EP3259441 - INTEGRATED WELL COMPLETIONS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.08.2023 Database last updated on 04.11.2024 | |
Former | The patent has been granted Status updated on 16.09.2022 | ||
Former | Grant of patent is intended Status updated on 18.05.2022 | ||
Former | Examination is in progress Status updated on 09.12.2019 | ||
Former | Request for examination was made Status updated on 24.11.2017 | ||
Former | The international publication has been made Status updated on 16.12.2016 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For:FR
Services Pétroliers Schlumberger 42, rue Saint Dominique 75007 Paris / FR | For:AL
AT
BE
BG
CH
CY
CZ
DE
DK
EE
ES
FI
GB
GR
HR
HU
IE
IS
IT
LI
LT
LU
LV
MC
MK
MT
NL
NO
PL
PT
RO
RS
SE
SI
SK
SM
TR
Schlumberger Technology B.V. Parkstraat 83-89m 2514 JG The Hague / NL | [2017/52] | Inventor(s) | 01 /
SHAPOSHNIKOV, Pavel 10210 Western Pine Trial Katy, Texas 77494 / US | 02 /
LAW, Matthew 29 Sturdee Road 207844 / SG | 03 /
TOVAR, Gioconda 26503 Grey Sparrow Dr. Katy, Texas 77494 / US | [2017/52] | Representative(s) | Schlumberger Intellectual Property Department Parkstraat 83 2514 JG Den Haag / NL | [2022/42] |
Former [2017/52] | Schlumberger Cambridge Research Limited High Cross Madingley Road Cambridge CB3 0EL / GB | Application number, filing date | 16752979.1 | 17.02.2016 | [2017/52] | WO2016US18270 | Priority number, date | US201562117895P | 18.02.2015 Original published format: US 201562117895 P | [2017/52] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2016134018 | Date: | 25.08.2016 | Language: | EN | [2016/34] | Type: | A2 Application without search report | No.: | EP3259441 | Date: | 27.12.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 25.08.2016 takes the place of the publication of the European patent application. | [2017/52] | Type: | B1 Patent specification | No.: | EP3259441 | Date: | 19.10.2022 | Language: | EN | [2022/42] | Search report(s) | International search report - published on: | KR | 15.12.2016 | (Supplementary) European search report - dispatched on: | EP | 22.01.2019 | Classification | IPC: | E21B33/14, E21B47/005, E21B47/085 | [2022/19] | CPC: |
E21B33/14 (EP,US);
E21B47/005 (EP,US);
E21B41/00 (EP,US);
E21B43/00 (US);
E21B47/085 (EP,US);
E21B2200/20 (US);
|
Former IPC [2018/44] | E21B33/14, E21B47/00, E21B47/08, G01V1/40 | ||
Former IPC [2017/52] | E21B33/13, E21B33/138, E21B47/00, G01V1/40 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/52] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | INTEGRIERTE BOHRLOCHABSCHLÜSSE | [2017/52] | English: | INTEGRATED WELL COMPLETIONS | [2017/52] | French: | COMPLÉTIONS INTÉGRÉES DE PUITS | [2017/52] | Entry into regional phase | 22.08.2017 | National basic fee paid | 18.08.2017 | Search fee paid | 22.08.2017 | Designation fee(s) paid | 22.08.2017 | Examination fee paid | Examination procedure | 18.08.2017 | Date on which the examining division has become responsible | 22.08.2017 | Examination requested [2017/52] | 19.08.2019 | Amendment by applicant (claims