EP3276889 - STATE REPORT CONTROL METHOD AND APPARATUS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 29.04.2022 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 21.05.2021 | ||
Former | Grant of patent is intended Status updated on 05.04.2021 | ||
Former | Examination is in progress Status updated on 20.05.2020 | ||
Former | Request for examination was made Status updated on 29.12.2017 | ||
Former | The international publication has been made Status updated on 28.10.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states ZTE Corporation ZTE Plaza, Keji Road South Hi-Tech Industrial Park Nanshan Shenzhen, Guangdong 518057 / CN | [2021/25] |
Former [2018/05] | For all designated states ZTE Corporation ZTE Plaza, Keji Road South Hi-Tech Industrial Park Nanshan Shenzhen, Guangdong 518057 / CN | Inventor(s) | 01 /
LU, Gang c/o ZTE CORPORATION ZTE Plaza Keji Road South Hi-Tech Industrial Park, Nanshan Shenzhen Guangdong 518057 / CN | [2018/05] | Representative(s) | Regimbeau 20, rue de Chazelles 75847 Paris Cedex 17 / FR | [2018/05] | Application number, filing date | 16776093.3 | 01.04.2016 | [2018/05] | WO2016CN78331 | Priority number, date | CN201510169411 | 10.04.2015 Original published format: CN201510169411 | [2018/05] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016161918 | Date: | 13.10.2016 | Language: | ZH | [2016/41] | Type: | A1 Application with search report | No.: | EP3276889 | Date: | 31.01.2018 | Language: | EN | [2018/05] | Type: | B1 Patent specification | No.: | EP3276889 | Date: | 23.06.2021 | Language: | EN | [2021/25] | Search report(s) | International search report - published on: | CN | 13.10.2016 | (Supplementary) European search report - dispatched on: | EP | 12.10.2018 | Classification | IPC: | H04L12/70, H04L12/717, H04L12/715 | [2018/46] | CPC: |
H04L45/42 (EP);
H04L47/783 (US);
H04L45/44 (US);
H04L47/125 (US);
H04L47/22 (US);
H04L47/825 (US);
|
Former IPC [2018/05] | H04L12/70 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/05] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR STATUSBERICHTSKONTROLLE | [2018/05] | English: | STATE REPORT CONTROL METHOD AND APPARATUS | [2018/05] | French: | PROCÉDÉ ET APPAREIL DE COMMANDE DE RAPPORT D'ÉTAT | [2018/05] | Entry into regional phase | 27.10.2017 | Translation filed | 27.10.2017 | National basic fee paid | 27.10.2017 | Search fee paid | 27.10.2017 | Designation fee(s) paid | 27.10.2017 | Examination fee paid | Examination procedure | 27.10.2017 | Examination requested [2018/05] | 27.10.2017 | Date on which the examining division has become responsible | 03.05.2019 | Amendment by applicant (claims and/or description) | 27.05.2020 | Despatch of a communication from the examining division (Time limit: M04) | 01.10.2020 | Reply to a communication from the examining division | 06.04.2021 | Communication of intention to grant the patent | 17.05.2021 | Fee for grant paid | 17.05.2021 | Fee for publishing/printing paid | 17.05.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 24.03.2022 | No opposition filed within time limit [2022/22] | Fees paid | Renewal fee | 28.03.2018 | Renewal fee patent year 03 | 26.03.2019 | Renewal fee patent year 04 | 30.03.2020 | Renewal fee patent year 05 | 24.03.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 01.04.2016 | AL | 23.06.2021 | AT | 23.06.2021 | CY | 23.06.2021 | CZ | 23.06.2021 | DK | 23.06.2021 | EE | 23.06.2021 | ES | 23.06.2021 | FI | 23.06.2021 | HR | 23.06.2021 | IT | 23.06.2021 | LT | 23.06.2021 | LV | 23.06.2021 | MC | 23.06.2021 | MK | 23.06.2021 | MT | 23.06.2021 | NL | 23.06.2021 | PL | 23.06.2021 | RO | 23.06.2021 | RS | 23.06.2021 | SE | 23.06.2021 | SI | 23.06.2021 | SK | 23.06.2021 | SM | 23.06.2021 | TR | 23.06.2021 | BG | 23.09.2021 | NO | 23.09.2021 | GR | 24.09.2021 | IS | 23.10.2021 | PT | 25.10.2021 | [2024/42] |
Former [2024/29] | HU | 01.04.2016 | |
AL | 23.06.2021 | ||
AT | 23.06.2021 | ||
CY | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
IT | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
MK | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
TR | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2024/22] | HU | 01.04.2016 | |
AL | 23.06.2021 | ||
AT | 23.06.2021 | ||
CY | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
IT | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
MK | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2024/20] | HU | 01.04.2016 | |
AL | 23.06.2021 | ||
AT | 23.06.2021 | ||
CY | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
IT | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2024/18] | HU | 01.04.2016 | |
AL | 23.06.2021 | ||
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
IT | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2023/06] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
IT | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/36] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
IT | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/29] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/26] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/21] | AT | 23.06.2021 | |
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/10] | AT | 23.06.2021 | |
CZ | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/09] | AT | 23.06.2021 | |
CZ | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
NL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
PT | 25.10.2021 | ||
Former [2022/08] | AT | 23.06.2021 | |
CZ | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
NL | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
Former [2022/07] | AT | 23.06.2021 | |
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
NL | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
Former [2021/51] | FI | 23.06.2021 | |
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
Former [2021/49] | FI | 23.06.2021 | |
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
SE | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
Former [2021/47] | FI | 23.06.2021 | |
LT | 23.06.2021 | ||
BG | 23.09.2021 | ||
Former [2021/46] | FI | 23.06.2021 | |
LT | 23.06.2021 | Documents cited: | Search | [X]US8885463 (MEDVED JAN [US], et al) [X] 1-15 * column 2, line 29 - column 3, line 42; figures 5-9 * * column 7, line 4 - column 11, line 58 * * column 12, line 32 - column 13, line 26 *; | [X] - CRABBE GOOGLE E ET AL, "PCEP Extensions for Stateful PCE; draft-ietf-pce-stateful-pce-06.txt", PCEP EXTENSIONS FOR STATEFUL PCE; DRAFT-IETF-PCE-STATEFUL-PCE-06.TXT, INTERNET ENGINEERING TASK FORCE, IETF; STANDARDWORKINGDRAFT, INTERNET SOCIETY (ISOC) 4, RUE DES FALAISES CH- 1205 GENEVA, SWITZERLAND, (20130820), pages 1 - 54, XP015093525 [X] 1-15 * paragraph [Section 4 "New Functions to Support Stateful PCEs"] * * paragraph [Section 5.5 "LSP Delegation"] * | International search | [A]CN1592252 (HUAWEI TECH CO LTD [CN]) [A] 1-17 * , the whole document *; | [A]CN101986622 (ZTE CORP) [A] 1-17 * , the whole document *; | [A]US2013336159 (PREVIDI STEFANO [IT], et al) [A] 1-17 * , the whole document *; | [A]CN103516602 (JUNIPER NETWORKS INC) [A] 1-17 * , description, paragraphs [0086]-[0090] *; | [A] - CRABBE, E. et al., "PCEP EXTENSIONS FOR PCE-INITIATED LSP SETUP IN A STATEFUL PCE MODEL", (20141025), URL: draft-ietf-pce-pce-initiated-lsp-02, XP015085400 [A] 1-17 * , the whole document * |