EP3253516 - INFILTRATED FERROUS MATERIALS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 29.07.2022 Database last updated on 19.07.2024 | |
Former | The patent has been granted Status updated on 20.08.2021 | ||
Former | Grant of patent is intended Status updated on 08.10.2020 | ||
Former | Examination is in progress Status updated on 17.08.2018 | ||
Former | Request for examination was made Status updated on 10.11.2017 | ||
Former | The international publication has been made Status updated on 01.09.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states MacLean-Fogg Company 1000 Allanson Road Mundelein, IL 60060 / US | [2022/22] |
Former [2017/50] | For all designated states The Nanosteel Company, Inc. 272 West Exchange Street, Suite 300 Providence, RI 02903 / US | Inventor(s) | 01 /
TUFFILE, Charles D. 188 Cummings Road Swansea, MA 02777 / US | 02 /
LEMKE, Harald 1 Ackerly Terrace Northport, New York 11768 / US | 03 /
MACK, Patrick E. 53 Emmons Street Milford, Massachusetts 01757 / US | [2018/17] |
Former [2017/50] | 01 /
TUFFILE, Charles D. 260 Cameron Drive Dighton, Massachusetts 02715 / US | ||
02 /
LEMKE, Harald 1 Ackerly Terrace Northport, New York 11768 / US | |||
03 /
MACK, Patrick E. 53 Emmons Street Milford, Massachusetts 01757 / US | Representative(s) | Richly & Ritschel Patentanwälte PartG mbB Sattlerweg 20 51429 Bergisch Gladbach / DE | [2021/38] |
Former [2017/50] | Kierdorf Ritschel Richly Patentanwälte PartG mbB Sattlerweg 20 51429 Bergisch Gladbach / DE | Application number, filing date | 16747184.6 | 03.02.2016 | [2017/50] | WO2016US16356 | Priority number, date | US201562111395P | 03.02.2015 Original published format: US 201562111395 P | [2017/50] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016126814 | Date: | 11.08.2016 | Language: | EN | [2016/32] | Type: | A1 Application with search report | No.: | EP3253516 | Date: | 13.12.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 11.08.2016 takes the place of the publication of the European patent application. | [2017/50] | Type: | B1 Patent specification | No.: | EP3253516 | Date: | 22.09.2021 | Language: | EN | [2021/38] | Search report(s) | International search report - published on: | US | 11.08.2016 | (Supplementary) European search report - dispatched on: | EP | 07.08.2018 | Classification | IPC: | B22F7/02, B33Y10/00, C22C38/22, B22F3/00, B22F3/26, B33Y40/00, C22C38/38, C22C38/36, C22C38/34, C22C38/32, C22C38/04, C22C38/02, C22C33/02 | [2018/36] | CPC: |
B22F3/26 (EP,KR,US);
B33Y10/00 (EP,KR,US);
B22F1/10 (EP,KR);
B22F10/10 (US);
B22F10/14 (EP,KR,US);
B33Y70/00 (KR);
C22C33/0285 (EP,US);
C22C38/02 (EP,US);
C22C38/04 (EP,US);
C22C38/22 (EP,KR,US);
