blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3308043

EP3308043 - ANGULAR CONTACT BALL BEARING WITH COLD FORMED BEARING RING AS WELL AS METHOD OF MANUFACTURE A BEARING RING OF AN ANGULAR CONTACT BALL BEARING [Right-click to bookmark this link]
Former [2018/16]ANGULAR CONTACT BALL BEARING HAVING A COLD-FORMED BEARING RING, AND A METHOD FOR MANUFACTURING A BEARING RING OF SAID ANGULAR CONTACT BALL BEARING
[2019/16]
StatusNo opposition filed within time limit
Status updated on  16.06.2023
Database last updated on 03.10.2024
FormerThe patent has been granted
Status updated on  08.07.2022
FormerGrant of patent is intended
Status updated on  03.04.2022
FormerExamination is in progress
Status updated on  08.07.2019
FormerRequest for examination was made
Status updated on  26.04.2018
FormerThe international publication has been made
Status updated on  16.12.2016
Formerunknown
Status updated on  18.11.2016
Most recent event   Tooltip24.05.2024Lapse of the patent in a contracting state
New state(s): IT
published on 26.06.2024  [2024/26]
Applicant(s)For all designated states
Schaeffler Technologies AG & Co. KG
Industriestrasse 1-3
91074 Herzogenaurach / DE
[2018/16]
Inventor(s)01 / KICK-RODENBÜCHER, Reinhard
Greuther Str. 18
90455 Nürnberg / DE
02 / EIDLOTH, Rainer
Straußstr. 4
91074 Herzogenaurach / DE
03 / MANTAU, Markus
Heuberg 17
90617 Puschendorf / DE
 [2018/17]
Application number, filing date16750091.708.06.2016
[2018/16]
WO2016DE200266
Priority number, dateDE20151021076512.06.2015         Original published format: DE102015210765
[2018/16]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2016198069
Date:15.12.2016
Language:DE
[2016/50]
Type: A1 Application with search report 
No.:EP3308043
Date:18.04.2018
Language:DE
The application published by WIPO in one of the EPO official languages on 15.12.2016 takes the place of the publication of the European patent application.
[2018/16]
Type: B1 Patent specification 
No.:EP3308043
Date:10.08.2022
Language:DE
[2022/32]
Search report(s)International search report - published on:EP15.12.2016
ClassificationIPC:F16C19/16, F16C33/64, B21K1/04, B23P13/00
[2019/16]
CPC:
F16C19/163 (EP,CN,US); F16C33/64 (EP,CN,US); B21K1/04 (EP,US);
F16C33/3806 (EP,US); F16C33/3856 (EP,US); F16C2220/46 (CN);
F16C2220/48 (EP,CN,US); F16C33/4635 (US); F16C43/06 (EP,US) (-)
Former IPC [2018/16]F16C19/16, F16C33/64, B21D53/10, B23P13/00, F16C33/58
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/16]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:SCHRÄGKUGELLAGER MIT KALTUMGEFORMTEM LAGERRING SOWIE VERFAHREN ZUR FERTIGUNG EINES LAGERRINGS DES SCHRÄGKUGELLAGERS[2018/16]
English:ANGULAR CONTACT BALL BEARING WITH COLD FORMED BEARING RING AS WELL AS METHOD OF MANUFACTURE A BEARING RING OF AN ANGULAR CONTACT BALL BEARING[2019/16]
French:ROULEMENT À CONTACT OBLIQUE AVEC BAGUE DE ROULEMENT FABRIQUÉE PAR FORMAGE À FROID ET PROCÉDÉ DE FABRICATION UN BAGUE D'UN ROULEMENT À CONTACT OBLIQUE[2019/16]
Former [2018/16]ANGULAR CONTACT BALL BEARING HAVING A COLD-FORMED BEARING RING, AND A METHOD FOR MANUFACTURING A BEARING RING OF SAID ANGULAR CONTACT BALL BEARING
Former [2018/16]PALIER À BILLES À CONTACT OBLIQUE COMPRENANT UNE BAGUE DE PALIER FORMÉE À FROID ET PROCÉDÉ DE FABRICATION D'UNE BAGUE DE PALIER DU PALIER À BILLES À CONTACT OBLIQUE
Entry into regional phase11.09.2017National basic fee paid 
11.09.2017Designation fee(s) paid 
11.09.2017Examination fee paid 
Examination procedure11.09.2017Examination requested  [2018/16]
