blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3332068

EP3332068 - A FASTENING ELEMENT FOR FIXING A PLURALITY OF SOUND- ABSORBENT AND/OR SOUND-INSULATING PANELS TO AN UPRIGHT FOR REALISING A SOUND-ABSORBENT AND/OR SOUND-INSULATING BARRIER ALONG A COMMUNICATION PATHWAY, AND A RELATIVE SOUND-ABSORBENT AND/OR SOUND-INSULATING BARRIER [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  23.04.2021
Database last updated on 19.10.2024
FormerThe patent has been granted
Status updated on  15.05.2020
FormerGrant of patent is intended
Status updated on  02.01.2020
FormerExamination is in progress
Status updated on  16.04.2019
FormerRequest for examination was made
Status updated on  11.05.2018
FormerThe international publication has been made
Status updated on  11.02.2017
Formerunknown
Status updated on  02.11.2016
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Cir Ambiente S.p.A.
Via Molino Rosso 3-3/A
40026 Imola (Bologna) / IT
[2018/24]
Inventor(s)01 / DAL PANE, Marco
Via Biancanigo 1768
48014 Castel Bolognese (RA) / IT
02 / FABBRI, Fabio
Via Mengozzi 34
47017 Rocca San Casciano (FC) / IT
 [2018/24]
Representative(s)Dall'Olio, Christian, et al
INVENTION S.r.l. Via delle Armi, 1
40137 Bologna / IT
[2018/24]
Application number, filing date16763951.703.08.2016
[2018/24]
WO2016IB54675
Priority number, dateIT2015UB0284004.08.2015         Original published format: IT UB20152840
[2018/24]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017021899
Date:09.02.2017
Language:EN
[2017/06]
Type: A1 Application with search report 
No.:EP3332068
Date:13.06.2018
Language:EN
The application published by WIPO in one of the EPO official languages on 09.02.2017 takes the place of the publication of the European patent application.
[2018/24]
Type: B1 Patent specification 
No.:EP3332068
Date:17.06.2020
Language:EN
[2020/25]
Search report(s)International search report - published on:EP09.02.2017
ClassificationIPC:E01F8/00
[2018/24]
CPC:
E01F8/0023 (EP); E01F8/0011 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/24]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:BEFESTIGUNGSELEMENT ZUR BEFESTIGUNG MEHRERER SCHALLSCHLUCK- UND/ODER SCHALLISOLIERPLATTEN AN EINEM PFOSTEN ZUR HERSTELLUNG EINER SCHALLSCHLUCK- UND/ODER SCHALLISOLIERBARRIERE ENTLANG EINES KOMMUNIKATIONSWEGES UND ZUGEHÖRIGE SCHALLSCHLUCK- UND/ODER SCHALLISOLIERBARRIERE[2018/24]
English:A FASTENING ELEMENT FOR FIXING A PLURALITY OF SOUND- ABSORBENT AND/OR SOUND-INSULATING PANELS TO AN UPRIGHT FOR REALISING A SOUND-ABSORBENT AND/OR SOUND-INSULATING BARRIER ALONG A COMMUNICATION PATHWAY, AND A RELATIVE SOUND-ABSORBENT AND/OR SOUND-INSULATING BARRIER[2018/24]
French:ÉLÉMENT DE FIXATION DESTINÉ À LA FIXATION D'UNE PLURALITÉ DE PANNEAUX D'ABSORPTION ET/OU D'ISOLATION SONORE SUR UN MONTANT POUR RÉALISER UNE BARRIÈRE D'ABSORPTION ET/OU D'ISOLATION SONORE LE LONG D'UNE VOIE DE COMMUNICATION, BARRIÈRE D'ABSORPTION ET/OU D'ISOLATION SONORE CORRESPONDANTE[2018/24]
Entry into regional phase28.02.2018National basic fee paid 
28.02.2018Designation fee(s) paid 
28.02.2018Examination fee paid 
Examination procedure28.02.2018Examination requested  [2018/24]
28.02.2018Date on which the examining division has become responsible
01.10.2018Amendment by applicant (claims and/or description)
23.04.2019Despatch of a communication from the examining division (Time limit: M04)
27.06.2019Reply to a communication from the examining division
03.01.2020Communication of intention to grant the patent
07.05.2020Fee for grant paid
07.05.2020Fee for publishing/printing paid
07.05.2020Receipt of the translation of the claim(s)
Opposition(s)18.03.2021No opposition filed within time limit [2021/21]
Fees paidRenewal fee
02.08.2018Renewal fee patent year 03
20.08.2019Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU03.08.2016
AL17.06.2020
AT17.06.2020
CY17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
MK17.06.2020
MT17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
TR17.06.2020
IE03.08.2020
LU03.08.2020
FR17.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
BG17.09.2020
GB17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
DE02.03.2021
[2022/32]
Former [2022/27]HU03.08.2016
AL17.06.2020
AT17.06.2020
CY17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
MT17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
TR17.06.2020
IE03.08.2020
LU03.08.2020
FR17.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
BG17.09.2020
GB17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
DE02.03.2021
Former [2021/38]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
IE03.08.2020
LU03.08.2020
FR17.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
BG17.09.2020
GB17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
DE02.03.2021
Former [2021/37]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
IE03.08.2020
LU03.08.2020
FR17.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
DE02.03.2021
Former [2021/36]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
LU03.08.2020
FR17.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
DE02.03.2021
Former [2021/35]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
LU03.08.2020
FR17.08.2020
CH31.08.2020
LI31.08.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
DE02.03.2021
Former [2021/24]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
LU03.08.2020
CH31.08.2020
LI31.08.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/20]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SK17.06.2020
SM17.06.2020
LU03.08.2020
CH31.08.2020
LI31.08.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/18]AL17.06.2020
AT17.06.2020
CZ17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/10]AL17.06.2020
AT17.06.2020
CZ17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/09]AL17.06.2020
AT17.06.2020
CZ17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
PT19.10.2020
Former [2021/04]AL17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
RS17.06.2020
SE17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
Former [2021/01]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
RS17.06.2020
SE17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
Former [2020/51]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
RS17.06.2020
SE17.06.2020
NO17.09.2020
GR18.09.2020
Former [2020/50]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
SE17.06.2020
NO17.09.2020
GR18.09.2020
Former [2020/48]FI17.06.2020
LT17.06.2020
SE17.06.2020
NO17.09.2020
Former [2020/47]LT17.06.2020
NO17.09.2020
Cited inInternational search[A]JPS56144116U  (N N) [A] 1* figures 1,4-8 *;
 [A]WO2015019207  (CIR AMBIENTE S P A [IT]) [A] 1-11 * page 4, line 30 - page 6, line 23 * * page 8, line 9 - page 12, line 25; figures 1,2,4A-4C, 7 *;
 [A]WO2015089586  (AUS GROUP ALLIANCE PTY LTD [AU]) [A] 1-11 * paragraphs [0097] - [0099]; figures 4A-4C, 5A-5D, 11-14 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.