EP3289176 - METHOD AND SYSTEM FOR DEPLOYING AN ELECTRICAL LOAD DEVICE IN A WELLBORE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.03.2020 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 19.04.2019 | ||
Former | Grant of patent is intended Status updated on 12.02.2019 | ||
Former | Examination is in progress Status updated on 31.08.2018 | ||
Former | Request for examination was made Status updated on 02.02.2018 | ||
Former | The international publication has been made Status updated on 11.11.2016 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Zilift Holdings Limited 17-19 Greenrole Trading Estate Howe Moss Drive, Dyce Aberdeen Aberdeenshire AB21 0GL / GB | [2018/10] | Inventor(s) | 01 /
MACLEAN, Iain 11 Braemar Place Aberdeen AB10 6EN / GB | 02 /
SEARS, Kenneth North Lodge Grandhome Aberdeen AB22 8AR / GB | 03 /
COUTTS, Edwin Milton Cottage Amy Row Cowie Stonehaven AB39 2RP / GB | [2018/10] | Representative(s) | Docherty, Andrew John Marks & Clerk LLP The Beacon 176 St Vincent Street Glasgow G2 5SG / GB | [N/P] |
Former [2018/10] | Docherty, Andrew John Marks & Clerk LLP Aurora 120 Bothwell Street Glasgow G2 7JS / GB | Application number, filing date | 16720499.9 | 27.04.2016 | [2018/10] | WO2016GB51189 | Priority number, date | US201514701567 | 01.05.2015 Original published format: US201514701567 | [2018/10] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016177996 | Date: | 10.11.2016 | Language: | EN | [2016/45] | Type: | A1 Application with search report | No.: | EP3289176 | Date: | 07.03.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 10.11.2016 takes the place of the publication of the European patent application. | [2018/10] | Type: | B1 Patent specification | No.: | EP3289176 | Date: | 22.05.2019 | Language: | EN | [2019/21] | Search report(s) | International search report - published on: | EP | 10.11.2016 | Classification | IPC: | E21B43/12, E21B19/22 | [2018/10] | CPC: |
E21B19/22 (EP,US);
E21B17/003 (RU,US);
E21B43/128 (EP,RU,US);
E21B47/12 (RU);
H01B7/20 (RU)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/10] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN UND SYSTEM ZUM EINSETZEN EINER ELEKTRISCHEN LASTVORRICHTUNG IN EINEM BOHRLOCH | [2018/10] | English: | METHOD AND SYSTEM FOR DEPLOYING AN ELECTRICAL LOAD DEVICE IN A WELLBORE | [2018/10] | French: | PROCÉDÉ ET SYSTÈME POUR DÉPLOYER UN DISPOSITIF DE CHARGE ÉLECTRIQUE DANS UN PUITS DE FORAGE | [2018/10] | Entry into regional phase | 27.10.2017 | National basic fee paid | 27.10.2017 | Designation fee(s) paid | 27.10.2017 | Examination fee paid | Examination procedure | 27.10.2017 | Examination