C22C38/32 (EP,KR,US);
C22C38/34 (EP,KR,US);
C22C38/36 (EP,KR,US);
C22C38/38 (EP,KR,US);
B22F2998/10 (EP,KR,US);
| C-Set: |
B22F2998/10, B22F1/10, B22F10/10, B22F3/1021, B22F3/1109, B22F3/26 (KR,EP,US)
|
Former IPC [2017/50] | B22F7/02, B33Y10/00, C22C38/22 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/50] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | INFILTRIERTE EISENMATERIALIEN | [2017/50] | English: | INFILTRATED FERROUS MATERIALS | [2017/50] | French: | MATÉRIAUX FERREUX INFILTRÉS | [2017/50] | Entry into regional phase | 25.08.2017 | National basic fee paid | 25.08.2017 | Search fee paid | 25.08.2017 | Designation fee(s) paid | 25.08.2017 | Examination fee paid | Examination procedure | 25.08.2017 | Examination requested [2017/50] | 25.08.2017 | Date on which the examining division has become responsible | 19.03.2018 | Amendment by applicant (claims and/or description) | 17.08.2018 | Despatch of a communication from the examining division (Time limit: M04) | 21.12.2018 | Reply to a communication from the examining division | 25.03.2019 | Despatch of a communication from the examining division (Time limit: M04) | 01.08.2019 | Reply to a communication from the examining division | 22.10.2019 | Despatch of a communication from the examining division (Time limit: M06) | 04.05.2020 | Reply to a communication from the examining division | 09.10.2020 | Communication of intention to grant the patent | 12.03.2021 | Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time | 25.05.2021 | Fee for grant paid | 25.05.2021 | Fee for publishing/printing paid | 25.05.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 23.06.2022 | No opposition filed within time limit [2022/35] | Request for further processing for: | The application is deemed to be withdrawn due to failure to fulfill actions required for granting the patent | 25.05.2021 | Request for further processing filed | 25.05.2021 | Full payment received (date of receipt of payment) Request granted | 08.06.2021 | Decision despatched | Fees paid | Renewal fee | 27.02.2018 | Renewal fee patent year 03 | 27.02.2019 | Renewal fee patent year 04 | 27.02.2020 | Renewal fee patent year 05 | 25.05.2021 | Renewal fee patent year 06 | Penalty fee | Additional fee for renewal fee | 28.02.2021 | 06   M06   Fee paid on   25.05.2021 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.02.2016 | AL | 22.09.2021 | AT | 22.09.2021 | CY | 22.09.2021 | CZ | 22.09.2021 | DK | 22.09.2021 | EE | 22.09.2021 | FI | 22.09.2021 | HR | 22.09.2021 | LT | 22.09.2021 | LV | 22.09.2021 | MC | 22.09.2021 | MK | 22.09.2021 | NL | 22.09.2021 | PL | 22.09.2021 | RO | 22.09.2021 | RS | 22.09.2021 | SE | 22.09.2021 | SI | 22.09.2021 | SK | 22.09.2021 | SM | 22.09.2021 | BG | 22.12.2021 | GR | 23.12.2021 | IS | 22.01.2022 | PT | 24.01.2022 | IE | 03.02.2022 | LU | 03.02.2022 | BE | 28.02.2022 | CH | 28.02.2022 | LI | 28.02.2022 | [2024/22] |
