| EP3289624 - COMPOSITE POWDER FOR USE IN AN ANODE OF A LITHIUM ION BATTERY, METHOD FOR MANUFACTURING A COMPOSITE POWDER AND LITHIUM ION BATTERY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 16.07.2021 Database last updated on 18.03.2026 | |
| Former | The patent has been granted Status updated on 07.08.2020 | ||
| Former | Grant of patent is intended Status updated on 16.06.2020 | ||
| Former | Examination is in progress Status updated on 17.08.2018 | ||
| Former | Request for examination was made Status updated on 02.02.2018 | ||
| Former | The international publication has been made Status updated on 04.11.2016 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Umicore Rue du Marais 31 1000 Brussels / BE | [2018/10] | Inventor(s) | 01 /
PUT, Stijn Oosthamsesteenweg 73/2 2491 Olmen / BE | 02 /
VAN GENECHTEN, Dirk Paardendijk 30 3582 Koersel / BE | 03 /
MARX, Nicolas Bevrijdingslaan 15 3530 Houthalen / BE | [2018/12] |
| Former [2018/10] | 01 /
PUT, Stijn Oosthamsesteenweg 73/2 2491 Olmen / BE | ||
| 02 /
VAN GENECHTEN, Dirk Paardendijk 30 3582 Koersel / BE | |||
| 03 /
MARX, Nicolas Technische Schoolstraat 51 2440 Geel / BE | Representative(s) | Umicore RDI Patent Department Watertorenstraat 33 2250 Olen / BE | [2018/10] | Application number, filing date | 16718668.3 | 26.04.2016 | [2018/10] | WO2016EP59269 | Priority number, date | EP20150165429 | 28.04.2015 Original published format: EP 15165429 | [2018/10] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016174022 | Date: | 03.11.2016 | Language: | EN | [2016/44] | Type: | A1 Application with search report | No.: | EP3289624 | Date: | 07.03.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 03.11.2016 takes the place of the publication of the European patent application. | [2018/10] | Type: | B1 Patent specification | No.: | EP3289624 | Date: | 09.09.2020 | Language: | EN | [2020/37] | Search report(s) | International search report - published on: | EP | 03.11.2016 | Classification | IPC: | H01M4/36, H01M4/38, H01M4/583, H01M4/587, H01M10/052 | [2018/10] | CPC: |
H01M4/386 (EP,KR,US);
H01M4/364 (EP,KR,US);
C01B32/05 (EP,KR);
C01B32/956 (EP,KR);
C01B33/02 (EP,KR);
H01M10/052 (EP,KR,US);
H01M10/0525 (US);
H01M4/0471 (KR,US);
H01M4/583 (EP,KR,US);
H01M4/587 (EP,KR,US);
H01M4/625 (KR);
C01P2002/72 (EP,KR);
C01P2004/61 (EP);
C01P2004/80 (EP,KR);
H01M2004/027 (KR,US);
Y02E60/10 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/10] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERBUNDPULVER ZUR VERWENDUNG IN EINER ANODE EINER LITHIUM-IONEN-BATTERIE, VERFAHREN ZUR HERSTELLUNG EINES VERBUNDPULVERS UND LITHIUM-IONEN-BATTERIE | [2018/10] | English: | COMPOSITE POWDER FOR USE IN AN ANODE OF A LITHIUM ION BATTERY, METHOD FOR MANUFACTURING A COMPOSITE POWDER AND LITHIUM ION BATTERY | [2018/10] | French: | POUDRE COMPOSITE DESTINÉE À ÊTRE UTILISÉE DANS UNE ANODE D'UNE BATTERIE AU LITHIUM, PROCÉDÉ DE FABRICATION D'UNE POUDRE COMPOSITE ET BATTERIE LITHIUM-ION | [2020/26] |
