EP3427536 - CLASSIFICATION OF USER EQUIPMENT USING EXTENDED SET OF RANDOM ACCESS PREAMBLES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.03.2022 Database last updated on 30.07.2024 | |
Former | The patent has been granted Status updated on 03.04.2021 | ||
Former | Grant of patent is intended Status updated on 16.02.2021 | ||
Former | Request for examination was made Status updated on 14.12.2018 | ||
Former | The international publication has been made Status updated on 15.09.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [2019/03] | Inventor(s) | 01 /
MAURITZ, Oskar Lidköpingsvägen 52 SE-121 39 Johanneshov / SE | [2019/03] | Representative(s) | Zacco Sweden AB P.O. Box 5581 Löjtnantsgatan 21 114 85 Stockholm / SE | [N/P] |
Former [2021/18] | Zacco Sweden AB Valhallavägen 117 Box 5581 114 85 Stockholm / SE | ||
Former [2019/03] | Haseltine Lake LLP Redcliff Quay 120 Redcliff Street Bristol BS1 6HU / GB | Application number, filing date | 16713128.3 | 11.03.2016 | [2019/03] | WO2016SE50195 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017155438 | Date: | 14.09.2017 | Language: | EN | [2017/37] | Type: | A1 Application with search report | No.: | EP3427536 | Date: | 16.01.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 14.09.2017 takes the place of the publication of the European patent application. | [2019/03] | Type: | B1 Patent specification | No.: | EP3427536 | Date: | 05.05.2021 | Language: | EN | [2021/18] | Search report(s) | International search report - published on: | EP | 14.09.2017 | Classification | IPC: | H04W74/08 | [2019/03] | CPC: |
H04W74/0833 (EP,US);
H04W74/02 (US);
H04J13/0062 (US);
H04W74/008 (US);
H04W74/085 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/03] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | KLASSIFIZIERUNG EINES BENUTZERGERÄTS MIT ERWEITERTEM SATZ VON DIREKTZUGRIFFSPRÄAMBELN | [2019/03] | English: | CLASSIFICATION OF USER EQUIPMENT USING EXTENDED SET OF RANDOM ACCESS PREAMBLES | [2019/03] | French: | CLASSIFICATION D'ÉQUIPEMENT UTILISATEUR À L'AIDE D'UN ENSEMBLE ÉTENDU DE PRÉAMBULES D'ACCÈS ALÉATOIRE | [2019/03] | Entry into regional phase | 06.09.2018 | National basic fee paid | 06.09.2018 | Designation fee(s) paid | 06.09.2018 | Examination fee paid | Examination procedure | 06.09.2018 | Examination requested [2019/03] | 06.09.2018 | Date on which the examining division has become responsible | 09.04.2019 | Amendment by applicant (claims and/or description) | 17.02.2021 | Communication of intention to grant the patent | 04.03.2021 | Fee for grant paid | 04.03.2021 | Fee for publishing/printing paid | 04.03.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 08.02.2022 | No opposition filed within time limit [2022/15] | Fees paid | Renewal fee | 17.09.2018 | Renewal fee patent year 03 | 27.03.2019 | Renewal fee patent year 04 | 27.03.2020 | Renewal fee patent year 05 | 29.03.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.03.2016 | AL | 05.05.2021 | AT | 05.05.2021 | CY | 05.05.2021 | CZ | 05.05.2021 | DK | 05.05.2021 | EE | 05.05.2021 | ES | 05.05.2021 | FI | 05.05.2021 | HR | 05.05.2021 | IT | 05.05.2021 | LT | 05.05.2021 | LV | 05.05.2021 | MC | 05.05.2021 | MK | 05.05.2021 | NL | 05.05.2021 | PL | 05.05.2021 | RO | 05.05.2021 | RS | 05.05.2021 | SE | 05.05.2021 | SI | 05.05.2021 | SK | 05.05.2021 | SM | 05.05.2021 | TR | 05.05.2021 | BG | 05.08.2021 | NO | 05.08.2021 | GR | 06.08.2021 | IS | 05.09.2021 | PT | 06.09.2021 | [2024/29] |
Former [2024/22] | HU | 11.03.2016 | |
AL | 05.05.2021 | ||
AT | 05.05.2021 | ||
CY | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
IT | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
MK | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2024/20] | HU | 11.03.2016 | |
AL | 05.05.2021 | ||
AT | 05.05.2021 | ||
CY | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
IT | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2024/18] | HU | 11.03.2016 | |
AL | 05.05.2021 | ||
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
IT | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/47] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
IT | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/36] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
IT | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/29] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/26] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/23] | AT | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/10] | AT | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
PT | 06.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/08] | AT | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/07] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/04] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2021/52] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
PL | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2021/51] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2021/50] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
PT | 06.09.2021 | ||
Former [2021/49] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
Former [2021/47] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
LT | 05.05.2021 | ||
BG | 05.08.2021 | ||
Former [2021/46] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
LT | 05.05.2021 | Cited in | International search | [Y]WO2014205723 (ERICSSON TELEFON AB L M [SE], et al) [Y] 10,11,19,20,25,26,31 * paragraph [0003] - paragraph [0004] *; | [Y]US2015078264 (HAN SEUNGHEE [US], et al) [Y] 3,14,21,27 * paragraph [0042] * * paragraph [0051] - paragraph [0052] * * paragraph [0054] *; | [XAYI]WO2015071025 (SONY CORP [JP], et al) [X] 1,2,12,13,22,28 * page 12, paragraph 4 - page 13, paragraph 1; figures 12,13 * * page 16, line 4 - page 17, line 1; claim 1 * [A] 8,9,17,18,23,24,29,30 [Y] 3,10,11,14,19-21,25-27,31 [I] 4-7,15,16; | [X] - YANG LIU ET AL, "A preamble allocation method for M2M traffics in 3GPP LTE-A networks", 2015 SEVENTH INTERNATIONAL WORKSHOP ON SIGNAL DESIGN AND ITS APPLICATIONS IN COMMUNICATIONS (IWSDA), IEEE, (20150914), doi:10.1109/IWSDA.2015.7458399, pages 180 - 185, XP032894160 [X] 1,2,12,13,22,28 * the whole document * DOI: http://dx.doi.org/10.1109/IWSDA.2015.7458399 |