EP3279169 - CONCRETE REINFORCING MOLDED BODY, METHOD FOR MANUFACTURING SAME, PACKAGING STRUCTURE OF CONCRETE REINFORCING MOLDED BODY, AND METHOD FOR KNEADING FIBER REINFORCED CONCRETE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.06.2021 Database last updated on 19.07.2024 | |
Former | The patent has been granted Status updated on 17.07.2020 | ||
Former | Grant of patent is intended Status updated on 22.03.2020 | ||
Former | Request for examination was made Status updated on 05.01.2018 | ||
Former | The international publication has been made Status updated on 09.08.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Sumitomo Electric Industries, Ltd. 5-33 Kitahama 4-chome, Chuo-ku Osaka-shi, Osaka 541-0041 / JP | [2019/40] |
Former [2018/06] | For all designated states Sumitomo (SEI) Steel Wire Corp. 1-1, Koyakita 1-chome Itami-shi, Hyogo 664-0016 / JP | Inventor(s) | 01 /
YAMADA, Masato c/o Sumitomo (SEI) Steel Wire Corp. 1-1 Koyakita 1-chome Itami-shi Hyogo 664-0016 / JP | 02 /
MATSUBARA, Yoshiyuki c/o Sumitomo (SEI) Steel Wire Corp. 1-1 Koyakita 1-chome Itami-shi Hyogo 664-0016 / JP | 03 /
MATSUSHITA, Kiminori c/o Sumitomo (SEI) Steel Wire Corp. 1-1 Koyakita 1-chome Itami-shi Hyogo 664-0016 / JP | 04 /
TANAKA, Shuichi c/o Sumitomo (SEI) Steel Wire Corp. 1-1 Koyakita 1-chome Itami-shi Hyogo 664-0016 / JP | 05 /
OIKAWA, Masashi c/o Sumitomo (SEI) Steel Wire Corp. 1-1 Koyakita 1-chome Itami-shi Hyogo 664-0016 / JP | [2018/06] | Representative(s) | Boult Wade Tennant LLP Salisbury Square House 8 Salisbury Square London EC4Y 8AP / GB | [2020/34] |
Former [2018/06] | Boult Wade Tennant Verulam Gardens 70 Gray's Inn Road London WC1X 8BT / GB | Application number, filing date | 16771892.3 | 05.02.2016 | [2018/06] | WO2016JP53547 | Priority number, date | JP20150074795 | 01.04.2015 Original published format: JP 2015074795 | [2018/06] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016158008 | Date: | 06.10.2016 | Language: | JA | [2016/40] | Type: | A1 Application with search report | No.: | EP3279169 | Date: | 07.02.2018 | Language: | EN | [2018/06] | Type: | B1 Patent specification | No.: | EP3279169 | Date: | 19.08.2020 | Language: | EN | [2020/34] | Search report(s) | International search report - published on: | JP | 06.10.2016 | (Supplementary) European search report - dispatched on: | EP | 04.04.2018 | Classification | IPC: | C04B14/48, E04C5/07, E04C5/01, B28B1/52, B28C5/40 | [2018/18] | CPC: |
E04C5/012 (EP,US);
B28C5/402 (US);
B28B1/523 (US);
B28C7/06 (EP,US);
C04B14/48 (EP,US);
C04B20/00 (EP,US);
|
Former IPC [2018/06] | C04B20/00, B28C7/06, C04B14/48, E04C5/02, E04C5/07 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/06] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | BETONVERSTÄRKUNGSFORMKÖRPER, VERFAHREN ZUR HERSTELLUNG DAVON, VERPACKUNGSSTRUKTUR EINES BETONVERSTÄRKUNGSFORMKÖRPER UND VERFAHREN ZUM KNETEN VON FASERVERSTÄRKTEM BETON | [2018/06] | English: | CONCRETE REINFORCING MOLDED BODY, METHOD FOR MANUFACTURING SAME, PACKAGING STRUCTURE OF CONCRETE REINFORCING MOLDED BODY, AND METHOD FOR KNEADING FIBER REINFORCED CONCRETE | [2018/06] | French: | CORPS MOULÉ DE RENFORCEMENT DE BÉTON, PROCÉDÉ DE FABRICATION ASSOCIÉ, STRUCTURE D'EMBALLAGE DE CORPS MOULÉ DE RENFORCEMENT DE BÉTON ET PROCÉDÉ DE MALAXAGE DE BÉTON RENFORCÉ DE FIBRES | [2018/06] | Entry into regional phase | 08.08.2017 | Translation filed | 08.08.2017 | National basic fee paid | 08.08.2017 | Search fee paid | 08.08.2017 | Designation fee(s) paid | 08.08.2017 | Examination fee paid | Examination procedure | 08.08.2017 | Examination requested [2018/06] | 08.08.2017 | Date on which the examining division has become responsible | 19.06.2018 | Amendment by applicant (claims and/or description) | 23.03.2020 | Communication of intention to grant the patent | 07.07.2020 | Fee for grant paid | 07.07.2020 | Fee for publishing/printing paid | 07.07.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 20.05.2021 | No opposition filed within time limit [2021/30] | Fees paid | Renewal fee | 22.02.2018 | Renewal fee patent year 03 | 13.02.2019 | Renewal fee patent year 04 | 13.02.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.02.2016 | AL | 19.08.2020 | CY | 19.08.2020 | CZ | 19.08.2020 | DK | 19.08.2020 | EE | 19.08.2020 | FI | 19.08.2020 | HR | 19.08.2020 | LT | 19.08.2020 | LV | 19.08.2020 | MC | 19.08.2020 | MK | 19.08.2020 | PL | 19.08.2020 | RO | 19.08.2020 | RS | 19.08.2020 | SE | 19.08.2020 | SI | 19.08.2020 | SK | 19.08.2020 | SM | 19.08.2020 | BG | 19.11.2020 | NO | 19.11.2020 | GR | 20.11.2020 | IS | 19.12.2020 | PT | 21.12.2020 | IE | 05.02.2021 | LU | 05.02.2021 | [2024/22] |
