EP3271947 - SOLAR CELL WITH A METAL CHARGE CARRIER DISCHARGE STRUCTURE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.02.2021 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 06.03.2020 | ||
Former | Grant of patent is intended Status updated on 23.06.2019 | ||
Former | Examination is in progress Status updated on 18.01.2019 | ||
Former | Request for examination was made Status updated on 28.12.2017 | ||
Former | The international publication has been made Status updated on 03.01.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states SolOcean GmbH Franz Kollmannstraße 4 3300 Amstetten / AT | [2020/12] |
Former [2018/04] | For all designated states Guger Forschungs GmbH Unter St. Thomas 7 4364 St. Thomas am Blasenstein / AT | Inventor(s) | 01 /
STUCKOVÁ, Eva Strazna 9E 83101 Bratislava / SK | [2018/04] | Representative(s) | (deleted) | [2020/15] |
Former [2018/04] | Burger, Hannes, et al Anwälte Burger & Partner Rechtsanwalt GmbH Rosenauerweg 16 4580 Windischgarsten / AT | Application number, filing date | 16709681.7 | 12.02.2016 | [2018/04] | WO2016AT50028 | Priority number, date | AT20150050111 | 13.02.2015 Original published format: AT 501112015 | [2018/04] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2016127197 | Date: | 18.08.2016 | Language: | DE | [2016/33] | Type: | A1 Application with search report | No.: | EP3271947 | Date: | 24.01.2018 | Language: | DE | The application published by WIPO in one of the EPO official languages on 18.08.2016 takes the place of the publication of the European patent application. | [2018/04] | Type: | B1 Patent specification | No.: | EP3271947 | Date: | 08.04.2020 | Language: | DE | [2020/15] | Search report(s) | International search report - published on: | EP | 18.08.2016 | Classification | IPC: | H01L31/0224, H01L33/38, H01L31/05 | [2018/04] | CPC: |
H01L31/022433 (EP,AT,US);
H01L31/022441 (AT);
H01L31/0504 (EP,US);
Y02E10/50 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/04] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | SOLARZELLE MIT METALLISCHER LADUNGSTRÄGER-ABLEITSTRUKTUR | [2018/04] | English: | SOLAR CELL WITH A METAL CHARGE CARRIER DISCHARGE STRUCTURE | [2018/04] | French: | CELLULE SOLAIRE AYANT UNE STRUCTURE MÉTALLIQUE DE DÉVIATION DE PORTEURS DE CHARGE | [2018/04] | Entry into regional phase | 12.09.2017 | National basic fee paid | 12.09.2017 | Designation fee(s) paid | 12.09.2017 | Examination fee paid | Examination procedure | 13.12.2016 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 12.09.2017 | Examination requested [2018/04] | 12.09.2017 | Date on which the examining division has become responsible | 18.01.2019 | Despatch of a communication from the examining division (Time limit: M04) | 16.05.2019 | Reply to a communication from the examining division | 09.08.2019 | Communication of intention to grant the patent | 12.11.2019 | Receipt of the translation of the claim(s) | 10.12.2019 | Fee for grant paid | 10.12.2019 | Fee for publishing/printing paid | Opposition(s) | 12.01.2021 | No opposition filed within time limit [2021/11] | Fees paid | Renewal fee | 25.06.2018 | Renewal fee patent year 03 | 27.02.2019 | Renewal fee patent year 04 | 28.02.2020 | Renewal fee patent year 05 | Penalty fee | Additional fee for renewal fee | 28.02.2018 | 03   M06   Fee paid on   25.06.2018 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.02.2016 | AL | 08.04.2020 | CY | 08.04.2020 | CZ | 08.04.2020 | DK | 08.04.2020 | EE | 08.04.2020 | ES | 08.04.2020 | FI | 08.04.2020 | HR | 08.04.2020 | IT | 08.04.2020 | LT | 08.04.2020 | LV | 08.04.2020 | MC | 08.04.2020 | MK | 08.04.2020 | MT | 08.04.2020 | NL | 08.04.2020 | PL | 08.04.2020 | RO | 08.04.2020 | RS | 08.04.2020 | SE | 08.04.2020 | SI | 08.04.2020 | SK | 08.04.2020 | SM | 08.04.2020 | TR | 08.04.2020 | BG | 08.07.2020 | NO | 08.07.2020 | GR | 09.07.2020 | IS | 08.08.2020 | PT | 17.08.2020 | [2024/42] |
Former [2024/29] | HU | 12.02.2016 | |
AL | 08.04.2020 | ||
CY | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
MK | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
TR | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2024/22] | HU | 12.02.2016 | |
AL | 08.04.2020 | ||
CY | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
MK | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2023/33] | HU | 12.02.2016 | |
AL | 08.04.2020 | ||
CY | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2023/30] | AL | 08.04.2020 | |
CY | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/41] | AL | 08.04.2020 | |
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/24] | AL | 08.04.2020 | |
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/10] | AL | 08.04.2020 | |
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/09] | AL | 08.04.2020 | |
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/08] | AL | 08.04.2020 | |
DK | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/04] | AL | 08.04.2020 | |
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/01] | FI | 08.04.2020 | |
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/51] | FI | 08.04.2020 | |
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/50] | FI | 08.04.2020 | |
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
SE | 08.04.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/48] | FI | 08.04.2020 | |
LT | 08.04.2020 | ||
NL | 08.04.2020 | ||
SE | 08.04.2020 | ||
NO | 08.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/47] | LT | 08.04.2020 | |
NO | 08.07.2020 | ||
IS | 08.08.2020 | ||
Former [2020/46] | IS | 08.08.2020 | Cited in | International search | [Y]US3903428 (DEJONG PIETER N) [Y] 1-13 * abstract * * column 1, line 63 - column 2, line 65 *; | [Y]JPS5721872 (HITACHI LTD) [Y] 1-13 * the whole document *; | [A]EP0969517 (IBM [US]) [A] 1-13* paragraphs [0040] - [0042]; figures 1,3 *; | [YD]CN102130194 (CHANGZHOU TRINA SOLAR ENERGY) [YD] 1-13 * abstract * * the whole document *; | [Y]CN103077977 (TIANJIN SAN AN OPTOELECTRONICS CO LTD) [Y] 1-13 * paragraphs [0016] - [0027]; figures 1-9 * | by applicant | CN102130194 |