Former [2024/21] | HU | 03.02.2016 | |
AL | 22.09.2021 | ||
AT | 22.09.2021 | ||
CY | 22.09.2021 | ||
CZ | 22.09.2021 | ||
DK | 22.09.2021 | ||
EE | 22.09.2021 | ||
FI | 22.09.2021 | ||
HR | 22.09.2021 | ||
LT | 22.09.2021 | ||
LV | 22.09.2021 | ||
MC | 22.09.2021 | ||
NL | 22.09.2021 | ||
PL | 22.09.2021 | ||
RO | 22.09.2021 | ||
RS | 22.09.2021 | ||
SE | 22.09.2021 | ||
SI | 22.09.2021 | ||
SK | 22.09.2021 | ||
SM | 22.09.2021 | ||
BG | 22.12.2021 | ||
GR | 23.12.2021 | ||
IS | 22.01.2022 | ||
PT | 24.01.2022 | ||
IE | 03.02.2022 | ||
LU | 03.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2024/20] | HU | 03.02.2016 | |
AL | 22.09.2021 | ||
AT | 22.09.2021 | ||
CY | 22.09.2021 | ||
CZ | 22.09.2021 | ||
DK | 22.09.2021 | ||
EE | 22.09.2021 | ||
FI | 22.09.2021 | ||
HR | 22.09.2021 | ||
LT | 22.09.2021 | ||
LV | 22.09.2021 | ||
MC | 22.09.2021 | ||
NL | 22.09.2021 | ||
PL | 22.09.2021 | ||
RO | 22.09.2021 | ||
RS | 22.09.2021 | ||
SE | 22.09.2021 | ||
SI | 22.09.2021 | ||
SK | 22.09.2021 | ||
BG | 22.12.2021 | ||
GR | 23.12.2021 | ||
IS | 22.01.2022 | ||
PT | 24.01.2022 | ||
IE | 03.02.2022 | ||
LU | 03.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2024/18] | HU | 03.02.2016 | |
AL | 22.09.2021 | ||
AT | 22.09.2021 | ||
CZ | 22.09.2021 | ||
DK | 22.09.2021 | ||
EE | 22.09.2021 | ||
FI | 22.09.2021 | ||
HR | 22.09.2021 | ||
LT | 22.09.2021 | ||
LV | 22.09.2021 | ||
MC | 22.09.2021 | ||
NL | 22.09.2021 | ||
PL | 22.09.2021 | ||
RO | 22.09.2021 | ||
RS | 22.09.2021 | ||
SE | 22.09.2021 | ||
SI | 22.09.2021 | ||
SK | 22.09.2021 | ||
BG | 22.12.2021 | ||
GR | 23.12.2021 | ||
IS | 22.01.2022 | ||
PT | 24.01.2022 | ||
IE | 03.02.2022 | ||
LU | 03.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2023/10] | AL | 22.09.2021 | |
AT | 22.09.2021 | ||
CZ | 22.09.2021 | ||
DK | 22.09.2021 | ||
EE | 22.09.2021 | ||
FI | 22.09.2021 | ||
HR | 22.09.2021 | ||
LT | 22.09.2021 | ||
LV | 22.09.2021 | ||
MC | 22.09.2021 | ||
NL | 22.09.2021 | ||
PL | 22.09.2021 | ||
RO | 22.09.2021 | ||
RS | 22.09.2021 | ||
SE | 22.09.2021 | ||
SI | 22.09.2021 | ||
SK | 22.09.2021 | ||
BG | 22.12.2021 | ||
GR | 23.12.2021 | ||
IS | 22.01.2022 | ||
PT | 24.01.2022 | ||
IE | 03.02.2022 | ||
LU | 03.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2023/09] | AL | 22.09.2021 | |
AT | 22.09.2021 | ||
CZ | 22.09.2021 | ||
DK | 22.09.2021 | ||
EE | 22.09.2021 | ||
FI | 22.09.2021 | ||
HR | 22.09.2021 | ||
LT | 22.09.2021 | ||
LV | 22.09.2021 | ||