and/or description) | 12.12.2019 | Despatch of a communication from the examining division (Time limit: M06) | 22.06.2020 | Reply to a communication from the examining division | 13.11.2020 | Despatch of a communication from the examining division (Time limit: M06) | 10.05.2021 | Reply to a communication from the examining division | 19.05.2022 | Communication of intention to grant the patent | 09.09.2022 | Fee for grant paid | 09.09.2022 | Fee for publishing/printing paid | 09.09.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 20.07.2023 | No opposition filed within time limit [2023/39] | Fees paid | Renewal fee | 27.02.2018 | Renewal fee patent year 03 | 13.02.2019 | Renewal fee patent year 04 | 13.02.2020 | Renewal fee patent year 05 | 12.02.2021 | Renewal fee patent year 06 | 14.01.2022 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 19.10.2022 | AT | 19.10.2022 | CZ | 19.10.2022 | DK | 19.10.2022 | EE | 19.10.2022 | ES | 19.10.2022 | FI | 19.10.2022 | HR | 19.10.2022 | IT | 19.10.2022 | LT | 19.10.2022 | LV | 19.10.2022 | MC | 19.10.2022 | NL | 19.10.2022 | PL | 19.10.2022 | RO | 19.10.2022 | RS | 19.10.2022 | SE | 19.10.2022 | SI | 19.10.2022 | SK | 19.10.2022 | SM | 19.10.2022 | GR | 20.01.2023 | IE | 17.02.2023 | LU | 17.02.2023 | IS | 19.02.2023 | PT | 20.02.2023 | BE | 28.02.2023 | CH | 28.02.2023 | FR | 28.02.2023 | LI | 28.02.2023 | [2024/26] |
Former [2024/11] | AL | 19.10.2022 | |
AT | 19.10.2022 | ||
CZ | 19.10.2022 | ||
DK | 19.10.2022 | ||
EE | 19.10.2022 | ||
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
HR | 19.10.2022 | ||
LT | 19.10.2022 | ||
LV | 19.10.2022 | ||
MC | 19.10.2022 | ||
NL | 19.10.2022 | ||
PL | 19.10.2022 | ||
RO | 19.10.2022 | ||
RS | 19.10.2022 | ||
SE | 19.10.2022 | ||
SI | 19.10.2022 | ||
SK | 19.10.2022 | ||
SM | 19.10.2022 | ||
GR | 20.01.2023 | ||
IE | 17.02.2023 | ||
LU | 17.02.2023 | ||
IS | 19.02.2023 | ||
PT | 20.02.2023 | ||
BE | 28.02.2023 | ||
CH | 28.02.2023 | ||
FR | 28.02.2023 | ||
LI | 28.02.2023 | ||
Former [2024/08] | AL | 19.10.2022 | |
AT | 19.10.2022 | ||
CZ | 19.10.2022 | ||
DK | 19.10.2022 | ||
EE | 19.10.2022 | ||
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
HR | 19.10.2022 | ||
LT | 19.10.2022 | ||
LV | 19.10.2022 | ||
MC | 19.10.2022 | ||
NL | 19.10.2022 | ||
PL | 19.10.2022 | ||
RO | 19.10.2022 | ||
RS | 19.10.2022 | ||
SE | 19.10.2022 | ||
SI | 19.10.2022 | ||
SK | 19.10.2022 | ||
SM | 19.10.2022 | ||
GR | 20.01.2023 | ||
IE | 17.02.2023 | ||
LU | 17.02.2023 | ||
IS | 19.02.2023 | ||
PT | 20.02.2023 | ||
CH | 28.02.2023 | ||
LI | 28.02.2023 | ||
Former [2023/51] | AL | 19.10.2022 | |
AT | 19.10.2022 | ||
CZ | 19.10.2022 | ||
DK | 19.10.2022 | ||
EE | 19.10.2022 | ||
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
HR | 19.10.2022 | ||
LT | 19.10.2022 | ||
LV | 19.10.2022 | ||
MC | 19.10.2022 | ||
NL | 19.10.2022 | ||
PL | 19.10.2022 | ||
RO | 19.10.2022 | ||
RS | 19.10.2022 | ||
SE | 19.10.2022 | ||
SI | 19.10.2022 | ||
SK | 19.10.2022 | ||
SM | 19.10.2022 | ||
GR | 20.01.2023 | ||
LU | 17.02.2023 | ||