| Former [2018/10] | POUDRE COMPOSITE DESTINÉE À ÊTRE UTILISÉE DANS UNE ANODE D'UNE BATTERIE AU LITHIUM-ION, PROCÉDÉ DE FABRICATION D'UNE POUDRE COMPOSITE ET BATTERIE AU LITHIUM-ION | Entry into regional phase | 28.11.2017 | National basic fee paid | 28.11.2017 | Designation fee(s) paid | 28.11.2017 | Examination fee paid | Examination procedure | 30.06.2016 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 31.10.2017 | Amendment by applicant (claims and/or description) | 31.10.2017 | Date on which the examining division has become responsible | 28.11.2017 | Examination requested [2018/10] | 16.08.2018 | Despatch of a communication from the examining division (Time limit: M06) | 14.02.2019 | Reply to a communication from the examining division | 27.11.2019 | Despatch of a communication from the examining division (Time limit: M04) | 12.03.2020 | Reply to a communication from the examining division | 17.06.2020 | Communication of intention to grant the patent | 28.07.2020 | Fee for grant paid | 28.07.2020 | Fee for publishing/printing paid | 28.07.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 10.06.2021 | No opposition filed within time limit [2021/33] | Fees paid | Renewal fee | 30.04.2018 | Renewal fee patent year 03 | 30.04.2019 | Renewal fee patent year 04 | 30.04.2020 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 09.09.2020 | AT | 09.09.2020 | CY | 09.09.2020 | CZ | 09.09.2020 | DK | 09.09.2020 | EE | 09.09.2020 | ES | 09.09.2020 | FI | 09.09.2020 | HR | 09.09.2020 | IT | 09.09.2020 | LT | 09.09.2020 | LV | 09.09.2020 | MC | 09.09.2020 | MK | 09.09.2020 | MT | 09.09.2020 | RO | 09.09.2020 | RS | 09.09.2020 | SI | 09.09.2020 | SK | 09.09.2020 | SM | 09.09.2020 | TR | 09.09.2020 | NL | 23.09.2020 | BG | 09.12.2020 | NO | 09.12.2020 | GR | 10.12.2020 | IS | 09.01.2021 | PT | 11.01.2021 | IE | 26.04.2021 | LU | 26.04.2021 | CH | 30.04.2021 | LI | 30.04.2021 | [2026/04] |
| Former [2024/41] | AL | 09.09.2020 | |
| AT | 09.09.2020 | ||
| CY | 09.09.2020 | ||
| CZ | 09.09.2020 | ||
| DK | 09.09.2020 | ||
| EE | 09.09.2020 | ||
| ES | 09.09.2020 | ||
| FI | 09.09.2020 | ||
| HR | 09.09.2020 | ||
| IT | 09.09.2020 | ||
| LT | 09.09.2020 | ||
| LV | 09.09.2020 | ||
| MC | 09.09.2020 | ||
| MK | 09.09.2020 | ||
| MT | 09.09.2020 | ||
| RO | 09.09.2020 | ||
| RS | 09.09.2020 | ||
| SI | 09.09.2020 | ||
| SK | 09.09.2020 | ||
| SM | 09.09.2020 | ||
| NL | 23.09.2020 | ||
| BG | 09.12.2020 | ||
| NO | 09.12.2020 | ||
| GR | 10.12.2020 | ||
| IS | 09.01.2021 | ||
| PT | 11.01.2021 | ||
| IE | 26.04.2021 | ||
| LU | 26.04.2021 | ||
| CH | 30.04.2021 | ||
| LI | 30.04.2021 | ||
| Former [2024/22] | AL | 09.09.2020 | |
| AT | 09.09.2020 | ||
| CY | 09.09.2020 | ||
| CZ | 09.09.2020 | ||
| DK | 09.09.2020 | ||
| EE | 09.09.2020 | ||
| ES | 09.09.2020 | ||
