EP3365637 - THERMAL FLOW METER AND ARRANGEMENT CONSISTING OF A PIPE AND THE THERMAL FLOW METER [Right-click to bookmark this link] | |||
Former [2018/35] | THERMAL FLOW METER AND ASSEMBLY HAVING A PIPE AND THE THERMAL FLOW METER | ||
[2019/27] | Status | No opposition filed within time limit Status updated on 11.12.2020 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 03.01.2020 | ||
Former | Grant of patent is intended Status updated on 05.11.2019 | ||
Former | Request for examination was made Status updated on 23.10.2019 | ||
Former | Grant of patent is intended Status updated on 09.07.2019 | ||
Former | Request for examination was made Status updated on 27.07.2018 | ||
Former | The international publication has been made Status updated on 28.04.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Endress+Hauser Flowtec AG Kägenstrasse 7 4153 Reinach / CH | [2018/35] | Inventor(s) | 01 /
SCHULTHEIS, Hanno Mühlestückweg 24 79539 Lörrach / DE | 02 /
GRÜN, Alexander Arndtstrasse 13 79539 Lörrach / DE | 03 /
PAPADOPOULOU, Ermioni Drosselweg 7 4143 Dornach / CH | 04 /
GABERTHÜEL, Stephan Hohestrasse 123B 4104 Oberwil / CH | 05 /
BARTH, Martin Untern Schellenberg 147 4125 Riehen / CH | 06 /
PAPATHANASIOU, Panagiotis Redingstrasse 20 4052 Basel / CH | [2018/37] |
Former [2018/35] | 01 /
SCHULTHEIS, Hanno Mühlestückweg 24 79539 Lörrach / DE | ||
02 /
GRÜN, Alexander Arndtstrasse 13 79539 Lörrach / DE | |||
03 /
PAPADOPOULOU, Ermioni Drosselweg 7 4143 Dornach / CH | |||
04 /
GABERTHÜEL, Stephan Hohestrasse 123B 4104 Oberwil / CH | |||
05 /
BARTH, Martin Hochbergstrasse 98 4057 Basel / CH | |||
06 /
PAPATHANASIOU, Panagiotis Redingstrasse 20 4052 Basel / CH | Representative(s) | Andres, Angelika Maria Endress+Hauser Group Services (Deutschland) AG+Co. KG Colmarer Straße 6 79576 Weil am Rhein / DE | [N/P] |
Former [2018/35] | Andres, Angelika Maria Endress+Hauser (Deutschland) AG+Co. KG PatServe Colmarer Strasse 6 79576 Weil am Rhein / DE | Application number, filing date | 16763032.6 | 08.09.2016 | [2018/35] | WO2016EP71203 | Priority number, date | DE201510118123 | 23.10.2015 Original published format: DE102015118123 | [2018/35] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2017067700 | Date: | 27.04.2017 | Language: | DE | [2017/17] | Type: | A1 Application with search report | No.: | EP3365637 | Date: | 29.08.2018 | Language: | DE | The application published by WIPO in one of the EPO official languages on 27.04.2017 takes the place of the publication of the European patent application. | [2018/35] | Type: | B1 Patent specification | No.: | EP3365637 | Date: | 05.02.2020 | Language: | DE | [2020/06] | Search report(s) | International search report - published on: | EP | 27.04.2017 | Classification | IPC: | G01F1/684, G01F15/14 | [2018/35] | CPC: |
G01F1/684 (EP,US);
G01F1/6842 (US);
