EP3332068 - A FASTENING ELEMENT FOR FIXING A PLURALITY OF SOUND- ABSORBENT AND/OR SOUND-INSULATING PANELS TO AN UPRIGHT FOR REALISING A SOUND-ABSORBENT AND/OR SOUND-INSULATING BARRIER ALONG A COMMUNICATION PATHWAY, AND A RELATIVE SOUND-ABSORBENT AND/OR SOUND-INSULATING BARRIER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 23.04.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 15.05.2020 | ||
Former | Grant of patent is intended Status updated on 02.01.2020 | ||
Former | Examination is in progress Status updated on 16.04.2019 | ||
Former | Request for examination was made Status updated on 11.05.2018 | ||
Former | The international publication has been made Status updated on 11.02.2017 | ||
Former | unknown Status updated on 02.11.2016 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Cir Ambiente S.p.A. Via Molino Rosso 3-3/A 40026 Imola (Bologna) / IT | [2018/24] | Inventor(s) | 01 /
DAL PANE, Marco Via Biancanigo 1768 48014 Castel Bolognese (RA) / IT | 02 /
FABBRI, Fabio Via Mengozzi 34 47017 Rocca San Casciano (FC) / IT | [2018/24] | Representative(s) | Dall'Olio, Christian, et al INVENTION S.r.l. Via delle Armi, 1 40137 Bologna / IT | [2018/24] | Application number, filing date | 16763951.7 | 03.08.2016 | [2018/24] | WO2016IB54675 | Priority number, date | IT2015UB02840 | 04.08.2015 Original published format: IT UB20152840 | [2018/24] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017021899 | Date: | 09.02.2017 | Language: | EN | [2017/06] | Type: | A1 Application with search report | No.: | EP3332068 | Date: | 13.06.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 09.02.2017 takes the place of the publication of the European patent application. | [2018/24] | Type: | B1 Patent specification | No.: | EP3332068 | Date: | 17.06.2020 | Language: | EN | [2020/25] | Search report(s) | International search report - published on: | EP | 09.02.2017 | Classification | IPC: | E01F8/00 | [2018/24] | CPC: |
E01F8/0023 (EP);
E01F8/0011 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/24] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | BEFESTIGUNGSELEMENT ZUR BEFESTIGUNG MEHRERER SCHALLSCHLUCK- UND/ODER SCHALLISOLIERPLATTEN AN EINEM PFOSTEN ZUR HERSTELLUNG EINER SCHALLSCHLUCK- UND/ODER SCHALLISOLIERBARRIERE ENTLANG EINES KOMMUNIKATIONSWEGES UND ZUGEHÖRIGE SCHALLSCHLUCK- UND/ODER SCHALLISOLIERBARRIERE | [2018/24] | English: | A FASTENING ELEMENT FOR FIXING A PLURALITY OF SOUND- ABSORBENT AND/OR SOUND-INSULATING PANELS TO AN UPRIGHT FOR REALISING A SOUND-ABSORBENT AND/OR SOUND-INSULATING BARRIER ALONG A COMMUNICATION PATHWAY, AND A RELATIVE SOUND-ABSORBENT AND/OR SOUND-INSULATING BARRIER | [2018/24] | French: | ÉLÉMENT DE FIXATION DESTINÉ À LA FIXATION D'UNE PLURALITÉ DE PANNEAUX D'ABSORPTION ET/OU D'ISOLATION SONORE SUR UN MONTANT POUR RÉALISER UNE BARRIÈRE D'ABSORPTION ET/OU D'ISOLATION SONORE LE LONG D'UNE VOIE DE COMMUNICATION, BARRIÈRE D'ABSORPTION ET/OU D'ISOLATION SONORE CORRESPONDANTE | [2018/24] | Entry into regional phase | 28.02.2018 | National basic fee paid | 28.02.2018 | Designation fee(s) paid | 28.02.2018 | Examination fee paid | Examination procedure | 28.02.2018 | Examination requested [2018/24] | 28.02.2018 | Date on which the examining division has become responsible | 01.10.2018 | Amendment by applicant (claims and/or description) | 23.04.2019 | Despatch of a communication from the examining division (Time limit: M04) | 27.06.2019 | Reply to a communication from the examining division | 03.01.2020 | Communication of intention to grant the patent | 07.05.2020 | Fee for grant paid | 07.05.2020 | Fee for publishing/printing paid | 07.05.