11.09.2017Date on which the examining division has become responsible
07.06.2018Amendment by applicant (claims and/or description)
11.07.2019Despatch of a communication from the examining division (Time limit: M04)
25.10.2019Reply to a communication from the examining division
04.04.2022Communication of intention to grant the patent
14.06.2022Fee for grant paid
14.06.2022Fee for publishing/printing paid
14.06.2022Receipt of the translation of the claim(s)
Opposition(s)11.05.2023No opposition filed within time limit [2023/29]
Fees paidRenewal fee
02.07.2018Renewal fee patent year 03
01.07.2019Renewal fee patent year 04
30.06.2020Renewal fee patent year 05
30.06.2021Renewal fee patent year 06
30.06.2022Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL10.08.2022
CZ10.08.2022
DK10.08.2022
EE10.08.2022
ES10.08.2022
FI10.08.2022
HR10.08.2022
IT10.08.2022
LT10.08.2022
LV10.08.2022
MC10.08.2022
NL10.08.2022
PL10.08.2022
RO10.08.2022
RS10.08.2022
SE10.08.2022
SI10.08.2022
SK10.08.2022
SM10.08.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
[2024/26]
Former [2024/09]AL10.08.2022
CZ10.08.2022
DK10.08.2022
EE10.08.2022
ES10.08.2022
FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
MC10.08.2022
NL10.08.2022
PL10.08.2022
RO10.08.2022
RS10.08.2022
SE10.08.2022
SI10.08.2022
SK10.08.2022
SM10.08.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/37]AL10.08.2022
CZ10.08.2022
DK10.08.2022
EE10.08.2022
ES10.08.2022
FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
NL10.08.2022
PL10.08.2022
RO10.08.2022
RS10.08.2022
SE10.08.2022
SI10.08.2022
SK10.08.2022
SM10.08.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/29]AL10.08.2022
CZ10.08.2022
DK10.08.2022
EE10.08.2022
ES10.08.2022
FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
NL10.08.2022
PL10.08.2022
RO10.08.2022
RS10.08.2022
SE10.08.2022
SK10.08.2022
SM10.08.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/23]CZ10.08.2022
DK10.08.2022
EE10.08.2022
ES10.08.2022
FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
NL10.08.2022
PL10.08.2022
RO10.08.2022
RS10.08.2022
SE10.08.2022
SK10.08.2022
SM10.08.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/22]CZ10.08.2022
DK10.08.2022
ES10.08.2022
FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
NL10.08.2022
PL10.08.2022
RO10.08.2022
RS10.08.2022
SE10.08.2022
SM10.08.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/21]DK10.08.2022
FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
NL10.08.2022
PL10.08.2022
RS10.08.2022
SE10.08.2022
SM10.08.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/20]FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
NL10.08.2022
PL10.08.2022
RS10.08.2022
SE10.08.2022
SM10.08.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/12]FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
NL10.08.2022
PL10.08.2022
RS10.08.2022
SE10.08.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/11]FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
NL10.08.2022
PL10.08.2022
RS10.08.2022
SE10.08.2022
NO10.11.2022
GR11.11.2022
PT12.12.2022
Former [2023/10]FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
NL10.08.2022
RS10.08.2022
SE10.08.2022
NO10.11.2022
GR11.11.2022
PT12.12.2022
Former [2023/09]FI10.08.2022
LT10.08.2022
LV10.08.2022
NL10.08.2022
RS10.08.2022
SE10.08.2022
NO10.11.2022
PT12.12.2022
Former [2023/08]FI10.08.2022
LT10.08.2022
NL10.08.2022
RS10.08.2022
SE10.08.2022
NO10.11.2022
Cited inExaminationDE102012206441
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.