requested [2018/10] | 27.10.2017 | Date on which the examining division has become responsible | 18.06.2018 | Amendment by applicant (claims and/or description) | 03.09.2018 | Despatch of a communication from the examining division (Time limit: M04) | 14.01.2019 | Reply to a communication from the examining division | 13.02.2019 | Communication of intention to grant the patent | 26.03.2019 | Fee for grant paid | 26.03.2019 | Fee for publishing/printing paid | 26.03.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 25.02.2020 | No opposition filed within time limit [2020/18] | Fees paid | Renewal fee | 11.04.2018 | Renewal fee patent year 03 | 15.04.2019 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.04.2016 | AL | 22.05.2019 | AT | 22.05.2019 | CY | 22.05.2019 | CZ | 22.05.2019 | DK | 22.05.2019 | EE | 22.05.2019 | ES | 22.05.2019 | FI | 22.05.2019 | HR | 22.05.2019 | IT | 22.05.2019 | LT | 22.05.2019 | LV | 22.05.2019 | MC | 22.05.2019 | MK | 22.05.2019 | MT | 22.05.2019 | NL | 22.05.2019 | PL | 22.05.2019 | RO | 22.05.2019 | RS | 22.05.2019 | SE | 22.05.2019 | SI | 22.05.2019 | SK | 22.05.2019 | SM | 22.05.2019 | TR | 22.05.2019 | BG | 22.08.2019 | NO | 22.08.2019 | GR | 23.08.2019 | IS | 22.09.2019 | PT | 22.09.2019 | [2022/31] |
Former [2022/30] | HU | 27.04.2016 | |
AL | 22.05.2019 | ||
AT | 22.05.2019 | ||
CY | 22.05.2019 | ||
CZ | 22.05.2019 | ||
DK | 22.05.2019 | ||
EE | 22.05.2019 | ||
ES | 22.05.2019 | ||
FI | 22.05.2019 | ||
HR | 22.05.2019 | ||
IT | 22.05.2019 | ||
LT | 22.05.2019 | ||
LV | 22.05.2019 | ||
MC | 22.05.2019 | ||
MT | 22.05.2019 | ||
NL | 22.05.2019 | ||
PL | 22.05.2019 | ||
RO | 22.05.2019 | ||
RS | 22.05.2019 | ||
SE | 22.05.2019 | ||
SI | 22.05.2019 | ||
SK | 22.05.2019 | ||
SM | 22.05.2019 | ||
TR | 22.05.2019 | ||
BG | 22.08.2019 | ||
NO | 22.08.2019 | ||
GR | 23.08.2019 | ||
IS | 22.09.2019 | ||
PT | 22.09.2019 | ||
Former [2022/28] | HU | 27.04.2016 | |
AL | 22.05.2019 | ||
AT | 22.05.2019 | ||
CY | 22.05.2019 | ||
CZ | 22.05.2019 | ||
DK | 22.05.2019 | ||
EE | 22.05.2019 | ||
ES | 22.05.2019 | ||
FI | 22.05.2019 | ||
HR | 22.05.2019 | ||
IT | 22.05.2019 | ||
LT | 22.05.2019 | ||
LV | 22.05.2019 | ||
MC | 22.05.2019 | ||
MT | 22.05.2019 | ||
NL | 22.05.2019 | ||
PL | 22.05.2019 | ||
RO | 22.05.2019 | ||
RS | 22.05.2019 | ||
SE | 22.05.2019 | ||
SI | 22.05.2019 | ||
SK | 22.05.2019 | ||
SM | 22.05.2019 | ||
TR | 22.05.2019 | ||
BG | 22.08.2019 | ||
NO | 22.08.2019 | ||
GR | 23.08.2019 | ||
PT | 22.09.2019 | ||
Former [2020/52] | AL | 22.05.2019 | |
AT | 22.05.2019 | ||
CZ | 22.05.2019 | ||
DK | 22.05.2019 | ||
EE | 22.05.2019 | ||
ES | 22.05.2019 | ||
