EP3344849 - HIGH TEMPERATURE INSULATION SYSTEM AND METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.09.2022 Database last updated on 06.11.2024 | |
Former | The patent has been granted Status updated on 22.10.2021 | ||
Former | Grant of patent is intended Status updated on 06.07.2021 | ||
Former | Examination is in progress Status updated on 08.11.2019 | ||
Former | Request for examination was made Status updated on 08.06.2018 | ||
Former | The international publication has been made Status updated on 11.03.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states FMC Technologies, Inc. 5875 North Sam Houston Parkway West Houston, TX 77086 / US | [2018/28] | Inventor(s) | 01 /
WHITSITT, Elizabeth 5875 North Sam Houston Parkway West Houston, TX 77086 / US | 02 /
SILVA-HERNANDEZ, Carlos, Ardenis 5875 North Sam Houston Parkway West Houston, TX 77086 / US | 03 /
HERST, Matthew, R. 5875 North Sam Houston Parkway West Houston, TX 77086 / US | 04 /
JONES, Warren, P. 5875 North Sam Houston Parkway West Houston, TX 77086 / US | 05 /
WABNITZ, Frank 5875 North Sam Houston Parkway West Houston, TX 77086 / US | [2018/28] | Representative(s) | McGeough, Gemma Ann Withers & Rogers LLP 2 London Bridge London SE1 9RA / GB | [2021/47] |
Former [2018/28] | McGeough, Gemma Ann Withers & Rogers LLP 4 More London Riverside London SE1 2 AU / GB | Application number, filing date | 16722492.2 | 04.05.2016 | [2018/28] | WO2016US30633 | Priority number, date | US201514844550 | 03.09.2015 Original published format: US201514844550 | [2018/28] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017039763 | Date: | 09.03.2017 | Language: | EN | [2017/10] | Type: | A1 Application with search report | No.: | EP3344849 | Date: | 11.07.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 09.03.2017 takes the place of the publication of the European patent application. | [2018/28] | Type: | B1 Patent specification | No.: | EP3344849 | Date: | 24.11.2021 | Language: | EN | [2021/47] | Search report(s) | International search report - published on: | EP | 09.03.2017 | Classification | IPC: | E21B36/00, F16L59/16, E21B43/01 | [2018/28] | CPC: |
E21B36/003 (EP,US);
E21B41/0007 (US);
E21B43/01 (EP,US);
G06F1/00 (US);
F16L59/166 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/28] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | HOCHTEMPERATURISOLATIONSSYSTEM UND -VERFAHREN | [2018/28] | English: | HIGH TEMPERATURE INSULATION SYSTEM AND METHOD | [2018/28] | French: | SYSTÈME ET PROCÉDÉ D'ISOLATION À HAUTE TEMPÉRATURE | [2018/28] | Entry into regional phase | 29.03.2018 | National basic fee paid | 29.03.2018 | Designation fee(s) paid | 29.03.2018 | Examination fee paid | Examination procedure | 29.03.2018 | Examination requested [2018/28] | 29.03.2018 | Date on which the examining division has become responsible | 11.10.2018 | Amendment by applicant (claims and/or description) | 13.11.2019 | Despatch of a communication from the examining division (Time limit: M04) | 23.03.2020 | Reply to a communication from the examining division | 13.01.2021 | Despatch of a communication from the examining division (Time limit: M04) | 13.05.2021 | Reply to a communication from the examining division | 07.07.2021 | Communication of intention to grant the patent | 13.10.2021 | Fee for grant paid | 13.10.2021 | Fee for publishing/printing paid | 13.10.