blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3335361

EP3335361 - COMMUNICATION SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  13.08.2021
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  04.09.2020
FormerGrant of patent is intended
Status updated on  28.04.2020
FormerExamination is in progress
Status updated on  14.04.2020
FormerGrant of patent is intended
Status updated on  08.12.2019
FormerExamination is in progress
Status updated on  01.06.2018
FormerRequest for examination was made
Status updated on  18.05.2018
FormerThe international publication has been made
Status updated on  18.02.2017
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
NEC Corporation
7-1, Shiba 5-chome Minato-ku
Tokyo 108-8001 / JP
[2018/25]
Inventor(s)01 / AWAD, Yassin Aden
c/o NEC Corporation
7-1 Shiba 5-chome
Minato-ku
Tokyo 108-8001 / JP
02 / ARNOTT, Robert
c/o NEC Corporation
7-1 Shiba 5-chome
Minato-ku
Tokyo 108-8001 / JP
 [2018/25]
Representative(s)MacDougall, Alan John Shaw, et al
Mathys & Squire The Shard
32 London Bridge Street
London SE1 9SG / GB
[N/P]
Former [2018/25]MacDougall, Alan John Shaw, et al
Mathys & Squire LLP The Shard
32 London Bridge Street
London SE1 9SG / GB
Application number, filing date16759885.310.08.2016
[2018/25]
WO2016JP03709
Priority number, dateGB2015001423512.08.2015         Original published format: GB 201514235
[2018/25]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017026126
Date:16.02.2017
Language:EN
[2017/07]
Type: A1 Application with search report 
No.:EP3335361
Date:20.06.2018
Language:EN
The application published by WIPO in one of the EPO official languages on 16.02.2017 takes the place of the publication of the European patent application.
[2018/25]
Type: B1 Patent specification 
No.:EP3335361
Date:07.10.2020
Language:EN
[2020/41]
Search report(s)International search report - published on:EP16.02.2017
ClassificationIPC:H04W4/70, H04L5/00, H04W72/04
[2020/21]
CPC:
H04W4/70 (EP,GB,US); H04W72/044 (US); H04L5/0012 (US);
H04L5/0053 (EP,US); H04L5/0094 (EP,US); H04W72/04 (GB);
H04W72/23 (EP,US); H04W72/0453 (EP,US) (-)
Former IPC [2019/51]H04L5/00, H04W72/04, H04W4/00, H04W4/70
Former IPC [2018/25]H04L5/00, H04W72/04, H04W4/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/25]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:KOMMUNIKATIONSSYSTEM[2018/25]
English:COMMUNICATION SYSTEM[2018/25]
French:SYSTÈME DE COMMUNICATION[2018/25]
Entry into regional phase08.02.2018National basic fee paid 
08.02.2018Designation fee(s) paid 
08.02.2018Examination fee paid 
Examination procedure08.02.2018Amendment by applicant (claims and/or description)
08.02.2018Examination requested  [2018/25]
08.02.2018Date on which the examining division has become responsible
05.06.2018Despatch of a communication from the examining division (Time limit: M04)
15.10.2018Reply to a communication from the examining division
31.10.2018Despatch of a communication from the examining division (Time limit: M04)
07.03.2019Reply to a communication from the examining division
08.11.2019Cancellation of oral proceeding that was planned for 05.12.2019
05.12.2019Date of oral proceedings (cancelled)
09.12.2019Communication of intention to grant the patent
14.04.2020Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
29.04.2020Communication of intention to grant the patent
27.08.2020Fee for grant paid
27.08.2020Fee for publishing/printing paid
27.08.2020Receipt of the translation of the claim(s)
Opposition(s)08.07.2021No opposition filed within time limit [2021/37]
Fees paidRenewal fee
28.08.2018Renewal fee patent year 03
15.08.2019Renewal fee patent year 04
13.08.2020Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU10.08.2016
AL07.10.2020
AT07.10.2020
CY07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
MC07.10.2020
MK07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
TR07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
[2024/29]
Former [2024/22]HU10.08.2016
AL07.10.2020
AT07.10.2020
CY07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
MC07.10.2020
MK07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2023/30]HU10.08.2016
AL07.10.2020
AT07.10.2020
CY07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
MC07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2023/29]HU10.08.2016
AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
