blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3269001

EP3269001 - METHOD FOR OPERATING A THERMO-ELECTROCHEMICAL CONVERTER WITH INTEGRATED ENERGY STORAGE [Right-click to bookmark this link]
Former [2018/03]THERMO-ELECTROCHEMICAL CONVERTER WITH INTEGRATED ENERGY STORAGE
[2022/08]
StatusNo opposition filed within time limit
Status updated on  23.06.2023
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  15.07.2022
FormerGrant of patent is intended
Status updated on  02.03.2022
FormerExamination is in progress
Status updated on  29.04.2019
FormerRequest for examination was made
Status updated on  15.12.2017
FormerThe international publication has been made
Status updated on  06.09.2017
Most recent event   Tooltip24.05.2024Lapse of the patent in a contracting state
New state(s): IT
published on 26.06.2024  [2024/26]
Applicant(s)For all designated states
JTEC Energy, Inc.
263 Decatur Street
Atlanta, GA 30312 / US
[2022/30]
Former [2018/03]For all designated states
Johnson IP Holding, LLC
263 Decatur Street
Atlanta, GA 30312 / US
Inventor(s)01 / JOHNSON, Lonnie, G.
201 The Prado
Atlanta, GA 30309 / US
 [2018/03]
Representative(s)Staudt, Armin Walter
Sandeldamm 24a
63450 Hanau / DE
[2018/03]
Application number, filing date16713186.109.03.2016
[2018/03]
WO2016US21508
Priority number, dateUS201562130227P09.03.2015         Original published format: US 201562130227 P
US201562219977P17.09.2015         Original published format: US 201562219977 P
[2018/03]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2016145043
Date:15.09.2016
Language:EN
[2016/37]
Type: A1 Application with search report 
No.:EP3269001
Date:17.01.2018
Language:EN
The application published by WIPO in one of the EPO official languages on 15.09.2016 takes the place of the publication of the European patent application.
[2018/03]
Type: B1 Patent specification 
No.:EP3269001
Date:17.08.2022
Language:EN
[2022/33]
Search report(s)International search report - published on:EP15.09.2016
ClassificationIPC:H01M8/04014, H01M8/04089, H01M8/04082, F25B41/10, // F25B27/00, F25B9/14
[2022/08]
CPC:
H01M8/04014 (EP,CN,US); F25B41/10 (EP,CN,US); H01M14/005 (US);
H01M4/383 (US); H01M8/04089 (EP,CN,US); H01M8/04216 (EP,CN,US);
H01M8/18 (US); F25B27/00 (EP,CN,US); F25B9/14 (EP,US);
H01M2250/40 (EP,CN,US); Y02E60/10 (EP); Y02E60/50 (US) (-)
Former IPC [2018/03]H01M8/04014, F25B9/14, F25B27/00, F25B41/02, H01M8/04089, H01M8/04082
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/03]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:VERFAHREN ZUM BETRIEB EINES THERMOELEKTROCHEMISCHEM WANDLERS MIT INTEGRIERTEM ENERGIESPEICHER[2022/08]
English:METHOD FOR OPERATING A THERMO-ELECTROCHEMICAL CONVERTER WITH INTEGRATED ENERGY STORAGE[2022/08]
French:MÉTHODE D'OPÉRATION D'UN CONVERTISSEUR THERMO-ÉLECTROCHIMIQUE AVEC UN DISPOSITIF DE STOCKAGE D'ÉNERGIE INTÉGRÉ[2022/08]
Former [2018/03]THERMOELEKTROCHEMISCHER WANDLER MIT INTEGRIERTEM ENERGIESPEICHER
Former [2018/03]THERMO-ELECTROCHEMICAL CONVERTER WITH INTEGRATED ENERGY STORAGE
