EP3240230 - METHOD AND APPARATUS FOR MULTICAST FORWARDING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.06.2021 Database last updated on 15.07.2024 | |
Former | The patent has been granted Status updated on 26.06.2020 | ||
Former | Grant of patent is intended Status updated on 29.03.2020 | ||
Former | Examination is in progress Status updated on 04.01.2019 | ||
Former | Request for examination was made Status updated on 29.09.2017 | ||
Former | The international publication has been made Status updated on 28.07.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2017/44] | Inventor(s) | 01 /
XU, Xiaohu Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | [2017/44] | Representative(s) | Epping - Hermann - Fischer Patentanwaltsgesellschaft mbH Schloßschmidstraße 5 80639 München / DE | [2017/44] | Application number, filing date | 16739734.8 | 11.01.2016 | [2017/44] | WO2016CN70586 | Priority number, date | CN20151029231 | 20.01.2015 Original published format: CN201510029231 | [2017/44] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016115987 | Date: | 28.07.2016 | Language: | ZH | [2016/30] | Type: | A1 Application with search report | No.: | EP3240230 | Date: | 01.11.2017 | Language: | EN | [2017/44] | Type: | B1 Patent specification | No.: | EP3240230 | Date: | 29.07.2020 | Language: | EN | [2020/31] | Search report(s) | International search report - published on: | CN | 28.07.2016 | (Supplementary) European search report - dispatched on: | EP | 08.02.2018 | Classification | IPC: | H04L12/18, H04L12/741, // H04L12/46, H04L12/761 | [2020/17] | CPC: |
H04L12/18 (EP,US);
H04L12/185 (US);
H04L12/1886 (EP,US);
H04L45/745 (EP,US);
H04L12/4641 (EP,US);
H04L45/16 (EP,US)
|
Former IPC [2018/11] | H04L12/18, H04L12/741, // H04L12/46 | ||
Former IPC [2017/44] | H04L12/18 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/44] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR MULTICAST-WEITERLEITUNG | [2017/44] | English: | METHOD AND APPARATUS FOR MULTICAST FORWARDING | [2017/44] | French: | PROCÉDÉ ET APPAREIL DE TRANSMISSION À DIFFUSION SÉLECTIVE | [2017/44] | Entry into regional phase | 27.07.2017 | Translation filed | 27.07.2017 | National basic fee paid | 27.07.2017 | Search fee paid | 27.07.2017 | Designation fee(s) paid | 27.07.2017 | Examination fee paid | Examination procedure | 27.07.2017 | Examination requested [2017/44] | 27.07.2017 | Date on which the examining division has become responsible | 14.08.2018 | Amendment by applicant (claims and/or description) | 07.01.2019 | Despatch of a communication from the examining division (Time limit: M04) | 09.05.2019 | Reply to a communication from the examining division | 15.07.2019 | Despatch of a communication from the examining division (Time limit: M04) | 22.11.2019 | Reply to a communication from the examining division | 30.03.2020 | Communication of intention to grant the patent | 18.06.2020 | Receipt of the translation of the claim(s) | 19.06.2020 | Fee for grant paid | 19.06.2020 | Fee for publishing/printing paid | Opposition(s) | 30.04.2021 | No opposition filed within time limit [2021/27] | Fees paid | Renewal fee | 19.01.2018 | Renewal fee patent year 03 | 22.01.2019 | Renewal fee patent year 04 | 24.01.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.01.2016 | AL | 29.07.2020 | AT | 29.07.2020 | CY | 29.07.2020 | CZ | 29.07.2020 | DK | 29.07.2020 | EE | 29.07.2020 | ES | 29.07.2020 | FI | 29.07.2020 | HR | 29.07.2020 | IT | 29.07.2020 | LT | 29.07.2020 | LV | 29.07.2020 | MC | 29.07.2020 | MK | 29.07.2020 | NL | 29.07.2020 | PL | 29.07.2020 | RO | 29.07.2020 | RS | 29.07.2020 | SE | 29.07.2020 | SI | 29.07.2020 | SK | 29.07.2020 | SM | 29.07.2020 | TR | 29.07.2020 | BG | 29.10.2020 | NO | 29.10.2020 | GR | 30.10.2020 | IS | 29.11.2020 | PT | 30.11.2020 | GB | 11.01.2021 | IE | 11.01.2021 | LU | 11.01.2021 | BE | 31.01.2021 | CH | 31.01.2021 | LI | 31.01.2021 | [2024/29] |
Former [2024/22] | HU | 11.01.2016 | |
AL | 29.07.2020 | ||
AT | 29.07.2020 | ||
CY | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
MK | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
GB | 11.01.2021 | ||
IE | 11.01.2021 | ||
LU | 11.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2023/30] | HU | 11.01.2016 | |
AL | 29.07.2020 | ||
AT | 29.07.2020 | ||
CY | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
GB | 11.01.2021 | ||
IE | 11.01.2021 | ||
LU | 11.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2023/27] | HU | 11.01.2016 | |
AL | 29.07.2020 | ||