IS | 19.02.2023 | ||
PT | 20.02.2023 | ||
CH | 28.02.2023 | ||
LI | 28.02.2023 | ||
Former [2023/49] | AL | 19.10.2022 | |
AT | 19.10.2022 | ||
CZ | 19.10.2022 | ||
DK | 19.10.2022 | ||
EE | 19.10.2022 | ||
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
HR | 19.10.2022 | ||
LT | 19.10.2022 | ||
LV | 19.10.2022 | ||
MC | 19.10.2022 | ||
NL | 19.10.2022 | ||
PL | 19.10.2022 | ||
RO | 19.10.2022 | ||
RS | 19.10.2022 | ||
SE | 19.10.2022 | ||
SK | 19.10.2022 | ||
SM | 19.10.2022 | ||
GR | 20.01.2023 | ||
LU | 17.02.2023 | ||
IS | 19.02.2023 | ||
PT | 20.02.2023 | ||
CH | 28.02.2023 | ||
LI | 28.02.2023 | ||
Former [2023/48] | AL | 19.10.2022 | |
AT | 19.10.2022 | ||
CZ | 19.10.2022 | ||
DK | 19.10.2022 | ||
EE | 19.10.2022 | ||
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
HR | 19.10.2022 | ||
LT | 19.10.2022 | ||
LV | 19.10.2022 | ||
MC | 19.10.2022 | ||
NL | 19.10.2022 | ||
PL | 19.10.2022 | ||
RO | 19.10.2022 | ||
RS | 19.10.2022 | ||
SE | 19.10.2022 | ||
SK | 19.10.2022 | ||
SM | 19.10.2022 | ||
GR | 20.01.2023 | ||
IS | 19.02.2023 | ||
PT | 20.02.2023 | ||
CH | 28.02.2023 | ||
LI | 28.02.2023 | ||
Former [2023/44] | AL | 19.10.2022 | |
AT | 19.10.2022 | ||
CZ | 19.10.2022 | ||
DK | 19.10.2022 | ||
EE | 19.10.2022 | ||
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
HR | 19.10.2022 | ||
LT | 19.10.2022 | ||
LV | 19.10.2022 | ||
MC | 19.10.2022 | ||
NL | 19.10.2022 | ||
PL | 19.10.2022 | ||
RO | 19.10.2022 | ||
RS | 19.10.2022 | ||
SE | 19.10.2022 | ||
SK | 19.10.2022 | ||
SM | 19.10.2022 | ||
GR | 20.01.2023 | ||
IS | 19.02.2023 | ||
PT | 20.02.2023 | ||
Former [2023/38] | AL | 19.10.2022 | |
AT | 19.10.2022 | ||
CZ | 19.10.2022 | ||
DK | 19.10.2022 | ||
EE | 19.10.2022 | ||
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
HR | 19.10.2022 | ||
LT | 19.10.2022 | ||
LV | 19.10.2022 | ||
NL | 19.10.2022 | ||
PL | 19.10.2022 | ||
RO | 19.10.2022 | ||
RS | 19.10.2022 | ||
SE | 19.10.2022 | ||
SK | 19.10.2022 | ||
SM | 19.10.2022 | ||
GR | 20.01.2023 | ||
IS | 19.02.2023 | ||
PT | 20.02.2023 | ||
Former [2023/37] | AL | 19.10.2022 | |
AT | 19.10.2022 | ||
CZ | 19.10.2022 | ||
DK | 19.10.2022 | ||
EE | 19.10.2022 | ||
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
HR | 19.10.2022 | ||
LT | 19.10.2022 | ||
LV | 19.10.2022 | ||
NL | 19.10.2022 | ||
PL | 19.10.2022 | ||
RO | 19.10.2022 | ||
RS | 19.10.2022 | ||
SE | 19.10.2022 | ||
SM | 19.10.2022 | ||
GR | 20.01.2023 | ||
IS | 19.02.2023 | ||
PT | 20.02.2023 | ||
Former [2023/35] | AT | 19.10.2022 | |
CZ | 19.10.2022 | ||
DK | 19.10.2022 | ||
EE | 19.10.2022 | ||
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
HR | 19.10.2022 | ||
LT | 19.10.2022 | ||
LV | 19.10.2022 | ||
NL | 19.10.2022 | ||
PL | 19.10.2022 | ||
RO | 19.10.2022 | ||
RS | 19.10.2022 | ||
SE | 19.10.2022 | ||
SM | 19.10.2022 | ||
GR | 20.01.2023 | ||
IS | 19.02.2023 | ||
PT | 20.02.2023 | ||
Former [2023/34] | AT | 19.10.2022 | |
DK | 19.10.2022 | ||
EE | 19.10.2022 | ||
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
HR | 19.10.2022 | ||