G01F15/14 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/35] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | THERMISCHES DURCHFLUSSMESSGERÄT UND ANORDNUNG MIT EINEM ROHR UND DEM THERMISCHEN DURCHFLUSSMESSGERÄT | [2018/35] | English: | THERMAL FLOW METER AND ARRANGEMENT CONSISTING OF A PIPE AND THE THERMAL FLOW METER | [2019/27] | French: | DÉBITMÈTRE THERMIQUE ET ARRANGEMENT COMPRENANT UN TUYAU ET LE DÉBITMÈTRE THERMIQUE | [2019/27] |
Former [2018/35] | THERMAL FLOW METER AND ASSEMBLY HAVING A PIPE AND THE THERMAL FLOW METER | ||
Former [2018/35] | DÉBITMÈTRE THERMIQUE ET ENSEMBLE CANALISATION-DÉBITMÈTRE THERMIQUE | Entry into regional phase | 12.03.2018 | National basic fee paid | 12.03.2018 | Designation fee(s) paid | 12.03.2018 | Examination fee paid | Examination procedure | 12.03.2018 | Examination requested [2018/35] | 12.03.2018 | Date on which the examining division has become responsible | 06.12.2018 | Amendment by applicant (claims and/or description) | 10.07.2019 | Communication of intention to grant the patent | 17.10.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 06.11.2019 | Communication of intention to grant the patent | 12.12.2019 | Fee for grant paid | 12.12.2019 | Fee for publishing/printing paid | 12.12.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 06.11.2020 | No opposition filed within time limit [2021/02] | Fees paid | Renewal fee | 25.09.2018 | Renewal fee patent year 03 | 24.09.2019 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 08.09.2016 | AL | 05.02.2020 | CY | 05.02.2020 | CZ | 05.02.2020 | DK | 05.02.2020 | EE | 05.02.2020 | ES | 05.02.2020 | FI | 05.02.2020 | HR | 05.02.2020 | IT | 05.02.2020 | LT | 05.02.2020 | LV | 05.02.2020 | MC | 05.02.2020 | MK | 05.02.2020 | MT | 05.02.2020 | NL | 05.02.2020 | PL | 05.02.2020 | RO | 05.02.2020 | RS | 05.02.2020 | SE | 05.02.2020 | SI | 05.02.2020 | SK | 05.02.2020 | SM | 05.02.2020 | TR | 05.02.2020 | BG | 05.05.2020 | NO | 05.05.2020 | GR | 06.05.2020 | IS | 05.06.2020 | PT | 28.06.2020 | IE | 08.09.2020 | LU | 08.09.2020 | BE | 30.09.2020 | CH | 30.09.2020 | LI | 30.09.2020 | [2022/31] |
Former [2022/30] | HU | 08.09.2016 | |
AL | 05.02.2020 | ||
CY | 05.02.2020 | ||
CZ | 05.02.2020 | ||
DK | 05.02.2020 | ||
EE | 05.02.2020 | ||
ES | 05.02.2020 | ||
FI | 05.02.2020 | ||
HR | 05.02.2020 | ||
IT | 05.02.2020 | ||
LT | 05.02.2020 | ||
LV | 05.02.2020 | ||
MC | 05.02.2020 | ||
MT | 05.02.2020 | ||
NL | 05.02.2020 | ||
PL | 05.02.2020 | ||
RO | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
SI | 05.02.2020 | ||
SK | 05.02.2020 | ||
SM | 05.02.2020 | ||
TR | 05.02.2020 | ||
BG | 05.05.2020 | ||
NO | 05.05.2020 | ||
GR | 06.05.2020 | ||
IS | 05.06.2020 | ||
PT | 28.06.2020 | ||
IE | 08.09.2020 | ||
LU | 08.09.2020 | ||
BE | 30.09.2020 | ||
CH | 30.09.2020 | ||
LI | 30.09.2020 | ||
Former [2022/28] | HU | 08.09.2016 | |
CY | 05.02.2020 | ||
CZ | 05.02.2020 | ||
DK | 05.02.2020 | ||
EE | 05.02.2020 | ||
ES | 05.02.2020 | ||
FI | 05.02.2020 | ||
HR | 05.02.2020 | ||
IT | 05.02.2020 | ||
LT | 05.02.2020 | ||
LV | 05.02.2020 | ||
MC | 05.02.2020 | ||
MT | 05.02.2020 | ||
NL | 05.02.2020 | ||
PL | 05.02.2020 | ||
RO | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
SI | 05.02.2020 | ||