FI | 22.05.2019 | ||
HR | 22.05.2019 | ||
IT | 22.05.2019 | ||
LT | 22.05.2019 | ||
LV | 22.05.2019 | ||
MC | 22.05.2019 | ||
NL | 22.05.2019 | ||
PL | 22.05.2019 | ||
RO | 22.05.2019 | ||
RS | 22.05.2019 | ||
SE | 22.05.2019 | ||
SI | 22.05.2019 | ||
SK | 22.05.2019 | ||
SM | 22.05.2019 | ||
TR | 22.05.2019 | ||
BG | 22.08.2019 | ||
NO | 22.08.2019 | ||
GR | 23.08.2019 | ||
PT | 22.09.2019 | ||
Former [2020/25] | AL | 22.05.2019 | |
AT | 22.05.2019 | ||
CZ | 22.05.2019 | ||
DK | 22.05.2019 | ||
EE | 22.05.2019 | ||
ES | 22.05.2019 | ||
FI | 22.05.2019 | ||
HR | 22.05.2019 | ||
IT | 22.05.2019 | ||
LT | 22.05.2019 | ||
LV | 22.05.2019 | ||
NL | 22.05.2019 | ||
PL | 22.05.2019 | ||
RO | 22.05.2019 | ||
RS | 22.05.2019 | ||
SE | 22.05.2019 | ||
SI | 22.05.2019 | ||
SK | 22.05.2019 | ||
SM | 22.05.2019 | ||
TR | 22.05.2019 | ||
BG | 22.08.2019 | ||
NO | 22.08.2019 | ||
GR | 23.08.2019 | ||
PT | 22.09.2019 | ||
Former [2020/17] | AL | 22.05.2019 | |
AT | 22.05.2019 | ||
CZ | 22.05.2019 | ||
DK | 22.05.2019 | ||
EE | 22.05.2019 | ||
ES | 22.05.2019 | ||
FI | 22.05.2019 | ||
HR | 22.05.2019 | ||
IT | 22.05.2019 | ||
LT | 22.05.2019 | ||
LV | 22.05.2019 | ||
NL | 22.05.2019 | ||
RO | 22.05.2019 | ||
RS | 22.05.2019 | ||
SE | 22.05.2019 | ||
SK | 22.05.2019 | ||
SM | 22.05.2019 | ||
TR | 22.05.2019 | ||
BG | 22.08.2019 | ||
NO | 22.08.2019 | ||
GR | 23.08.2019 | ||
PT | 22.09.2019 | ||
Former [2020/14] | AL | 22.05.2019 | |
AT | 22.05.2019 | ||
CZ | 22.05.2019 | ||
DK | 22.05.2019 | ||
EE | 22.05.2019 | ||
ES | 22.05.2019 | ||
FI | 22.05.2019 | ||
HR | 22.05.2019 | ||
IT | 22.05.2019 | ||
LT | 22.05.2019 | ||
LV | 22.05.2019 | ||
NL | 22.05.2019 | ||
RO | 22.05.2019 | ||
RS | 22.05.2019 | ||
SE | 22.05.2019 | ||
SK | 22.05.2019 | ||
SM | 22.05.2019 | ||
BG | 22.08.2019 | ||
NO | 22.08.2019 | ||
GR | 23.08.2019 | ||
PT | 22.09.2019 | ||
Former [2020/12] | AL | 22.05.2019 | |
AT | 22.05.2019 | ||
CZ | 22.05.2019 | ||
DK | 22.05.2019 | ||
EE | 22.05.2019 | ||
ES | 22.05.2019 | ||
FI | 22.05.2019 | ||
HR | 22.05.2019 | ||
IT | 22.05.2019 | ||
LT | 22.05.2019 | ||
LV | 22.05.2019 | ||
NL | 22.05.2019 | ||
RO | 22.05.2019 | ||
RS | 22.05.2019 | ||
SE | 22.05.2019 | ||
SK | 22.05.2019 | ||
BG | 22.08.2019 | ||
NO | 22.08.2019 | ||
GR | 23.08.2019 | ||
PT | 22.09.2019 | ||
Former [2020/11] | AL | 22.05.2019 | |
AT | 22.05.2019 | ||
CZ | 22.05.2019 | ||
DK | 22.05.2019 | ||
EE | 22.05.2019 | ||
ES | 22.05.2019 | ||
FI | 22.05.2019 | ||
HR | 22.05.2019 | ||
LT | 22.05.2019 | ||
LV | 22.05.2019 | ||
NL | 22.05.2019 | ||
RO | 22.05.2019 | ||
RS | 22.05.2019 | ||
SE | 22.05.2019 | ||
SK | 22.05.2019 | ||