| FI | 09.09.2020 | ||
| HR | 09.09.2020 | ||
| IT | 09.09.2020 | ||
| LT | 09.09.2020 | ||
| LV | 09.09.2020 | ||
| MC | 09.09.2020 | ||
| MK | 09.09.2020 | ||
| RO | 09.09.2020 | ||
| RS | 09.09.2020 | ||
| SI | 09.09.2020 | ||
| SK | 09.09.2020 | ||
| SM | 09.09.2020 | ||
| NL | 23.09.2020 | ||
| BG | 09.12.2020 | ||
| NO | 09.12.2020 | ||
| GR | 10.12.2020 | ||
| IS | 09.01.2021 | ||
| PT | 11.01.2021 | ||
| IE | 26.04.2021 | ||
| LU | 26.04.2021 | ||
| CH | 30.04.2021 | ||
| LI | 30.04.2021 | ||
| Former [2023/30] | AL | 09.09.2020 | |
| AT | 09.09.2020 | ||
| CY | 09.09.2020 | ||
| CZ | 09.09.2020 | ||
| DK | 09.09.2020 | ||
| EE | 09.09.2020 | ||
| ES | 09.09.2020 | ||
| FI | 09.09.2020 | ||
| HR | 09.09.2020 | ||
| IT | 09.09.2020 | ||
| LT | 09.09.2020 | ||
| LV | 09.09.2020 | ||
| MC | 09.09.2020 | ||
| RO | 09.09.2020 | ||
| RS | 09.09.2020 | ||
| SI | 09.09.2020 | ||
| SK | 09.09.2020 | ||
| SM | 09.09.2020 | ||
| NL | 23.09.2020 | ||
| BG | 09.12.2020 | ||
| NO | 09.12.2020 | ||
| GR | 10.12.2020 | ||
| IS | 09.01.2021 | ||
| PT | 11.01.2021 | ||
| IE | 26.04.2021 | ||
| LU | 26.04.2021 | ||
| CH | 30.04.2021 | ||
| LI | 30.04.2021 | ||
| Former [2023/29] | AL | 09.09.2020 | |
| AT | 09.09.2020 | ||
| CZ | 09.09.2020 | ||
| DK | 09.09.2020 | ||
| EE | 09.09.2020 | ||
| ES | 09.09.2020 | ||
| FI | 09.09.2020 | ||
| HR | 09.09.2020 | ||
| IT | 09.09.2020 | ||
| LT | 09.09.2020 | ||
| LV | 09.09.2020 | ||
| MC | 09.09.2020 | ||
| RO | 09.09.2020 | ||
| RS | 09.09.2020 | ||
| SI | 09.09.2020 | ||
| SK | 09.09.2020 | ||
| SM | 09.09.2020 | ||
| NL | 23.09.2020 | ||
| BG | 09.12.2020 | ||
| NO | 09.12.2020 | ||
| GR | 10.12.2020 | ||
| IS | 09.01.2021 | ||
| PT | 11.01.2021 | ||
| IE | 26.04.2021 | ||
| LU | 26.04.2021 | ||
| CH | 30.04.2021 | ||
| LI | 30.04.2021 | ||
| Former [2022/23] | AL | 09.09.2020 | |
| AT | 09.09.2020 | ||
| CZ | 09.09.2020 | ||
| DK | 09.09.2020 | ||
| EE | 09.09.2020 | ||
| ES | 09.09.2020 | ||
| FI | 09.09.2020 | ||
| HR | 09.09.2020 | ||
| IT | 09.09.2020 | ||
| LT | 09.09.2020 | ||
| LV | 09.09.2020 | ||
| MC | 09.09.2020 | ||
| RO | 09.09.2020 | ||
| RS | 09.09.2020 | ||
| SI | 09.09.2020 | ||
| SK | 09.09.2020 | ||
| SM | 09.09.2020 | ||
| BG | 09.12.2020 | ||
| NO | 09.12.2020 | ||
| GR | 10.12.2020 | ||
| IS | 09.01.2021 | ||
| PT | 11.01.2021 | ||
| IE | 26.04.2021 | ||
| LU | 26.04.2021 | ||
| CH | 30.04.2021 | ||
| LI | 30.04.2021 | ||
| Former [2022/21] | AL | 09.09.2020 | |
| AT | 09.09.2020 | ||
| CZ | 09.09.2020 | ||
| DK | 09.09.2020 | ||
| EE | 09.09.2020 | ||
| ES | 09.09.2020 | ||
| FI | 09.09.2020 | ||
| HR | 09.09.2020 | ||
| IT | 09.09.2020 | ||
| LT | 09.09.2020 | ||
| LV | 09.09.2020 | ||
| MC | 09.09.2020 | ||
| RO | 09.09.2020 | ||
| RS | 09.09.2020 | ||
| SI | 09.09.2020 | ||
| SK | 09.09.2020 | ||
| SM | 09.09.2020 | ||
| BG | 09.12.2020 | ||
| NO | 09.12.2020 | ||
| GR | 10.12.2020 | ||