AT | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
GB | 11.01.2021 | ||
IE | 11.01.2021 | ||
LU | 11.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2022/34] | AL | 29.07.2020 | |
AT | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
GB | 11.01.2021 | ||
IE | 11.01.2021 | ||
LU | 11.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2022/23] | AL | 29.07.2020 | |
AT | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
GB | 11.01.2021 | ||
IE | 11.01.2021 | ||
LU | 11.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2022/10] | AL | 29.07.2020 | |
AT | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
PT | 30.11.2020 | ||
GB | 11.01.2021 | ||
IE | 11.01.2021 | ||
LU | 11.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2022/07] | AL | 29.07.2020 | |
AT | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
GB | 11.01.2021 | ||
IE | 11.01.2021 | ||
LU | 11.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2021/52] | AL | 29.07.2020 | |
AT | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
GB | 11.01.2021 | ||
LU | 11.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2021/49] | AL | 29.07.2020 | |
AT | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
GB | 11.01.2021 | ||
LU | 11.01.2021 | ||
Former [2021/43] | AL | 29.07.2020 | |
AT | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
LU | 11.01.2021 | ||
Former [2021/40] | AL | 29.07.2020 | |
AT | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/36] | AL | 29.07.2020 | |
AT | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/28] | AL | 29.07.2020 | |
AT | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/25] | AL | 29.07.2020 | |
AT | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/22] | AT | 29.07.2020 | |
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/20] | AT | 29.07.2020 | |
DK | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/17] | AT | 29.07.2020 | |
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/10] | AT | 29.07.2020 | |
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
PL | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/09] | AT | 29.07.2020 | |
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
LT | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
PT | 30.11.2020 | ||
Former [2021/08] | ES | 29.07.2020 | |
FI | 29.07.2020 | ||
LT | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
PT | 30.11.2020 | ||
Former [2021/07] | FI | 29.07.2020 | |
LT | 29.07.2020 | ||
NO | 29.10.2020 | Documents cited: | Search | [XP]US2015131659 (WIJNANDS IJSBRAND [BE], et al) [XP] 1-15 * the whole document *; | [XP]US2015139228 (WIJNANDS IJSBRAND [BE], et al) [XP] 1-15* the whole document *; | [I] - IJ WIJNANDS ET AL, "Multicast using Bit Index Explicit Replication; draft-wijnands-bier-architecture-02.txt", MULTICAST USING BIT INDEX EXPLICIT REPLICATION; DRAFT-WIJNANDS-BIER-ARCHITECTURE-02.TXT, INTERNET ENGINEERING TASK FORCE, IETF; STANDARDWORKINGDRAFT, INTERNET SOCIETY (ISOC) 4, RUE DES FALAISES CH- 1205 GENEVA, SWITZERLAND, (20141204), pages 1 - 27, XP015103440 [I] 1-15 * page 3, paragraph 1. Introduction - page 20, paragraph 6.6.2. Example 2 * | [A] - ROSEN E ET AL, "Multicast in MPLS/BGP IP VPNs; rfc6513.txt", MULTICAST IN MPLS/BGP IP VPNS; RFC6513.TXT, INTERNET ENGINEERING TASK FORCE, IETF; STANDARD, INTERNET SOCIETY (ISOC) 4, RUE DES FALAISES CH- 1205 GENEVA, SWITZERLAND, (20120220), pages 1 - 88, XP015081439 [A] 1-15 * page 5, paragraph 1. Introduction - page 12, paragraphs 2.6. PE-PE Multicast Data Transmission * * page 68, paragraph 10.1.1. Initial Configuration - page 69, paragraph 10.1.2.2. Source within a Site * | [A] - AGGARWAL JUNIPER NETWORKS E ROSEN CISCO SYSTEMS R ET AL, "BGP Encodings and Procedures for Multicast in MPLS/BGP IP VPNs; rfc6514.txt", BGP ENCODINGS AND PROCEDURES FOR MULTICAST IN MPLS/BGP IP VPNS; RFC6514.TXT, INTERNET ENGINEERING TASK FORCE, IETF; STANDARD, INTERNET SOCIETY (ISOC) 4, RUE DES FALAISES CH- 1205 GENEVA, SWITZERLAND, (20120220), pages 1 - 59, XP015081440 [A] 1-15 * page 14, paragraph 7. VRF Route Import Extended Community - page 15, paragraph 7.VRF Route Import Extended Community * | International search | [A]US2003185209 (LEE WHAY CHIOU [US]) [A] 1-36* , see the whole document *; | [A]CN101232392 (ZTE CORP [CN]) [A] 1-36 * , see the whole document *; | [A]CN101394342 (HUAWEI TECH CO LTD [CN]) [A] 1-36 * , see the whole document *; | [A]CN101605103 (HANGZHOU HUASAN COMM TECH CO [CN]) [A] 1-36 * , see description, page 6, paragraph 6 to page 8, paragraph 2, and figure 1 * |