MC07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2022/23]AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
MC07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2022/18]AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
MC07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
PT08.02.2021
Former [2022/10]AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
PT08.02.2021
Former [2021/50]AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/48]AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/45]AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/37]AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/36]AT07.10.2020
CZ07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/35]AT07.10.2020
CZ07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/34]AT07.10.2020
CZ07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RS07.10.2020
SE07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/33]AT07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RS07.10.2020
SE07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/32]AT07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RS07.10.2020
SE07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/30]AT07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RS07.10.2020
SE07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/28]AT07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LV07.10.2020
PL07.10.2020
RS07.10.2020
SE07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/25]AT07.10.2020
ES07.10.2020
FI07.10.2020
LV07.10.2020
PL07.10.2020
RS07.10.2020
SE07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/23]AT07.10.2020
FI07.10.2020
LV07.10.2020
RS07.10.2020
SE07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
PT08.02.2021
Former [2021/22]FI07.10.2020
RS07.10.2020
NO07.01.2021
PT08.02.2021
Former [2021/21]FI07.10.2020
PT08.02.2021
Former [2021/20]FI07.10.2020
Cited inInternational search[XI]WO2015045865  (NTT DOCOMO INC [JP]) [X] 1,19,23,24 * the whole document * [I] 2-18,20-22;
 US2016242207  [ ] (YASUKAWA SHIMPEI [JP], et al) [ ] * claims 1-12 *;
 [XI]  - NTT DOCOMO ET AL, "Way forward on Resource Allocation for PDSCH/PUSCH", vol. RAN WG1, no. Fukuoka, Japan; 20150520 - 20150529, (20150528), 3GPP DRAFT; R1-153619 M-PDCCH PDSCH RELATION_V5, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20150528), XP050980824 [X] 1,19,23,24 * the whole document * [I] 2-18,20-22
 [A]  - LG ELECTRONICS ET AL, "WF on Narrowband Definition for Rel-13 MTC UEs", vol. RAN WG1, no. Fukuoka, Japan; 20150525 - 20150529, (20150601), 3GPP DRAFT; R1-153615, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_81/Docs/, (20150601), XP050980672 [A] 1-24 * the whole document *
 [A]  - CATT, "Narrowband design for Rel-13 low complexity UEs", vol. RAN WG1, no. Fukuoka, Japan; 20150525 - 20150529, (20150516), 3GPP DRAFT; R1-152556, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_81/Docs/, (20150516), XP050968928 [A] 1-24 * the whole document *
 [IP]  - NEC, "Details of the Frequency hopping schemes for LTE Rel-13 MTC", vol. RAN WG1, no. Beijing, China; 20150824 - 20150828, (20150823), 3GPP DRAFT; R1-154196 DETAILS OF THE FREQUENCY HOPPING DESIGN FOR LTE REL-13 MTC, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOL, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20150823), XP051039426 [IP] 1-24 * the whole document *
 [IP]  - NEC, "Definition of Narrowbands across System BW for LTE Rel-13", vol. RAN WG1, no. Beijing, China; 20150824 - 20150828, (20150823), 3GPP DRAFT; R1-154195 DEFINITION OF NARROWBANDS ACROSS SYSTEM BW FOR LTE REL-13, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLI, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20150823), XP051039425 [IP] 1-24 * the whole document *
 [A]  - MCC SUPPORT, "Draft Report of 3GPP TSG RAN WG1 #81 v0.1.0 (Fukuoka, Japan, 25th - 29th May 2", vol. RAN WG1, no. Beijing, China; 20150824 - 20150828, (20150602), 3GPP DRAFT; DRAFT_MINUTES_REPORT_RAN1#81_V010, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_81/Report/, (20150602), XP050983647 [A] 1-24 * the whole document *
ExaminationWO2013020565
    - ZTE, "PRB group definition and frequency hopping for MTC enhancement", vol. RAN WG1, no. Fukuoka, Japan; 20150525 - 20150529, (20150524), 3GPP DRAFT; R1-152954_PRB GROUP_HOPPING, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20150524), XP050969460
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.