BG | 22.08.2019 | ||
NO | 22.08.2019 | ||
GR | 23.08.2019 | ||
PT | 22.09.2019 | ||
Former [2020/10] | AL | 22.05.2019 | |
AT | 22.05.2019 | ||
CZ | 22.05.2019 | ||
DK | 22.05.2019 | ||
ES | 22.05.2019 | ||
FI | 22.05.2019 | ||
HR | 22.05.2019 | ||
LT | 22.05.2019 | ||
LV | 22.05.2019 | ||
NL | 22.05.2019 | ||
RO | 22.05.2019 | ||
RS | 22.05.2019 | ||
SE | 22.05.2019 | ||
BG | 22.08.2019 | ||
NO | 22.08.2019 | ||
GR | 23.08.2019 | ||
PT | 22.09.2019 | ||
Former [2020/09] | AL | 22.05.2019 | |
CZ | 22.05.2019 | ||
DK | 22.05.2019 | ||
ES | 22.05.2019 | ||
FI | 22.05.2019 | ||
HR | 22.05.2019 | ||
LT | 22.05.2019 | ||
LV | 22.05.2019 | ||
NL | 22.05.2019 | ||
RS | 22.05.2019 | ||
SE | 22.05.2019 | ||
BG | 22.08.2019 | ||
NO | 22.08.2019 | ||
GR | 23.08.2019 | ||
PT | 22.09.2019 | ||
Former [2019/51] | AL | 22.05.2019 | |
ES | 22.05.2019 | ||
FI | 22.05.2019 | ||
HR | 22.05.2019 | ||
LT | 22.05.2019 | ||
LV | 22.05.2019 | ||
NL | 22.05.2019 | ||
RS | 22.05.2019 | ||
SE | 22.05.2019 | ||
BG | 22.08.2019 | ||
NO | 22.08.2019 | ||
GR | 23.08.2019 | ||
PT | 22.09.2019 | ||
Former [2019/50] | AL | 22.05.2019 | |
ES | 22.05.2019 | ||
FI | 22.05.2019 | ||
HR | 22.05.2019 | ||
LT | 22.05.2019 | ||
LV | 22.05.2019 | ||
NL | 22.05.2019 | ||
RS | 22.05.2019 | ||
SE | 22.05.2019 | ||
NO | 22.08.2019 | ||
GR | 23.08.2019 | ||
PT | 22.09.2019 | ||
Former [2019/49] | AL | 22.05.2019 | |
ES | 22.05.2019 | ||
FI | 22.05.2019 | ||
HR | 22.05.2019 | ||
LT | 22.05.2019 | ||
NL | 22.05.2019 | ||
SE | 22.05.2019 | ||
NO | 22.08.2019 | ||
PT | 22.09.2019 | ||
Former [2019/48] | ES | 22.05.2019 | |
FI | 22.05.2019 | ||
LT | 22.05.2019 | ||
SE | 22.05.2019 | ||
NO | 22.08.2019 | ||
PT | 22.09.2019 | ||
Former [2019/47] | ES | 22.05.2019 | |
FI | 22.05.2019 | ||
LT | 22.05.2019 | ||
NO | 22.08.2019 | Cited in | International search | [A]GB2326536 (BAKER HUGHES INC [US]) [A] 1-31 * figures 1-4 *; | [Y]US6192983 (NEUROTH DAVID H [US], et al) [Y] 1-31 * figures 1-4 *; | [A]US2012292051 (WETZEL JAMES RUDOLPH [US], et al) [A] 1-31 * paragraph [0027] - paragraph [0028]; figure 3 *; | [A]CN203594386U (BEIJING BOTENEAR PETROLEUM TECHNOLOGY CO LTD) [A] 1-31* abstract *; | [A]US2014132192 (HERNANDEZ MARTI RAMON [US], et al) [A] 1-31 * paragraphs [0022] , [0 33] , [0 34]; figures 1-4 *; | [YD]US2014190706 (VARKEY JOSEPH [US], et al) [YD] 1-31 * paragraph [0022] - paragraph [0023]; figure 1 * | by applicant | US4928771 | US5086196 | US5285008 | US5414217 | US2013214928 | US2014190706 | - "Recommended Practice for Specifying Electric Submersible Pump Cable - Ethylene-Propylene Rubber Insulation", IEEE Standard 1018-2013, IEEE |