022 | SI | 19.01.2022 | SK | 19.01.2022 | SM | 19.01.2022 | TR | 19.01.2022 | IE | 04.02.2022 | LU | 04.02.2022 | BE | 28.02.2022 | CH | 28.02.2022 | LI | 28.02.2022 | BG | 19.04.2022 | NO | 19.04.2022 | GR | 20.04.2022 | IS | 19.05.2022 | PT | 19.05.2022 | [2024/29] |
Former [2024/22] | HU | 04.02.2016 | |
AL | 19.01.2022 | ||
AT | 19.01.2022 | ||
CY | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
IT | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
MK | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
IE | 04.02.2022 | ||
LU | 04.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
LI | 28.02.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2024/20] | HU | 04.02.2016 | |
AL | 19.01.2022 | ||
AT | 19.01.2022 | ||
CY | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
IT | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
IE | 04.02.2022 | ||
LU | 04.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
LI | 28.02.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2024/18] | HU | 04.02.2016 | |
AL | 19.01.2022 | ||
AT | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
IT | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
IE | 04.02.2022 | ||
LU | 04.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
LI | 28.02.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2023/35] | AL | 19.01.2022 | |
AT | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
IT | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
IE | 04.02.2022 | ||
LU | 04.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
LI | 28.02.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2023/10] | AL | 19.01.2022 | |
AT | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
IE | 04.02.2022 | ||
LU | 04.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
LI | 28.02.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2023/09] | AL | 19.01.2022 | |
AT | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
IE | 04.02.2022 | ||
LU | 04.02.2022 | ||
CH | 28.02.2022 | ||
LI | 28.02.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2023/01] | AL | 19.01.2022 | |
AT | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
LU | 04.02.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/49] | AT | 19.01.2022 | |
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
LU | 04.02.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/48] | AT | 19.01.2022 | |
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SM | 19.01.2022 | ||
LU | 04.02.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/47] | AT | 19.01.2022 | |
DK | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SM | 19.01.2022 | ||
LU | 04.02.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/46] | AT | 19.01.2022 | |
DK | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/42] | AT | 19.01.2022 | |
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/39] | AT | 19.01.2022 | |
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
PT | 19.05.2022 | ||
Former [2022/36] | AT | 19.01.2022 | |
ES | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
PT | 19.05.2022 | ||
Former [2022/35] | ES | 19.01.2022 | |
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
NL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
PT | 19.05.2022 | ||
Former [2022/34] | ES | 19.01.2022 | |
LT | 19.01.2022 | ||
NL | 19.01.2022 | ||
NO | 19.04.2022 | ||
PT | 19.05.2022 | ||
Former [2022/33] | LT | 19.01.2022 | |
NL | 19.01.2022 | ||
NO | 19.04.2022 | ||
Former [2022/30] | NL | 19.01.2022 | Cited in | International search | [X]US4311473 (SUGIMOTO KAZUO) [X] 1-7 * column 2, line 29 - column 3, line 8 * * column 3, line 66 - column 4, line 6 * * column 4, lines 47-50 * * figures 1,5 *; | [A]US4429448 (BUTZ HANS [DE]) [A] 1-7 * the whole document *; | [A]US5782712 (CAMPAGNOLO VALENTINO [IT]) [A] 1-7* the whole document *; | [A]US2007254758 (CHEN CHING-SHU [TW]) [A] 1-7 * paragraphs [0024] - [0027] *; | [A]CN203438771U (NINGBO WISDOM BICYCLE INDUSTRY CO LTD) [A] 1-7 * figures 1,2 *; | [AD]US2015016880 (NICOLAI KARLHEINZ [DE]) [AD] 1-7 * paragraphs [0021] - [0023] - [0028] , [0029] * * figures 1,2,5,6 * | by applicant | CA2749293 | US7854441 | EP2289792 | US2015016880 |