EP3275139 - TECHNOLOGIES FOR NETWORK PACKET PACING DURING SEGMENTATION OPERATIONS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.09.2021 Database last updated on 21.05.2024 | |
Former | The patent has been granted Status updated on 16.10.2020 | ||
Former | Grant of patent is intended Status updated on 07.06.2020 | ||
Former | Examination is in progress Status updated on 11.09.2019 | ||
Former | Request for examination was made Status updated on 29.12.2017 | ||
Former | The international publication has been made Status updated on 07.11.2016 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Intel Corporation 2200 Mission College Boulevard Santa Clara, CA 95054 / US | [2018/05] | Inventor(s) | 01 /
BRANDEBURG, Jesse C. 14008 NW Harbor Lane Portland, Oregon 97229 / US | 02 /
DUBAL, Scott P. 17889 SW Bryan Way Beaverton, Oregon 97007 / US | 03 /
CONNOR, Patrick 7853SW 174th. Place Beaverton, Oregon 97007 / US | 04 /
COHEN, David E. 14 Holbrook Avenue Hull, Massachusetts 02045 / US | [2018/05] | Representative(s) | Rummler, Felix, et al Maucher Jenkins Seventh Floor Offices Artillery House 11-19 Artillery Row London SW1P 1RT / GB | [N/P] |
Former [2020/47] | Rummler, Felix, et al Maucher Jenkins 26 Caxton Street London SW1H 0RJ / GB | ||
Former [2018/05] | Rummler, Felix, et al Maucher Jenkins 26 Caxton Street London SW1H 0RJ / GB | Application number, filing date | 16773678.4 | 26.02.2016 | [2018/05] | WO2016US19802 | Priority number, date | US201514671776 | 27.03.2015 Original published format: US201514671776 | [2018/05] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016160212 | Date: | 06.10.2016 | Language: | EN | [2016/40] | Type: | A1 Application with search report | No.: | EP3275139 | Date: | 31.01.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 06.10.2016 takes the place of the publication of the European patent application. | [2018/05] | Type: | B1 Patent specification | No.: | EP3275139 | Date: | 18.11.2020 | Language: | EN | [2020/47] | Search report(s) | International search report - published on: | KR | 06.10.2016 | (Supplementary) European search report - dispatched on: | EP | 17.10.2018 | Classification | IPC: | H04L12/801, // H04L12/815, H04L12/805 | [2020/24] | CPC: |
H04L47/12 (EP,US);
H04L47/22 (EP,US);
H04L47/36 (EP,US);
H04L43/0864 (EP,US)
|
Former IPC [2018/46] | H04L12/801, // H04L12/815 | ||
Former IPC [2018/05] | H04L12/811, H04L12/805, H04L12/841 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/05] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | TECHNOLOGIEN ZUR NETZPAKETÜBERTRAGUNGSSTUFENSTEUERUNG WÄHREND SEGMENTIERUNGSOPERATIONEN | [2018/05] | English: | TECHNOLOGIES FOR NETWORK PACKET PACING DURING SEGMENTATION OPERATIONS | [2018/05] | French: | TECHNOLOGIES POUR UNE SYNCHRONISATION DE PAQUETS DE RÉSEAU DURANT DES OPÉRATIONS DE SEGMENTATION | [2018/05] | Entry into regional phase | 05.09.2017 | National basic fee paid | 05.09.2017 | Search fee paid | 05.09.2017 | Designation fee(s) paid | 05.09.2017 | Examination fee paid | Examination procedure | 05.09.2017 | Examination requested [2018/05] | 05.09.2017 | Date on which the examining division has become responsible | 15.05.2019 | Amendment by applicant (claims and/or description) | 16.09.2019 | Despatch of a communication from the examining division (Time limit: M04) | 21.01.2020 | Reply to a communication from the examining division | 08.06.2020 | Communication of intention to grant the patent | 08.10.2020 | Fee for grant paid | 08.10.2020 | Fee for publishing/printing paid | 08.10.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 19.08.2021 | No opposition filed within time limit [2021/43] | Fees paid | Renewal fee | 14.02.2018 | Renewal fee patent year 03 | 13.02.2019 | Renewal fee patent year 04 | 13.02.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.02.2016 | AL | 18.11.2020 | AT | 18.11.2020 | CY | 18.11.2020 | CZ | 18.11.2020 | DK | 18.11.2020 | EE | 18.11.2020 | ES | 18.11.2020 | FI | 18.11.2020 | HR | 18.11.2020 | IT | 18.11.2020 | LT | 18.11.2020 | LV | 18.11.2020 | MC | 18.11.2020 | MK | 18.11.2020 | NL | 18.11.2020 | PL | 18.11.2020 | RO | 18.11.2020 | RS | 18.11.2020 | SE | 18.11.2020 | SI | 18.11.2020 | SK | 18.11.2020 | SM | 18.11.2020 | BG | 18.02.2021 | NO | 18.02.2021 | GR | 19.02.2021 | GB | 26.02.2021 | IE | 26.02.2021 | LU | 26.02.2021 | BE | 28.02.2021 | CH | 28.02.2021 | FR | 28.02.2021 | LI | 28.02.2021 | IS | 18.03.2021 | PT | 18.03.2021 | [2024/22] |