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 25.08.2022 | No opposition filed within time limit [2022/44] | Fees paid | Renewal fee | 29.03.2018 | Renewal fee patent year 03 | 15.05.2019 | Renewal fee patent year 04 | 31.03.2020 | Renewal fee patent year 05 | 13.05.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 04.05.2016 | AL | 24.11.2021 | AT | 24.11.2021 | CY | 24.11.2021 | CZ | 24.11.2021 | DK | 24.11.2021 | EE | 24.11.2021 | ES | 24.11.2021 | FI | 24.11.2021 | HR | 24.11.2021 | LT | 24.11.2021 | LV | 24.11.2021 | MC | 24.11.2021 | MK | 24.11.2021 | MT | 24.11.2021 | NL | 24.11.2021 | PL | 24.11.2021 | RO | 24.11.2021 | RS | 24.11.2021 | SE | 24.11.2021 | SI | 24.11.2021 | SK | 24.11.2021 | SM | 24.11.2021 | BG | 24.02.2022 | GR | 25.02.2022 | IS | 24.03.2022 | PT | 24.03.2022 | IE | 04.05.2022 | LU | 04.05.2022 | BE | 31.05.2022 | CH | 31.05.2022 | LI | 31.05.2022 | [2024/42] |
Former [2024/22] | HU | 04.05.2016 | |
AL | 24.11.2021 | ||
AT | 24.11.2021 | ||
CY | 24.11.2021 | ||
CZ | 24.11.2021 | ||
DK | 24.11.2021 | ||
EE | 24.11.2021 | ||
ES | 24.11.2021 | ||
FI | 24.11.2021 | ||
HR | 24.11.2021 | ||
LT | 24.11.2021 | ||
LV | 24.11.2021 | ||
MC | 24.11.2021 | ||
MK | 24.11.2021 | ||
NL | 24.11.2021 | ||
PL | 24.11.2021 | ||
RO | 24.11.2021 | ||
RS | 24.11.2021 | ||
SE | 24.11.2021 | ||
SI | 24.11.2021 | ||
SK | 24.11.2021 | ||
SM | 24.11.2021 | ||
BG | 24.02.2022 | ||
GR | 25.02.2022 | ||
IS | 24.03.2022 | ||
PT | 24.03.2022 | ||
IE | 04.05.2022 | ||
LU | 04.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2024/20] | HU | 04.05.2016 | |
AL | 24.11.2021 | ||
AT | 24.11.2021 | ||
CY | 24.11.2021 | ||
CZ | 24.11.2021 | ||
DK | 24.11.2021 | ||
EE | 24.11.2021 | ||
ES | 24.11.2021 | ||
FI | 24.11.2021 | ||
HR | 24.11.2021 | ||
LT | 24.11.2021 | ||
LV | 24.11.2021 | ||
MC | 24.11.2021 | ||
NL | 24.11.2021 | ||
PL | 24.11.2021 | ||
RO | 24.11.2021 | ||
RS | 24.11.2021 | ||
SE | 24.11.2021 | ||
SI | 24.11.2021 | ||
SK | 24.11.2021 | ||
SM | 24.11.2021 | ||
BG | 24.02.2022 | ||
GR | 25.02.2022 | ||
IS | 24.03.2022 | ||
PT | 24.03.2022 | ||
IE | 04.05.2022 | ||
LU | 04.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2024/18] | HU | 04.05.2016 | |
AL | 24.11.2021 | ||
AT | 24.11.2021 | ||
CZ | 24.11.2021 | ||
DK | 24.11.2021 | ||
EE | 24.11.2021 | ||
ES | 24.11.2021 | ||
FI | 24.11.2021 | ||
HR | 24.11.2021 | ||
LT | 24.11.2021 | ||
LV | 24.11.2021 | ||
MC | 24.11.2021 | ||
NL | 24.11.2021 | ||
PL | 24.11.2021 | ||
RO | 24.11.2021 | ||
RS | 24.11.2021 | ||
SE | 24.11.2021 | ||
SI | 24.11.2021 | ||
SK | 24.11.2021 | ||
SM | 24.11.2021 | ||
BG | 24.02.2022 | ||
GR | 25.02.2022 | ||
IS | 24.03.2022 | ||
PT | 24.03.2022 | ||
IE | 04.05.2022 | ||
LU | 04.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2023/25] | AL | 24.11.2021 | |
AT | 24.11.2021 | ||
CZ | 24.11.2021 | ||
DK | 24.11.2021 | ||
EE | 24.11.2021 | ||
ES | 24.11.2021 | ||
FI | 24.11.2021 | ||
HR | 24.11.2021 | ||