| PT | 11.01.2021 | ||
| IE | 26.04.2021 | ||
| LU | 26.04.2021 | ||
| CH | 30.04.2021 | ||
| LI | 30.04.2021 | ||
| Former [2022/10] | AL | 09.09.2020 | |
| AT | 09.09.2020 | ||
| CZ | 09.09.2020 | ||
| DK | 09.09.2020 | ||
| EE | 09.09.2020 | ||
| ES | 09.09.2020 | ||
| FI | 09.09.2020 | ||
| HR | 09.09.2020 | ||
| IT | 09.09.2020 | ||
| LT | 09.09.2020 | ||
| LV | 09.09.2020 | ||
| MC | 09.09.2020 | ||
| RO | 09.09.2020 | ||
| RS | 09.09.2020 | ||
| SI | 09.09.2020 | ||
| SK | 09.09.2020 | ||
| SM | 09.09.2020 | ||
| BG | 09.12.2020 | ||
| NO | 09.12.2020 | ||
| GR | 10.12.2020 | ||
| PT | 11.01.2021 | ||
| LU | 26.04.2021 | ||
| CH | 30.04.2021 | ||
| LI | 30.04.2021 | ||
| Former [2022/04] | AL | 09.09.2020 | |
| AT | 09.09.2020 | ||
| CZ | 09.09.2020 | ||
| DK | 09.09.2020 | ||
| EE | 09.09.2020 | ||
| ES | 09.09.2020 | ||
| FI | 09.09.2020 | ||
| HR | 09.09.2020 | ||
| IT | 09.09.2020 | ||
| LT | 09.09.2020 | ||
| LV | 09.09.2020 | ||
| MC | 09.09.2020 | ||
| RO | 09.09.2020 | ||
| RS | 09.09.2020 | ||
| SI | 09.09.2020 | ||
| SK | 09.09.2020 | ||
| SM | 09.09.2020 | ||
| BG | 09.12.2020 | ||
| NO | 09.12.2020 | ||
| GR | 10.12.2020 | ||
| IS | 09.01.2021 | ||
| PT | 11.01.2021 | ||
| LU | 26.04.2021 | ||
| Former [2021/50] | AL | 09.09.2020 | |
| AT | 09.09.2020 | ||
| CZ | 09.09.2020 | ||
| DK | 09.09.2020 | ||
| EE | 09.09.2020 | ||
| ES | 09.09.2020 | ||
| FI | 09.09.2020 | ||
| HR | 09.09.2020 | ||
| IT | 09.09.2020 | ||
| LT | 09.09.2020 | ||
| LV | 09.09.2020 | ||
| MC | 09.09.2020 | ||
| RO | 09.09.2020 | ||
| RS | 09.09.2020 | ||
| SI | 09.09.2020 | ||
| SK | 09.09.2020 | ||
| SM | 09.09.2020 | ||
| BG | 09.12.2020 | ||
| NO | 09.12.2020 | ||
| GR | 10.12.2020 | ||
| IS | 09.01.2021 | ||
| PT | 11.01.2021 | ||
| Former [2021/48] | AL | 09.09.2020 | |
| AT | 09.09.2020 | ||
| CZ | 09.09.2020 | ||
| DK | 09.09.2020 | ||
| EE | 09.09.2020 | ||
| ES | 09.09.2020 | ||
| FI | 09.09.2020 | ||
| HR | 09.09.2020 | ||
| IT | 09.09.2020 | ||
| LT | 09.09.2020 | ||
| LV | 09.09.2020 | ||
| RO | 09.09.2020 | ||
| RS | 09.09.2020 | ||
| SI | 09.09.2020 | ||
| SK | 09.09.2020 | ||
| SM | 09.09.2020 | ||
| BG | 09.12.2020 | ||
| NO | 09.12.2020 | ||
| GR | 10.12.2020 | ||
| IS | 09.01.2021 | ||
| PT | 11.01.2021 | ||
| Former [2021/37] | AL | 09.09.2020 | |
| AT | 09.09.2020 | ||
| CZ | 09.09.2020 | ||
| DK | 09.09.2020 | ||
| EE | 09.09.2020 | ||
| ES | 09.09.2020 | ||
| FI | 09.09.2020 | ||
| HR | 09.09.2020 | ||
| LT | 09.09.2020 | ||
| LV | 09.09.2020 | ||
| RO | 09.09.2020 | ||
| RS | 09.09.2020 | ||
| SI | 09.09.2020 | ||
| SK | 09.09.2020 | ||
| SM | 09.09.2020 | ||
| BG | 09.12.2020 | ||
| NO | 09.12.2020 | ||
| GR | 10.12.2020 | ||
| IS | 09.01.2021 | ||
| PT | 11.01.2021 | ||
| Former [2021/36] | AL | 09.09.2020 | |
| AT | 09.09.2020 | ||
| CZ | 09.09.2020 | ||
| EE | 09.09.2020 | ||
| ES | 09.09.2020 | ||
| FI | 09.09.2020 | ||
| HR | 09.09.2020 | ||