LT | 19.10.2022 | ||
LV | 19.10.2022 | ||
NL | 19.10.2022 | ||
PL | 19.10.2022 | ||
RS | 19.10.2022 | ||
SE | 19.10.2022 | ||
SM | 19.10.2022 | ||
GR | 20.01.2023 | ||
IS | 19.02.2023 | ||
PT | 20.02.2023 | ||
Former [2023/33] | AT | 19.10.2022 | |
DK | 19.10.2022 | ||
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
HR | 19.10.2022 | ||
LT | 19.10.2022 | ||
LV | 19.10.2022 | ||
NL | 19.10.2022 | ||
PL | 19.10.2022 | ||
RS | 19.10.2022 | ||
SE | 19.10.2022 | ||
SM | 19.10.2022 | ||
GR | 20.01.2023 | ||
IS | 19.02.2023 | ||
PT | 20.02.2023 | ||
Former [2023/26] | AT | 19.10.2022 | |
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
HR | 19.10.2022 | ||
LT | 19.10.2022 | ||
LV | 19.10.2022 | ||
NL | 19.10.2022 | ||
PL | 19.10.2022 | ||
RS | 19.10.2022 | ||
SE | 19.10.2022 | ||
GR | 20.01.2023 | ||
IS | 19.02.2023 | ||
PT | 20.02.2023 | ||
Former [2023/24] | AT | 19.10.2022 | |
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
HR | 19.10.2022 | ||
LT | 19.10.2022 | ||
LV | 19.10.2022 | ||
NL | 19.10.2022 | ||
SE | 19.10.2022 | ||
GR | 20.01.2023 | ||
PT | 20.02.2023 | ||
Former [2023/23] | AT | 19.10.2022 | |
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
LT | 19.10.2022 | ||
LV | 19.10.2022 | ||
NL | 19.10.2022 | ||
SE | 19.10.2022 | ||
GR | 20.01.2023 | ||
PT | 20.02.2023 | ||
Former [2023/22] | AT | 19.10.2022 | |
ES | 19.10.2022 | ||
FI | 19.10.2022 | ||
LT | 19.10.2022 | ||
NL | 19.10.2022 | ||
SE | 19.10.2022 | ||
PT | 20.02.2023 | ||
Former [2023/20] | LT | 19.10.2022 | |
NL | 19.10.2022 | ||
Former [2023/17] | NL | 19.10.2022 | Documents cited: | Search | [X]US2014192619 (SINHA BIKESH K [US], et al) [X] 1-12 * paragraphs [0001] , [0014] , [0023] , [0029]; figure 2 *; | [A]WO2014165487 (SCHLUMBERGER SERVICES PETROL [FR], et al) [A] 1-12 * paragraph [0043] *; | [X]US2014309936 (ABBASSIAN FEREIDOUN [US], et al) [X] 1-12 * paragraphs [0005] - [0007] - [0015] - [0018] - [0027] , [0138] - [0141] - [0150] , [0151] , [0180] - [0210]; figure 1; claim 1 *; | [A] - Pavel Shaposhnikov ET AL, "ADVANCED TECHNIQUES IN INTEGRATED CEMENT EVALUATION", SPWLA 54 th Annual Logging Symposium, (20130622), URL: https://www.onepetro.org/download/conference-paper/SPWLA-2013-SSS?id=conference-paper/SPWLA-2013-SSS, (20160429), XP055269726 [A] 1-12 * the whole document * | International search | [A]US2009152005 (CHAPMAN CLINTON [US], et al) [A] 1-20* See paragraphs [0051]-[0070], [0086]-[0090] and figures 3-5.3, 9. *; | [Y]US2011153300 (HOLL JAMES E [US], et al) [Y] 1-12, 19 * See paragraphs [0013], [0018], [0030], [0034], [0045] and figures 1-3. *; | [A]US2014034390 (MITCHELL ROBERT [US], et al) [A] 1-20 * See paragraphs [0011]-[0016] and figures 1-3. *; | [Y]WO2014165487 (SCHLUMBERGER SERVICES PETROL [FR], et al) [Y] 11-20 * See paragraphs [0027], [0038], [0073]-[0078] and figures 1-5, 17-19. *; | [Y]US2014309936 (ABBASSIAN FEREIDOUN [US], et al) [Y] 1-20 * See paragraphs [0005], [0124], [0145]-[0151], [0180]-[0186], [0206]-[0207] and figures 1, 29-35, 54-56. * | by applicant | US2014192619 | US2014309936 |