LT | 24.11.2021 | ||
LV | 24.11.2021 | ||
MC | 24.11.2021 | ||
NL | 24.11.2021 | ||
PL | 24.11.2021 | ||
RO | 24.11.2021 | ||
RS | 24.11.2021 | ||
SE | 24.11.2021 | ||
SI | 24.11.2021 | ||
SK | 24.11.2021 | ||
SM | 24.11.2021 | ||
BG | 24.02.2022 | ||
GR | 25.02.2022 | ||
IS | 24.03.2022 | ||
PT | 24.03.2022 | ||
IE | 04.05.2022 | ||
LU | 04.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2023/20] | AL | 24.11.2021 | |
AT | 24.11.2021 | ||
CZ | 24.11.2021 | ||
DK | 24.11.2021 | ||
EE | 24.11.2021 | ||
ES | 24.11.2021 | ||
FI | 24.11.2021 | ||
HR | 24.11.2021 | ||
LT | 24.11.2021 | ||
LV | 24.11.2021 | ||
MC | 24.11.2021 | ||
NL | 24.11.2021 | ||
PL | 24.11.2021 | ||
RO | 24.11.2021 | ||
RS | 24.11.2021 | ||
SE | 24.11.2021 | ||
SI | 24.11.2021 | ||
SK | 24.11.2021 | ||
SM | 24.11.2021 | ||
BG | 24.02.2022 | ||
GR | 25.02.2022 | ||
IS | 24.03.2022 | ||
PT | 24.03.2022 | ||
IE | 04.05.2022 | ||
LU | 04.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2023/09] | AL | 24.11.2021 | |
AT | 24.11.2021 | ||
CZ | 24.11.2021 | ||
DK | 24.11.2021 | ||
EE | 24.11.2021 | ||
ES | 24.11.2021 | ||
FI | 24.11.2021 | ||
HR | 24.11.2021 | ||
LT | 24.11.2021 | ||
LV | 24.11.2021 | ||
MC | 24.11.2021 | ||
NL | 24.11.2021 | ||
PL | 24.11.2021 | ||
RO | 24.11.2021 | ||
RS | 24.11.2021 | ||
SE | 24.11.2021 | ||
SI | 24.11.2021 | ||
SK | 24.11.2021 | ||
SM | 24.11.2021 | ||
BG | 24.02.2022 | ||
GR | 25.02.2022 | ||
IS | 24.03.2022 | ||
PT | 24.03.2022 | ||
LU | 04.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2023/08] | AL | 24.11.2021 | |
AT | 24.11.2021 | ||
CZ | 24.11.2021 | ||
DK | 24.11.2021 | ||
EE | 24.11.2021 | ||
ES | 24.11.2021 | ||
FI | 24.11.2021 | ||
HR | 24.11.2021 | ||
LT | 24.11.2021 | ||
LV | 24.11.2021 | ||
MC | 24.11.2021 | ||
NL | 24.11.2021 | ||
PL | 24.11.2021 | ||
RO | 24.11.2021 | ||
RS | 24.11.2021 | ||
SE | 24.11.2021 | ||
SI | 24.11.2021 | ||
SK | 24.11.2021 | ||
SM | 24.11.2021 | ||
BG | 24.02.2022 | ||
GR | 25.02.2022 | ||
IS | 24.03.2022 | ||
PT | 24.03.2022 | ||
LU | 04.05.2022 | ||
Former [2023/06] | AL | 24.11.2021 | |
AT | 24.11.2021 | ||
CZ | 24.11.2021 | ||
DK | 24.11.2021 | ||
EE | 24.11.2021 | ||
ES | 24.11.2021 | ||
FI | 24.11.2021 | ||
HR | 24.11.2021 | ||
LT | 24.11.2021 | ||
LV | 24.11.2021 | ||
MC | 24.11.2021 | ||
NL | 24.11.2021 | ||
PL | 24.11.2021 | ||
RO | 24.11.2021 | ||
RS | 24.11.2021 | ||
SE | 24.11.2021 | ||
SI | 24.11.2021 | ||
SK | 24.11.2021 | ||
SM | 24.11.2021 | ||
BG | 24.02.2022 | ||
GR | 25.02.2022 | ||
IS | 24.03.2022 | ||
PT | 24.03.2022 | ||
Former [2023/01] | AL | 24.11.2021 | |
AT | 24.11.2021 | ||
CZ | 24.11.2021 | ||
DK | 24.11.2021 | ||
EE | 24.11.2021 | ||
ES | 24.11.2021 | ||
FI | 24.11.2021 | ||
HR | 24.11.2021 | ||
LT | 24.11.2021 | ||
LV | 24.11.2021 | ||
NL | 24.11.2021 | ||
PL | 24.11.2021 | ||
RO | 24.11.2021 | ||
RS | 24.11.2021 | ||
SE | 24.11.2021 | ||
SI | 24.11.2021 | ||
SK | 24.11.2021 | ||
SM | 24.11.2021 | ||
BG | 24.02.2022 | ||
GR | 25.02.2022 | ||
IS | 24.03.2022 | ||
PT | 24.03.2022 | ||
Former [2022/49] | AL | 24.11.2021 | |
AT | 24.11.2021 | ||
CZ | 24.11.2021 | ||
DK | 24.11.2021 | ||
EE | 24.11.2021 | ||
ES | 24.11.2021 | ||
