blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3337316

EP3337316 - CUSTOM SIZE HORSE SHOE HAVING INTEGRATED LIGHT-WEIGHT STRUCTURE AND GENERATIVE PRODUCTION METHOD THEREFOR [Right-click to bookmark this link]
Former [2018/26]CUSTOM HORSESHOE WITH INTEGRATED LIGHTWEIGHT STRUCTURE AND GENERATIVE PRODUCTION METHOD THEREFOR
[2019/27]
StatusNo opposition filed within time limit
Status updated on  11.09.2020
Database last updated on 20.09.2024
FormerThe patent has been granted
Status updated on  04.10.2019
FormerGrant of patent is intended
Status updated on  23.06.2019
FormerRequest for examination was made
Status updated on  25.05.2018
FormerThe international publication has been made
Status updated on  25.02.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Rosswag GmbH
August-Rosswag-Strasse 1
76327 Pfinztal / DE
[2018/26]
Inventor(s)01 / DONISI, Sven
Schauinslandstrasse 6
76327 Pfinztal / DE
02 / GRAF, Gregor
Bockstalstraße 36
76327 Pfinztal / DE
 [2018/27]
Former [2018/26]01 / DONISI, Sven
Schauinslandstrasse 6
76327 Pfinztal / DE
02 / GRAF, Gregor
Bockstalstrasse 26
76327 Pfinztal / DE
Representative(s)Mehl-Mikus, Claudia
mepat Patentanwälte
Dr. Mehl-Mikus, Goy, Dr. Drobnik PartG mbB
Eisenlohrstraße 31
76135 Karlsruhe / DE
[2018/26]
Application number, filing date16774851.618.08.2016
[2018/26]
WO2016EP01407
Priority number, dateDE2015101060718.08.2015         Original published format: DE102015010607
[2018/26]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2017028957
Date:23.02.2017
Language:DE
[2017/08]
Type: A1 Application with search report 
No.:EP3337316
Date:27.06.2018
Language:DE
The application published by WIPO in one of the EPO official languages on 23.02.2017 takes the place of the publication of the European patent application.
[2018/26]
Type: B1 Patent specification 
No.:EP3337316
Date:06.11.2019
Language:DE
[2019/45]
Search report(s)International search report - published on:EP23.02.2017
ClassificationIPC:A01L1/00
[2018/26]
CPC:
A01L1/00 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/26]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:MASS-HUFEISEN MIT INTEGRIERTER LEICHTBAUSTRUKTUR UND GENERATIVES FERTIGUNGSVERFAHREN DAFÜR[2018/26]
English:CUSTOM SIZE HORSE SHOE HAVING INTEGRATED LIGHT-WEIGHT STRUCTURE AND GENERATIVE PRODUCTION METHOD THEREFOR[2019/27]
French:FER À CHEVAL À STRUCTURE LÉGÈRE INTÉGRÉE ET PROCÉDÉ DE FABRICATION GÉNÉRATIF CORRESPONDANT[2019/27]
Former [2018/26]CUSTOM HORSESHOE WITH INTEGRATED LIGHTWEIGHT STRUCTURE AND GENERATIVE PRODUCTION METHOD THEREFOR
Former [2018/26]FER À CHEVAL DE RÉFÉRENCE À STRUCTURE LÉGÈRE INTÉGRÉE ET PROCÉDÉ DE PRODUCTION GÉNÉRATIVE ASSOCIÉ
Entry into regional phase30.01.2018National basic fee paid 
30.01.2018Designation fee(s) paid 
30.01.2018Examination fee paid 
Examination procedure19.06.2017Request for preliminary examination filed
International Preliminary Examining Authority: EP
16.03.2018Examination requested  [2018/26]
16.03.2018Date on which the examining division has become responsible
24.06.2019Communication of intention to grant the patent
25.09.2019Fee for grant paid
25.09.2019Fee for publishing/printing paid
25.09.2019Receipt of the translation of the claim(s)
Opposition(s)07.08.2020No opposition filed within time limit [2020/42]
Fees paidRenewal fee
14.08.2018Renewal fee patent year 03
22.08.2019Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU18.08.2016
AL06.11.2019
CY06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
FI06.11.2019
HR06.11.2019
LT06.11.2019
LV06.11.2019
MC06.11.2019
MK06.11.2019
MT06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
SI06.11.2019
SK06.11.2019
SM06.11.2019
TR06.11.2019
BG06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
[2022/32]
Former [2022/27]HU18.08.2016
AL06.11.2019
CY06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
FI06.11.2019
HR06.11.2019
LT06.11.2019
LV06.11.2019
MC06.11.2019
MT06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
SI06.11.2019
SK06.11.2019
SM06.11.2019
TR06.11.2019
BG06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2021/18]AL06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
FI06.11.2019
HR06.11.2019
LT06.11.2019
LV06.11.2019
MC06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
SI06.11.2019
SK06.11.2019
SM06.11.2019
BG06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/51]AL06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
FI06.11.2019
HR06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
SI06.11.2019
SK06.11.2019
SM06.11.2019
BG06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/37]AL06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
FI06.11.2019
HR06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
SK06.11.2019
SM06.11.2019
BG06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/36]AL06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
FI06.11.2019
HR06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
BG06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/35]AL06.11.2019
CZ06.11.2019
FI06.11.2019
HR06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
BG06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/32]AL06.11.2019
FI06.11.2019
HR06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
RS06.11.2019
BG06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/25]FI06.11.2019
HR06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
RS06.11.2019
BG06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/24]FI06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
BG06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/23]FI06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
BG06.02.2020
GR07.02.2020
PT06.03.2020
Former [2020/22]FI06.11.2019
LT06.11.2019
BG06.02.2020
PT06.03.2020
Cited inInternational search[A]DE2308228  (ERNST & CO KG) [A] 1* the whole document *;
 [Y]WO9203770  (BAUR ANDREAS [DE]) [Y] 8-10,12 * abstract * * page 3 * * pages 6-9 * * figure 1 *;
 [Y]WO2013067285  (FOUR SCORNED LLC [US]) [Y] 7,12 * abstract * * pages 4-6 * * figure 1 *;
 [XAY]US2014262353  (BERGELEEN LYLE EUGENE [US], et al) [X] 1,2,5,6 * abstract * * paragraphs [0013] , [0015] , [0019] , [0020] , [0105] , [0117] , [0129] , [0133] - [0136] - [0140] , [0142] , [0143] * * claims 1,5,17,18,28,29 * * figures 2A-2KC * [A] 3,4,11 [Y] 7-10,12
by applicantDE4027057
 FR2973644
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.