MC | 22.09.2021 | ||
NL | 22.09.2021 | ||
PL | 22.09.2021 | ||
RO | 22.09.2021 | ||
RS | 22.09.2021 | ||
SE | 22.09.2021 | ||
SI | 22.09.2021 | ||
SK | 22.09.2021 | ||
BG | 22.12.2021 | ||
GR | 23.12.2021 | ||
IS | 22.01.2022 | ||
PT | 24.01.2022 | ||
IE | 03.02.2022 | ||
LU | 03.02.2022 | ||
CH | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2023/01] | AL | 22.09.2021 | |
AT | 22.09.2021 | ||
CZ | 22.09.2021 | ||
DK | 22.09.2021 | ||
EE | 22.09.2021 | ||
FI | 22.09.2021 | ||
HR | 22.09.2021 | ||
LT | 22.09.2021 | ||
LV | 22.09.2021 | ||
MC | 22.09.2021 | ||
NL | 22.09.2021 | ||
PL | 22.09.2021 | ||
RO | 22.09.2021 | ||
RS | 22.09.2021 | ||
SE | 22.09.2021 | ||
SI | 22.09.2021 | ||
SK | 22.09.2021 | ||
BG | 22.12.2021 | ||
GR | 23.12.2021 | ||
IS | 22.01.2022 | ||
PT | 24.01.2022 | ||
LU | 03.02.2022 | ||
Former [2022/47] | AL | 22.09.2021 | |
AT | 22.09.2021 | ||
CZ | 22.09.2021 | ||
DK | 22.09.2021 | ||
EE | 22.09.2021 | ||
FI | 22.09.2021 | ||
HR | 22.09.2021 | ||
LT | 22.09.2021 | ||
LV | 22.09.2021 | ||
MC | 22.09.2021 | ||
NL | 22.09.2021 | ||
PL | 22.09.2021 | ||
RO | 22.09.2021 | ||
RS | 22.09.2021 | ||
SE | 22.09.2021 | ||
SK | 22.09.2021 | ||
BG | 22.12.2021 | ||
GR | 23.12.2021 | ||
IS | 22.01.2022 | ||
PT | 24.01.2022 | ||
LU | 03.02.2022 | ||
Former [2022/44] | AL | 22.09.2021 | |
AT | 22.09.2021 | ||
CZ | 22.09.2021 | ||
DK | 22.09.2021 | ||
EE | 22.09.2021 | ||
FI | 22.09.2021 | ||
HR | 22.09.2021 | ||
LT | 22.09.2021 | ||
LV | 22.09.2021 | ||
MC | 22.09.2021 | ||
NL | 22.09.2021 | ||
PL | 22.09.2021 | ||
RO | 22.09.2021 | ||
RS | 22.09.2021 | ||
SE | 22.09.2021 | ||
SK | 22.09.2021 | ||
BG | 22.12.2021 | ||
GR | 23.12.2021 | ||
IS | 22.01.2022 | ||
PT | 24.01.2022 | ||
Former [2022/36] | AL | 22.09.2021 | |
AT | 22.09.2021 | ||
CZ | 22.09.2021 | ||
DK | 22.09.2021 | ||
EE | 22.09.2021 | ||
FI | 22.09.2021 | ||
HR | 22.09.2021 | ||
LT | 22.09.2021 | ||
LV | 22.09.2021 | ||
NL | 22.09.2021 | ||
PL | 22.09.2021 | ||
RO | 22.09.2021 | ||
RS | 22.09.2021 | ||
SE | 22.09.2021 | ||
SK | 22.09.2021 | ||
BG | 22.12.2021 | ||
GR | 23.12.2021 | ||
IS | 22.01.2022 | ||
PT | 24.01.2022 | ||
Former [2022/29] | AL | 22.09.2021 | |
AT | 22.09.2021 | ||
CZ | 22.09.2021 | ||
EE | 22.09.2021 | ||
FI | 22.09.2021 | ||
HR | 22.09.2021 | ||
LT | 22.09.2021 | ||
LV | 22.09.2021 | ||
NL | 22.09.2021 | ||
PL | 22.09.2021 | ||
RO | 22.09.2021 | ||
RS | 22.09.2021 | ||
SE | 22.09.2021 | ||
SK | 22.09.2021 | ||
BG | 22.12.2021 | ||
GR | 23.12.2021 | ||
IS | 22.01.2022 | ||
PT | 24.01.2022 | ||
Former [2022/24] | AT | 22.09.2021 | |
CZ | 22.09.2021 | ||
EE | 22.09.2021 | ||
FI | 22.09.2021 | ||
HR | 22.09.2021 | ||
LT | 22.09.2021 | ||
LV | 22.09.2021 | ||