SK | 05.02.2020 | ||
SM | 05.02.2020 | ||
TR | 05.02.2020 | ||
BG | 05.05.2020 | ||
NO | 05.05.2020 | ||
GR | 06.05.2020 | ||
IS | 05.06.2020 | ||
PT | 28.06.2020 | ||
IE | 08.09.2020 | ||
LU | 08.09.2020 | ||
BE | 30.09.2020 | ||
CH | 30.09.2020 | ||
LI | 30.09.2020 | ||
Former [2022/27] | HU | 08.09.2016 | |
CY | 05.02.2020 | ||
CZ | 05.02.2020 | ||
DK | 05.02.2020 | ||
EE | 05.02.2020 | ||
ES | 05.02.2020 | ||
FI | 05.02.2020 | ||
HR | 05.02.2020 | ||
IT | 05.02.2020 | ||
LT | 05.02.2020 | ||
LV | 05.02.2020 | ||
MT | 05.02.2020 | ||
NL | 05.02.2020 | ||
PL | 05.02.2020 | ||
RO | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
SI | 05.02.2020 | ||
SK | 05.02.2020 | ||
SM | 05.02.2020 | ||
TR | 05.02.2020 | ||
BG | 05.05.2020 | ||
NO | 05.05.2020 | ||
GR | 06.05.2020 | ||
IS | 05.06.2020 | ||
PT | 28.06.2020 | ||
IE | 08.09.2020 | ||
LU | 08.09.2020 | ||
BE | 30.09.2020 | ||
CH | 30.09.2020 | ||
LI | 30.09.2020 | ||
Former [2021/37] | CZ | 05.02.2020 | |
DK | 05.02.2020 | ||
EE | 05.02.2020 | ||
ES | 05.02.2020 | ||
FI | 05.02.2020 | ||
HR | 05.02.2020 | ||
IT | 05.02.2020 | ||
LT | 05.02.2020 | ||
LV | 05.02.2020 | ||
NL | 05.02.2020 | ||
PL | 05.02.2020 | ||
RO | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
SI | 05.02.2020 | ||
SK | 05.02.2020 | ||
SM | 05.02.2020 | ||
BG | 05.05.2020 | ||
NO | 05.05.2020 | ||
GR | 06.05.2020 | ||
IS | 05.06.2020 | ||
PT | 28.06.2020 | ||
IE | 08.09.2020 | ||
LU | 08.09.2020 | ||
BE | 30.09.2020 | ||
CH | 30.09.2020 | ||
LI | 30.09.2020 | ||
Former [2021/36] | CZ | 05.02.2020 | |
DK | 05.02.2020 | ||
EE | 05.02.2020 | ||
ES | 05.02.2020 | ||
FI | 05.02.2020 | ||
HR | 05.02.2020 | ||
IT | 05.02.2020 | ||
LT | 05.02.2020 | ||
LV | 05.02.2020 | ||
NL | 05.02.2020 | ||
PL | 05.02.2020 | ||
RO | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
SI | 05.02.2020 | ||
SK | 05.02.2020 | ||
SM | 05.02.2020 | ||
BG | 05.05.2020 | ||
NO | 05.05.2020 | ||
GR | 06.05.2020 | ||
IS | 05.06.2020 | ||
PT | 28.06.2020 | ||
LU | 08.09.2020 | ||
BE | 30.09.2020 | ||
Former [2021/27] | CZ | 05.02.2020 | |
DK | 05.02.2020 | ||
EE | 05.02.2020 | ||
ES | 05.02.2020 | ||
FI | 05.02.2020 | ||
HR | 05.02.2020 | ||
IT | 05.02.2020 | ||
LT | 05.02.2020 | ||
LV | 05.02.2020 | ||
NL | 05.02.2020 | ||
PL | 05.02.2020 | ||
RO | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
SI | 05.02.2020 | ||
SK | 05.02.2020 | ||
SM | 05.02.2020 | ||
BG | 05.05.2020 | ||
NO | 05.05.2020 | ||
GR | 06.05.2020 | ||
IS | 05.06.2020 | ||
PT | 28.06.2020 | ||
LU | 08.09.2020 | ||
Former [2021/10] | CZ | 05.02.2020 | |
DK | 05.02.2020 | ||
EE | 05.02.2020 | ||
ES | 05.02.2020 | ||
FI | 05.02.2020 | ||
HR | 05.02.2020 | ||
IT | 05.02.2020 | ||
LT | 05.02.2020 | ||
LV | 05.02.2020 | ||
NL | 05.02.2020 | ||
PL | 05.02.2020 | ||
RO | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
SI | 05.02.2020 | ||
SK | 05.02.2020 | ||
SM | 05.02.2020 | ||
BG | 05.05.2020 | ||
NO | 05.05.2020 | ||
GR | 06.05.2020 | ||
IS | 05.06.2020 | ||
PT | 28.06.2020 | ||
Former [2020/50] | CZ | 05.02.2020 | |