Former [2018/03]CONVERTISSEUR THERMO-ÉLECTROCHIMIQUE DOTÉ D'UN DISPOSITIF DE STOCKAGE D'ÉNERGIE INTÉGRÉ
Entry into regional phase02.10.2017National basic fee paid 
02.10.2017Designation fee(s) paid 
02.10.2017Examination fee paid 
Examination procedure02.10.2017Examination requested  [2018/03]
02.10.2017Date on which the examining division has become responsible
07.05.2018Amendment by applicant (claims and/or description)
03.05.2019Despatch of a communication from the examining division (Time limit: M06)
11.11.2019Reply to a communication from the examining division
14.04.2020Despatch of a communication from the examining division (Time limit: M06)
26.08.2020Reply to a communication from the examining division
03.03.2022Communication of intention to grant the patent
07.07.2022Fee for grant paid
07.07.2022Fee for publishing/printing paid
07.07.2022Receipt of the translation of the claim(s)
Divisional application(s)EP18174027.5  / EP3385644
EP19214382.4  / EP3653953
Opposition(s)19.05.2023No opposition filed within time limit [2023/30]
Fees paidRenewal fee
27.03.2018Renewal fee patent year 03
27.03.2019Renewal fee patent year 04
27.03.2020Renewal fee patent year 05
29.03.2021Renewal fee patent year 06
28.03.2022Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL17.08.2022
AT17.08.2022
CZ17.08.2022
EE17.08.2022
ES17.08.2022
FI17.08.2022
HR17.08.2022
IT17.08.2022
LT17.08.2022
LV17.08.2022
MC17.08.2022
NL17.08.2022
PL17.08.2022
RO17.08.2022
RS17.08.2022
SE17.08.2022
SI17.08.2022
SK17.08.2022
SM17.08.2022
NO17.11.2022
GR18.11.2022
IS17.12.2022
PT19.12.2022
IE09.03.2023
LU09.03.2023
BE31.03.2023
CH31.03.2023
LI31.03.2023
[2024/26]
Former [2024/12]AL17.08.2022
AT17.08.2022
CZ17.08.2022
EE17.08.2022
ES17.08.2022
FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
MC17.08.2022
NL17.08.2022
PL17.08.2022
RO17.08.2022
RS17.08.2022
SE17.08.2022
SI17.08.2022
SK17.08.2022
SM17.08.2022
NO17.11.2022
GR18.11.2022
IS17.12.2022
PT19.12.2022
IE09.03.2023
LU09.03.2023
BE31.03.2023
CH31.03.2023
LI31.03.2023
Former [2024/09]AL17.08.2022
AT17.08.2022
CZ17.08.2022
EE17.08.2022
ES17.08.2022
FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
MC17.08.2022
NL17.08.2022
PL17.08.2022
RO17.08.2022
RS17.08.2022
SE17.08.2022
SI17.08.2022
SK17.08.2022
SM17.08.2022
NO17.11.2022
GR18.11.2022
IS17.12.2022
PT19.12.2022
IE09.03.2023
LU09.03.2023
CH31.03.2023
LI31.03.2023
Former [2024/08]AL17.08.2022
AT17.08.2022
CZ17.08.2022
EE17.08.2022
ES17.08.2022
FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
MC17.08.2022
NL17.08.2022
PL17.08.2022
RO17.08.2022
RS17.08.2022
SE17.08.2022
SI17.08.2022
SK17.08.2022
SM17.08.2022
NO17.11.2022
GR18.11.2022
IS17.12.2022
PT19.12.2022
IE09.03.2023
LU09.03.2023
Former [2024/02]AL17.08.2022
AT17.08.2022
CZ17.08.2022
EE17.08.2022
ES17.08.2022
FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
MC17.08.2022
NL17.08.2022
PL17.08.2022
RO17.08.2022
RS17.08.2022
SE17.08.2022
SI17.08.2022
SK17.08.2022
SM17.08.2022
NO17.11.2022
GR18.11.2022
IS17.12.2022
PT19.12.2022
LU09.03.2023
Former [2023/48]AL17.08.2022
AT17.08.2022