Former [2023/33] | HU | 05.02.2016 | |
AL | 19.08.2020 | ||
CY | 19.08.2020 | ||
CZ | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
MC | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SI | 19.08.2020 | ||
SK | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
PT | 21.12.2020 | ||
IE | 05.02.2021 | ||
LU | 05.02.2021 | ||
Former [2023/30] | AL | 19.08.2020 | |
CY | 19.08.2020 | ||
CZ | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
MC | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SI | 19.08.2020 | ||
SK | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
PT | 21.12.2020 | ||
IE | 05.02.2021 | ||
LU | 05.02.2021 | ||
Former [2022/07] | AL | 19.08.2020 | |
CZ | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
MC | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SI | 19.08.2020 | ||
SK | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
PT | 21.12.2020 | ||
IE | 05.02.2021 | ||
LU | 05.02.2021 | ||
Former [2021/47] | AL | 19.08.2020 | |
CZ | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
MC | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SI | 19.08.2020 | ||
SK | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
PT | 21.12.2020 | ||
LU | 05.02.2021 | ||
Former [2021/41] | AL | 19.08.2020 | |
CZ | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
MC | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SI | 19.08.2020 | ||
SK | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
PT | 21.12.2020 | ||
Former [2021/36] | AL | 19.08.2020 | |
CZ | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SI | 19.08.2020 | ||
SK | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
PT | 21.12.2020 | ||
Former [2021/28] | AL | 19.08.2020 | |
CZ | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SK | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
PT | 21.12.2020 | ||
Former [2021/25] | AL | 19.08.2020 | |
CZ | 19.08.2020 | ||
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
PT | 21.12.2020 | ||
Former [2021/22] | CZ | 19.08.2020 | |
DK | 19.08.2020 | ||
EE | 19.08.2020 | ||
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
PL | 19.08.2020 | ||
RO | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
SM | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
PT | 21.12.2020 | ||
Former [2021/21] | DK | 19.08.2020 | |
FI | 19.08.2020 | ||
HR | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
PL | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
PT | 21.12.2020 | ||
Former [2021/10] | FI | 19.08.2020 | |
HR | 19.08.2020 | ||
LT | 19.08.2020 | ||
LV | 19.08.2020 | ||
PL | 19.08.2020 | ||
RS | 19.08.2020 | ||
SE | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
IS | 19.12.2020 | ||
PT | 21.12.2020 | ||
Former [2021/09] | FI | 19.08.2020 | |
LT | 19.08.2020 | ||
SE | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
GR | 20.11.2020 | ||
PT | 21.12.2020 | ||
Former [2021/08] | FI | 19.08.2020 | |
LT | 19.08.2020 | ||
SE | 19.08.2020 | ||
BG | 19.11.2020 | ||
NO | 19.11.2020 | ||
PT | 21.12.2020 | ||
Former [2021/07] | FI | 19.08.2020 | |
LT | 19.08.2020 | ||
NO | 19.11.2020 | Documents cited: | Search | [XA]EP0557617 (BEKAERT SA NV [BE]) [X] 1,2,4,8,11 * column 1, line 8 - line 22; figure - * * column 4, line 28 - column 5, line 27; figure - * [A] 3,5-7,9,10; | [XAI]WO0049211 (GRACE W R & CO [US], et al) [X] 1,8 * abstract * [A] 6,7,9-11 [I] 2-5; | [A]WO0181265 (GRACE W R & CO [US]) [A] 1-11* page 14, line 4 - line 15; figure 1 *; | [XAI]US6797370 (BECHTOLDT CHRISTIAN [DE], et al) [X] 1,4,8 * column 3, line 50 - column 4, line 50; figure - * [A] 6,7,9-11 [I] 2,3,5; | [XI]FR2916440 (SIKA FRANCE [FR]) [X] 1,8-11 * page 5, line 14 - page 10, paragraph l; figure - * [I] 2-7; | [X]JP2011256080 (TAIHEIYO CEMENT CORP) [X] 1,2,4,8,9 * abstract * | International search | [A]JPS58151362 (AIDA ENG LTD) [A] 3, 5-7* , page 3, upper left column, line 6 to page 7, upper left column, line 10 & EP 87496 A1 page 2, line 10 to page 14, line 37 & DE 3267172 D & SU 1333241 A & DD 208385 A & AT 16274 T & AT 16274 E *; | [XA]EP0557617 (BEKAERT SA NV [BE]) [X] 1, 2, 4, 8, 10, 11 * , column 1, line 1 to column 5, line 26 (Family: none) * [A] 3, 5-7; | [XA]JP2011256080 (TAIHEIYO CEMENT CORP) [X] 1, 2, 4, 8, 9 * , paragraphs [0007] to [0042] (Family: none) * [A] 3, 5-7 |