FI | 24.11.2021 | ||
HR | 24.11.2021 | ||
LT | 24.11.2021 | ||
LV | 24.11.2021 | ||
NL | 24.11.2021 | ||
PL | 24.11.2021 | ||
RO | 24.11.2021 | ||
RS | 24.11.2021 | ||
SE | 24.11.2021 | ||
SK | 24.11.2021 | ||
SM | 24.11.2021 | ||
BG | 24.02.2022 | ||
GR | 25.02.2022 | ||
IS | 24.03.2022 | ||
PT | 24.03.2022 | ||
Former [2022/35] | AT | 24.11.2021 | |
CZ | 24.11.2021 | ||
DK | 24.11.2021 | ||
EE | 24.11.2021 | ||
ES | 24.11.2021 | ||
FI | 24.11.2021 | ||
HR | 24.11.2021 | ||
LT | 24.11.2021 | ||
LV | 24.11.2021 | ||
NL | 24.11.2021 | ||
PL | 24.11.2021 | ||
RO | 24.11.2021 | ||
RS | 24.11.2021 | ||
SE | 24.11.2021 | ||
SK | 24.11.2021 | ||
SM | 24.11.2021 | ||
BG | 24.02.2022 | ||
GR | 25.02.2022 | ||
IS | 24.03.2022 | ||
PT | 24.03.2022 | ||
Former [2022/34] | AT | 24.11.2021 | |
EE | 24.11.2021 | ||
ES | 24.11.2021 | ||
FI | 24.11.2021 | ||
HR | 24.11.2021 | ||
LT | 24.11.2021 | ||
LV | 24.11.2021 | ||
NL | 24.11.2021 | ||
PL | 24.11.2021 | ||
RO | 24.11.2021 | ||
RS | 24.11.2021 | ||
SE | 24.11.2021 | ||
SM | 24.11.2021 | ||
BG | 24.02.2022 | ||
GR | 25.02.2022 | ||
IS | 24.03.2022 | ||
PT | 24.03.2022 | ||
Former [2022/33] | AT | 24.11.2021 | |
ES | 24.11.2021 | ||
FI | 24.11.2021 | ||
HR | 24.11.2021 | ||
LT | 24.11.2021 | ||
LV | 24.11.2021 | ||
NL | 24.11.2021 | ||
PL | 24.11.2021 | ||
RS | 24.11.2021 | ||
SE | 24.11.2021 | ||
SM | 24.11.2021 | ||
BG | 24.02.2022 | ||
GR | 25.02.2022 | ||
IS | 24.03.2022 | ||
PT | 24.03.2022 | ||
Former [2022/24] | AT | 24.11.2021 | |
ES | 24.11.2021 | ||
FI | 24.11.2021 | ||
HR | 24.11.2021 | ||
LT | 24.11.2021 | ||
LV | 24.11.2021 | ||
NL | 24.11.2021 | ||
PL | 24.11.2021 | ||
RS | 24.11.2021 | ||
SE | 24.11.2021 | ||
BG | 24.02.2022 | ||
GR | 25.02.2022 | ||
IS | 24.03.2022 | ||
PT | 24.03.2022 | ||
Former [2022/23] | AT | 24.11.2021 | |
ES | 24.11.2021 | ||
FI | 24.11.2021 | ||
HR | 24.11.2021 | ||
LT | 24.11.2021 | ||
LV | 24.11.2021 | ||
PL | 24.11.2021 | ||
RS | 24.11.2021 | ||
BG | 24.02.2022 | ||
PT | 24.03.2022 | ||
Former [2022/22] | AT | 24.11.2021 | |
FI | 24.11.2021 | ||
LT | 24.11.2021 | ||
RS | 24.11.2021 | ||
BG | 24.02.2022 | ||
Former [2022/21] | AT | 24.11.2021 | |
RS | 24.11.2021 | ||
BG | 24.02.2022 | ||
Former [2022/19] | BG | 24.02.2022 | Cited in | International search | [XYI]EP0104788 (BABCOCK & WILCOX CO [US]) [X] 10,15 * page 3, line 1 - line 25 * * page 5, line 26 - page 6, line 16 * * figure 1; claims 1,4 * [Y] 11,14 [I] 12,13; | [IY]US6026861 (MENTZER H TIMOTHY [US], et al) [I] 16-19 * column 1, line 12 - line 56 * [Y] 14,20; | [A]DE202004008767U (SAINT GOBAIN ISOVER G & H AG [DE]) [A] 1-20 * paragraph [0007] * * paragraph [0015] - paragraph [0016]; figure - *; | [YA]US2010276127 (BARNES VAUGHN V [US]) [Y] 11,20 * paragraph [0009] * * paragraph [0020] - paragraph [0027] * * abstract * [A] 1-9; | [A] - ALBERTO RIVAS-CARDONA ET AL, "Experimental and Analytical Investigation of the Cool-Down Behavior of an Insulated Pipe Assembly Under Subsea Conditions", SPE JOURNAL, US, (20120601), vol. 17, no. 02, doi:10.2118/149692-PA, ISSN 1086-055X, pages 602 - 616, XP055290737 [A] 1-9 * the whole document * DOI: http://dx.doi.org/10.2118/149692-PA |