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 18.03.2021 | No opposition filed within time limit [2021/21] | Fees paid | Renewal fee | 02.08.2018 | Renewal fee patent year 03 | 20.08.2019 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.08.2016 | AL | 17.06.2020 | AT | 17.06.2020 | CY | 17.06.2020 | CZ | 17.06.2020 | DK | 17.06.2020 | EE | 17.06.2020 | ES | 17.06.2020 | FI | 17.06.2020 | HR | 17.06.2020 | LT | 17.06.2020 | LV | 17.06.2020 | MC | 17.06.2020 | MK | 17.06.2020 | MT | 17.06.2020 | NL | 17.06.2020 | PL | 17.06.2020 | RO | 17.06.2020 | RS | 17.06.2020 | SE | 17.06.2020 | SI | 17.06.2020 | SK | 17.06.2020 | SM | 17.06.2020 | TR | 17.06.2020 | IE | 03.08.2020 | LU | 03.08.2020 | FR | 17.08.2020 | BE | 31.08.2020 | CH | 31.08.2020 | LI | 31.08.2020 | BG | 17.09.2020 | GB | 17.09.2020 | NO | 17.09.2020 | GR | 18.09.2020 | IS | 17.10.2020 | PT | 19.10.2020 | DE | 02.03.2021 | [2022/32] |
Former [2022/27] | HU | 03.08.2016 | |
AL | 17.06.2020 | ||
AT | 17.06.2020 | ||
CY | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
MT | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
TR | 17.06.2020 | ||
IE | 03.08.2020 | ||
LU | 03.08.2020 | ||
FR | 17.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
BG | 17.09.2020 | ||
GB | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
DE | 02.03.2021 | ||
Former [2021/38] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
IE | 03.08.2020 | ||
LU | 03.08.2020 | ||
FR | 17.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
BG | 17.09.2020 | ||
GB | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
DE | 02.03.2021 | ||
Former [2021/37] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
IE | 03.08.2020 | ||
LU | 03.08.2020 | ||
FR | 17.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
DE | 02.03.2021 | ||
Former [2021/36] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
LU | 03.08.2020 | ||
FR | 17.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
DE | 02.03.2021 | ||
Former [2021/35] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
LU | 03.08.2020 | ||
FR | 17.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
DE | 02.03.2021 | ||
Former [2021/24] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
LU | 03.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/20] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
LU | 03.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/18] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/10] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/09] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
PT | 19.10.2020 | ||
Former [2021/04] | AL | 17.06.2020 | |
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2021/01] | FI | 17.06.2020 | |
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2020/51] | FI | 17.06.2020 | |
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2020/50] | FI | 17.06.2020 | |
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
SE | 17.06.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2020/48] | FI | 17.06.2020 | |
LT | 17.06.2020 | ||
SE | 17.06.2020 | ||
NO | 17.09.2020 | ||
Former [2020/47] | LT | 17.06.2020 | |
NO | 17.09.2020 | Cited in | International search | [A]JPS56144116U (N N) [A] 1* figures 1,4-8 *; | [A]WO2015019207 (CIR AMBIENTE S P A [IT]) [A] 1-11 * page 4, line 30 - page 6, line 23 * * page 8, line 9 - page 12, line 25; figures 1,2,4A-4C, 7 *; | [A]WO2015089586 (AUS GROUP ALLIANCE PTY LTD [AU]) [A] 1-11 * paragraphs [0097] - [0099]; figures 4A-4C, 5A-5D, 11-14 * |