Former [2023/33] | HU | 26.02.2016 | |
AL | 18.11.2020 | ||
AT | 18.11.2020 | ||
CY | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
GB | 26.02.2021 | ||
IE | 26.02.2021 | ||
LU | 26.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2023/30] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CY | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
GB | 26.02.2021 | ||
IE | 26.02.2021 | ||
LU | 26.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2022/34] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
GB | 26.02.2021 | ||
IE | 26.02.2021 | ||
LU | 26.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2022/23] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
GB | 26.02.2021 | ||
IE | 26.02.2021 | ||
LU | 26.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2022/10] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
GB | 26.02.2021 | ||
IE | 26.02.2021 | ||
LU | 26.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
PT | 18.03.2021 | ||
Former [2022/08] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
GB | 26.02.2021 | ||
IE | 26.02.2021 | ||
LU | 26.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2022/07] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IE | 26.02.2021 | ||
LU | 26.02.2021 | ||
CH | 28.02.2021 | ||
FR | 28.02.2021 | ||
LI | 28.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/50] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
LU | 26.02.2021 | ||
CH | 28.02.2021 | ||
LI | 28.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/48] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
LU | 26.02.2021 | ||
CH | 28.02.2021 | ||
LI | 28.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/46] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
LU | 26.02.2021 | ||
CH | 28.02.2021 | ||
LI | 28.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/45] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/41] | AT | 18.11.2020 | |
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/37] | AT | 18.11.2020 | |
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/36] | AT | 18.11.2020 | |
CZ | 18.11.2020 | ||
EE | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/35] | AT | 18.11.2020 | |
CZ | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/34] | AT | 18.11.2020 | |
CZ | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/33] | AT | 18.11.2020 | |
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/32] | AT | 18.11.2020 | |
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/28] | AT | 18.11.2020 | |
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/25] | AT | 18.11.2020 | |
FI | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/23] | AT | 18.11.2020 | |
FI | 18.11.2020 | ||
LV | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
PT | 18.03.2021 | ||
Former [2021/22] | FI | 18.11.2020 | |
RS | 18.11.2020 | ||
NO | 18.02.2021 | ||
PT | 18.03.2021 | ||
Former [2021/21] | FI | 18.11.2020 | |
PT | 18.03.2021 | ||
Former [2021/20] | FI | 18.11.2020 | Documents cited: | Search | [Y]US6115357 (PACKER ROBERT L [US], et al) [Y] 3,9,11 * abstract * * column 5, line 17 - column 6, line 30 * * column 6, line 42 - line 65; figure 3 *; | [A]US6888848 (BESHAI MAGED E [CA], et al) [A] 1-15* column 4, line 35 - line 61 *; | [XYI]US2009086729 (SARANGAM PARTHASARATHY [US], et al) [X] 1,2,4,7,8,10,12,14,15 * paragraph [0014]; figure 2 * * paragraph [0027] - paragraph [0033]; figure 4 * [Y] 3,9,11 [I] 3,5,6,9,11,13 | International search | [Y]US6115357 (PACKER ROBERT L [US], et al) [Y] 4-5, 14, 16 * See column 5, line 54 - column 6, line 40; claim 1; and figure 2B. *; | [A]US2007174511 (YU CHING [US], et al) [A] 1-24 * See paragraphs [0007], [0016], [0034]-[0050]; and figure 2. *; | [A]US2013279338 (MEHROTRA SANJEEV [US], et al) [A] 1-24* See paragraphs [0004], [0042]-[0047], [0080]-[0084]; and figure 6. *; | [Y]WO2015014833 (ALCATEL LUCENT [FR]) [Y] 1-24 * See page 4, lines 4-6; page 7, lines 24-30; and figure 2. *; | [Y] - ZUBIN DITTIA, "Integrated Hardware/Software Design of a High Performance Net work Interface", (20010500), URL: http://www.arl.wustl.edu/Publications/2000-04/zDittia-2001.pdf, (20160418), XP055318312 [Y] 1-24 * See page 15, lines 7-9; page 16, lines 20-30; page 17, lines 5-20; page 45, lines 10-15; page 49, lines 24-27; page 53, lines 12-13; page 93, lines 7-9, page 102, line 31 - page 103, line 18. * | by applicant | US6115357 | US2009086729 |