CZ17.08.2022
EE17.08.2022
ES17.08.2022
FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
MC17.08.2022
NL17.08.2022
PL17.08.2022
RO17.08.2022
RS17.08.2022
SE17.08.2022
SI17.08.2022
SK17.08.2022
SM17.08.2022
NO17.11.2022
GR18.11.2022
IS17.12.2022
PT19.12.2022
Former [2023/37]AL17.08.2022
AT17.08.2022
CZ17.08.2022
EE17.08.2022
ES17.08.2022
FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
NL17.08.2022
PL17.08.2022
RO17.08.2022
RS17.08.2022
SE17.08.2022
SI17.08.2022
SK17.08.2022
SM17.08.2022
NO17.11.2022
GR18.11.2022
IS17.12.2022
PT19.12.2022
Former [2023/29]AL17.08.2022
AT17.08.2022
CZ17.08.2022
EE17.08.2022
ES17.08.2022
FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
NL17.08.2022
PL17.08.2022
RO17.08.2022
RS17.08.2022
SE17.08.2022
SK17.08.2022
SM17.08.2022
NO17.11.2022
GR18.11.2022
IS17.12.2022
PT19.12.2022
Former [2023/23]AT17.08.2022
CZ17.08.2022
EE17.08.2022
ES17.08.2022
FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
NL17.08.2022
PL17.08.2022
RO17.08.2022
RS17.08.2022
SE17.08.2022
SK17.08.2022
SM17.08.2022
NO17.11.2022
GR18.11.2022
IS17.12.2022
PT19.12.2022
Former [2023/22]AT17.08.2022
CZ17.08.2022
ES17.08.2022
FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
NL17.08.2022
PL17.08.2022
RO17.08.2022
RS17.08.2022
SE17.08.2022
SM17.08.2022
NO17.11.2022
GR18.11.2022
IS17.12.2022
PT19.12.2022
Former [2023/20]ES17.08.2022
FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
NL17.08.2022
PL17.08.2022
RS17.08.2022
SE17.08.2022
SM17.08.2022
NO17.11.2022
GR18.11.2022
IS17.12.2022
PT19.12.2022
Former [2023/12]ES17.08.2022
FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
NL17.08.2022
PL17.08.2022
RS17.08.2022
SE17.08.2022
NO17.11.2022
GR18.11.2022
IS17.12.2022
PT19.12.2022
Former [2023/11]ES17.08.2022
FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
NL17.08.2022
PL17.08.2022
RS17.08.2022
SE17.08.2022
NO17.11.2022
GR18.11.2022
PT19.12.2022
Former [2023/10]ES17.08.2022
FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
NL17.08.2022
RS17.08.2022
SE17.08.2022
NO17.11.2022
GR18.11.2022
PT19.12.2022
Former [2023/09]ES17.08.2022
FI17.08.2022
LT17.08.2022
LV17.08.2022
NL17.08.2022
RS17.08.2022
SE17.08.2022
NO17.11.2022
PT19.12.2022
Former [2023/08]ES17.08.2022
FI17.08.2022
LT17.08.2022
NL17.08.2022
RS17.08.2022
SE17.08.2022
NO17.11.2022
Cited inInternational search[X]US4677038  (SALOMON ROBERT E [US]) [X] 1,2 * column 2, line 41 - column 7, line 20; figure 1 *;
 [XI]US6949303  (JOHNSON LONNIE G [US], et al) [X] 1-3 * column 2, line 45 - column 5, line 52; figures 1,2 * * column 5, line 53 - column 7, line 12; figure 3 *[I] 4
ExaminationUS4292378
 US7943250
by applicantUS5208112
 US7160639
    - COLLECTION OF TECHNICAL PAPERS, (20000724), vol. 2
    - REPORT NUMBER(S)- AIAA PAPER, vol. 190, pages 1295 - 1299
    - CHUM, HELENA L.; OSTERYOUNG, ROBERT A., "Review of Thermally Regenerative Electrochemical Systems", SOLAR ENERGY RESEARCH INSTITUTE; U.S. DEPARTMENT OF ENERGY CONTRACT NO. EG-77 -C-01-4042, (198008), vol. 1, 2
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.