DK | 05.02.2020 | ||
EE | 05.02.2020 | ||
ES | 05.02.2020 | ||
FI | 05.02.2020 | ||
HR | 05.02.2020 | ||
LT | 05.02.2020 | ||
LV | 05.02.2020 | ||
NL | 05.02.2020 | ||
RO | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
SK | 05.02.2020 | ||
SM | 05.02.2020 | ||
BG | 05.05.2020 | ||
NO | 05.05.2020 | ||
GR | 06.05.2020 | ||
IS | 05.06.2020 | ||
PT | 28.06.2020 | ||
Former [2020/49] | CZ | 05.02.2020 | |
DK | 05.02.2020 | ||
ES | 05.02.2020 | ||
FI | 05.02.2020 | ||
HR | 05.02.2020 | ||
LT | 05.02.2020 | ||
LV | 05.02.2020 | ||
NL | 05.02.2020 | ||
RO | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
SK | 05.02.2020 | ||
SM | 05.02.2020 | ||
BG | 05.05.2020 | ||
NO | 05.05.2020 | ||
GR | 06.05.2020 | ||
IS | 05.06.2020 | ||
PT | 28.06.2020 | ||
Former [2020/48] | DK | 05.02.2020 | |
ES | 05.02.2020 | ||
FI | 05.02.2020 | ||
HR | 05.02.2020 | ||
LT | 05.02.2020 | ||
LV | 05.02.2020 | ||
NL | 05.02.2020 | ||
RO | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
SM | 05.02.2020 | ||
BG | 05.05.2020 | ||
NO | 05.05.2020 | ||
GR | 06.05.2020 | ||
IS | 05.06.2020 | ||
PT | 28.06.2020 | ||
Former [2020/47] | DK | 05.02.2020 | |
ES | 05.02.2020 | ||
FI | 05.02.2020 | ||
HR | 05.02.2020 | ||
LT | 05.02.2020 | ||
LV | 05.02.2020 | ||
NL | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
BG | 05.05.2020 | ||
NO | 05.05.2020 | ||
GR | 06.05.2020 | ||
IS | 05.06.2020 | ||
PT | 28.06.2020 | ||
Former [2020/45] | FI | 05.02.2020 | |
HR | 05.02.2020 | ||
LV | 05.02.2020 | ||
NL | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
BG | 05.05.2020 | ||
NO | 05.05.2020 | ||
GR | 06.05.2020 | ||
IS | 05.06.2020 | ||
PT | 28.06.2020 | ||
Former [2020/40] | FI | 05.02.2020 | |
HR | 05.02.2020 | ||
LV | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
BG | 05.05.2020 | ||
NO | 05.05.2020 | ||
GR | 06.05.2020 | ||
IS | 05.06.2020 | ||
PT | 28.06.2020 | ||
Former [2020/39] | FI | 05.02.2020 | |
HR | 05.02.2020 | ||
LV | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
BG | 05.05.2020 | ||
NO | 05.05.2020 | ||
GR | 06.05.2020 | ||
PT | 28.06.2020 | ||
Former [2020/38] | FI | 05.02.2020 | |
HR | 05.02.2020 | ||
LV | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
NO | 05.05.2020 | ||
GR | 06.05.2020 | ||
PT | 28.06.2020 | ||
Former [2020/37] | FI | 05.02.2020 | |
HR | 05.02.2020 | ||
LV | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
NO | 05.05.2020 | ||
PT | 28.06.2020 | ||
Former [2020/35] | FI | 05.02.2020 | |
NO | 05.05.2020 | Cited in | International search | [A]DE20309694U (IFM ELECTRONIC GMBH [DE]) [A] 1-10 * figure 3a *; | [A]DE102013006397 (ABB TECHNOLOGY AG [CH]) [A] 1-10 * paragraph [0026]; figure 3 *; | [Y]DE112012005695T (HITACHI AUTOMOTIVE SYSTEMS LTD [JP]) [Y] 1-10 * figures 11, 18b *; | [A]US2014352423 (KURZ DANIEL R [US], et al) [A] 1-10* paragraph [0019]; figures 3A, 3B *; | [Y]US2015192442 (OLIN JOHN G [US]) [Y] 1-10 * paragraphs [0003] , [0 53] , [0 59]; figures 1A, 3, 4A, 4B * | Examination | EP0024327 | DE20309694U | US2011048564 | DE112012005695T |