NL | 22.09.2021 | ||
PL | 22.09.2021 | ||
RO | 22.09.2021 | ||
RS | 22.09.2021 | ||
SE | 22.09.2021 | ||
SK | 22.09.2021 | ||
BG | 22.12.2021 | ||
GR | 23.12.2021 | ||
IS | 22.01.2022 | ||
PT | 24.01.2022 | ||
Former [2022/23] | AT | 22.09.2021 | |
CZ | 22.09.2021 | ||
EE | 22.09.2021 | ||
FI | 22.09.2021 | ||
HR | 22.09.2021 | ||
LT | 22.09.2021 | ||
LV | 22.09.2021 | ||
PL | 22.09.2021 | ||
RS | 22.09.2021 | ||
SE | 22.09.2021 | ||
SK | 22.09.2021 | ||
BG | 22.12.2021 | ||
GR | 23.12.2021 | ||
PT | 24.01.2022 | ||
Former [2022/21] | AT | 22.09.2021 | |
FI | 22.09.2021 | ||
HR | 22.09.2021 | ||
LT | 22.09.2021 | ||
LV | 22.09.2021 | ||
RS | 22.09.2021 | ||
SE | 22.09.2021 | ||
BG | 22.12.2021 | ||
GR | 23.12.2021 | ||
Former [2022/10] | FI | 22.09.2021 | |
HR | 22.09.2021 | ||
LT | 22.09.2021 | ||
LV | 22.09.2021 | ||
RS | 22.09.2021 | ||
SE | 22.09.2021 | ||
BG | 22.12.2021 | ||
GR | 23.12.2021 | ||
Former [2022/09] | FI | 22.09.2021 | |
LT | 22.09.2021 | ||
RS | 22.09.2021 | ||
SE | 22.09.2021 | ||
BG | 22.12.2021 | ||
Former [2022/08] | FI | 22.09.2021 | |
LT | 22.09.2021 | ||
SE | 22.09.2021 | ||
BG | 22.12.2021 | Documents cited: | Search | [A]WO2011053928 (NANOSTEEL CO INC [US], et al) [A] 1-9 * abstract * * paragraphs [0024] , [0 28] , [0 41] , [0 42] * * claims 1-12 ** table 1 *; | [I] - SAMUEL M. ALLEN ET AL, "Three-dimensional printing of metal parts for tooling and other applications", METALS AND MATERIALS (INSTITUTE OF METALS), (20001101), vol. 6, no. 6, doi:10.1007/BF03028104, ISSN 1225-9438, pages 589 - 594, XP055496346 [I] 1-9 * abstract * * 1. Introduction: 2.1 Printing metal tools; 2.2 Densification of green parts; 6. Conclusions. * DOI: http://dx.doi.org/10.1007/BF03028104 | International search | [A]US5819154 (HU BO [JP], et al) [A] 1-18* ; entire document *; | [Y]US6709739 (MULLEN ROBERT L [US], et al) [Y] 8, 17 * ; column 10, lines 60-63; column 11, lines 1-4 *; | [Y]US2005109431 (KERNAN BRIAN D [US], et al) [Y] 6, 15 * ; abstract; paragraphs [0126], [0130] *; | [A]US2008038144 (MAZIASZ PHILLIP J [US], et al) [A] 1-18 * ; entire document *; | [A]US2013078448 (TUCKER MICHAEL C [US], et al) [A] 1-18 * ; entire document *; | [Y]US2013136941 (ZHENG QINGJUN [US], et al) [Y] 1-18 * ; paragraphs [0006]-[0007], [0010], [0012], [0030], [0032], [0042], [0047], [0050], [0055]-[0060], [0068], [0071]-[0072], [0080] *; | [Y]US2013167965 (CHENEY JUSTIN LEE [US], et al) [Y] 9, 18 * ; abstract; paragraphs [0009], [0011], [0062]-[0063] *; | [Y]WO2015006697 (HEIKKILA KURT E [US]) [Y] 1-18 * ; abstract; page 3, lines 6-10; page 4, lines 16-22; page 6, lines 5-17; page 11, line 31 - page 12, line 4; page 25, lines 14-17; page 29, lines 1-16 * |