| LT | 09.09.2020 | ||
| LV | 09.09.2020 | ||
| RO | 09.09.2020 | ||
| RS | 09.09.2020 | ||
| SI | 09.09.2020 | ||
| SK | 09.09.2020 | ||
| SM | 09.09.2020 | ||
| BG | 09.12.2020 | ||
| NO | 09.12.2020 | ||
| GR | 10.12.2020 | ||
| IS | 09.01.2021 | ||
| PT | 11.01.2021 | ||
| Former [2021/28] | AL | 09.09.2020 | |
| AT | 09.09.2020 | ||
| CZ | 09.09.2020 | ||
| EE | 09.09.2020 | ||
| ES | 09.09.2020 | ||
| FI | 09.09.2020 | ||
| HR | 09.09.2020 | ||
| LT | 09.09.2020 | ||
| LV | 09.09.2020 | ||
| RO | 09.09.2020 | ||
| RS | 09.09.2020 | ||
| SK | 09.09.2020 | ||
| SM | 09.09.2020 | ||
| BG | 09.12.2020 | ||
| NO | 09.12.2020 | ||
| GR | 10.12.2020 | ||
| IS | 09.01.2021 | ||
| PT | 11.01.2021 | ||
| Former [2021/25] | AL | 09.09.2020 | |
| AT | 09.09.2020 | ||
| CZ | 09.09.2020 | ||
| EE | 09.09.2020 | ||
| ES | 09.09.2020 | ||
| FI | 09.09.2020 | ||
| HR | 09.09.2020 | ||
| LT | 09.09.2020 | ||
| LV | 09.09.2020 | ||
| RO | 09.09.2020 | ||
| RS | 09.09.2020 | ||
| SM | 09.09.2020 | ||
| BG | 09.12.2020 | ||
| NO | 09.12.2020 | ||
| GR | 10.12.2020 | ||
| IS | 09.01.2021 | ||
| PT | 11.01.2021 | ||
| Former [2021/23] | CZ | 09.09.2020 | |
| EE | 09.09.2020 | ||
| FI | 09.09.2020 | ||
| HR | 09.09.2020 | ||
| LT | 09.09.2020 | ||
| LV | 09.09.2020 | ||
| RO | 09.09.2020 | ||
| RS | 09.09.2020 | ||
| SM | 09.09.2020 | ||
| BG | 09.12.2020 | ||
| NO | 09.12.2020 | ||
| GR | 10.12.2020 | ||
| PT | 11.01.2021 | ||
| Former [2021/22] | CZ | 09.09.2020 | |
| EE | 09.09.2020 | ||
| FI | 09.09.2020 | ||
| HR | 09.09.2020 | ||
| LT | 09.09.2020 | ||
| LV | 09.09.2020 | ||
| RO | 09.09.2020 | ||
| RS | 09.09.2020 | ||
| BG | 09.12.2020 | ||
| NO | 09.12.2020 | ||
| GR | 10.12.2020 | ||
| PT | 11.01.2021 | ||
| Former [2021/21] | FI | 09.09.2020 | |
| HR | 09.09.2020 | ||
| LT | 09.09.2020 | ||
| LV | 09.09.2020 | ||
| RS | 09.09.2020 | ||
| BG | 09.12.2020 | ||
| NO | 09.12.2020 | ||
| GR | 10.12.2020 | ||
| PT | 11.01.2021 | ||
| Former [2021/10] | FI | 09.09.2020 | |
| HR | 09.09.2020 | ||
| LT | 09.09.2020 | ||
| LV | 09.09.2020 | ||
| RS | 09.09.2020 | ||
| BG | 09.12.2020 | ||
| NO | 09.12.2020 | ||
| GR | 10.12.2020 | ||
| Former [2021/08] | FI | 09.09.2020 | |
| LT | 09.09.2020 | ||
| BG | 09.12.2020 | ||
| NO | 09.12.2020 | ||
| Former [2021/07] | FI | 09.09.2020 | |
| LT | 09.09.2020 | ||
| NO | 09.12.2020 | Cited in | International search | [XI] JP5348878 | Examination | JP5348878 | DATTA M K ET AL: "Silicon and carbon based composite anodes for lithium ion batteries", JOURNAL OF POWER SOURCES, ELSEVIER SA, CH, vol. 158, no. 1, 14 July 2006 (2006-07-14), pages 557 - 563, XP027938983, ISSN: 0378-7753, [retrieved on 20060714] [X] 8,11,12 * 2.1 Materials synthesis 3. Results and discussion;; figure 1 *[A] 1-7 [I] 9,10 | by applicant | P.SCHERRER, GOTTINGER NACHRICHTEN, vol. 2, 1918, pages 98 | "A Malvern 2000 equipment", 2000, MALVERN INSTRUMENTS GMBH |