| EP3282314 - PROJECTOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.03.2022 Database last updated on 19.03.2026 | |
| Former | The patent has been granted Status updated on 09.04.2021 | ||
| Former | Grant of patent is intended Status updated on 12.01.2021 | ||
| Former | Request for examination was made Status updated on 12.01.2018 | ||
| Former | The international publication has been made Status updated on 20.10.2017 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Seiko Epson Corporation 1-6, Shinjuku 4-chome Shinjuku-ku Tokyo 160-8801 / JP | [2019/33] |
| Former [2018/07] | For all designated states Seiko Epson Corporation 1-6, Shinjuku 4-chome Shinjuku-ku Tokyo 160-881 / JP | Inventor(s) | 01 /
NAKAMURA, Kentaro c/o SEIKO EPSON CORPORATION 3-5 Owa 3-chome Suwa-shi, Nagano 392-8502 / JP | 02 /
NAGATANI, Kaname c/o SEIKO EPSON CORPORATION 3-5 Owa 3-chome Suwa-shi, Nagano 392-8502 / JP | [2018/07] | Representative(s) | Miller Sturt Kenyon 9 John Street London WC1N 2ES / GB | [2018/07] | Application number, filing date | 16776295.4 | 07.04.2016 | [2018/07] | WO2016JP01940 | Priority number, date | JP20150079498 | 08.04.2015 Original published format: JP 2015079498 | [2018/07] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016163124 | Date: | 13.10.2016 | Language: | JA | [2016/41] | Type: | A1 Application with search report | No.: | EP3282314 | Date: | 14.02.2018 | Language: | EN | [2018/07] | Type: | B1 Patent specification | No.: | EP3282314 | Date: | 12.05.2021 | Language: | EN | [2021/19] | Search report(s) | International search report - published on: | JP | 13.10.2016 | (Supplementary) European search report - dispatched on: | EP | 09.10.2018 | Classification | IPC: | G03B21/16, F25B21/02, F25D17/02, F25D17/06, G03B21/00, H04N5/74, H05K7/20 | [2018/07] | CPC: |
G03B21/16 (EP,US);
F25B21/02 (EP,US);
F25B21/04 (US);
F25D17/02 (US);
F25D17/06 (US);
F28D7/0066 (US);
F28F9/26 (US);
G03B21/00 (US);
G03B21/145 (US);
H04N5/74 (US);
H04N9/3144 (EP);
H04N9/3167 (EP);
H05K7/20 (US);
F25B2321/0212 (EP);
F25B2321/0252 (EP);
G03B21/006 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/07] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | PROJEKTOR | [2018/07] | English: | PROJECTOR | [2018/07] | French: | PROJECTEUR | [2018/07] | Entry into regional phase | 19.10.2017 | Translation filed | 08.11.2017 | National basic fee paid | 08.11.2017 | Search fee paid | 08.11.2017 | Designation fee(s) paid | 08.11.2017 | Examination fee paid | Examination procedure | 19.10.2017 | Date on which the examining division has become responsible | 08.11.2017 | Examination requested [2018/07] | 18.04.2019 | Amendment by applicant (claims and/or description) | 13.01.2021 | Communication of intention to grant the patent | 18.03.2021 | Fee for grant paid | 18.03.2021 | Fee for publishing/printing paid | 18.03.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 15.02.2022 | No opposition filed within time limit [2022/16] | Fees paid | Renewal fee | 30.04.2018 | Renewal fee patent year 03 | 02.04.2019 | Renewal fee patent year 04 | 02.03.2020 | Renewal fee patent year 05 | 01.04.2021 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.04.2016 | AL | 12.05.2021 | AT | 12.05.2021 | CY | 12.05.2021 | CZ | 12.05.2021 | DK | 12.05.2021 | EE | 12.05.2021 | ES | 12.05.2021 | FI | 12.05.2021 | HR | 12.05.2021 | IT | 12.05.2021 | LT | 12.05.2021 | LV | 12.05.2021 | MC | 12.05.2021 | MK | 12.05.2021 | MT | 12.05.2021 | NL | 12.05.2021 | PL | 12.05.2021 | RO | 12.05.2021 | RS | 12.05.2021 | SE | 12.05.2021 | SI | 12.05.2021 | SK | 12.05.2021 | SM | 12.05.2021 | TR | 12.05.2021 | BG | 12.08.2021 | NO | 12.08.2021 | GR | 13.08.2021 | IS | 12.09.2021 | PT | 13.09.2021 | [2026/04] |
| Former [2024/42] | HU | 07.04.2016 | |
| AL | 12.05.2021 | ||
| AT | 12.05.2021 | ||
| CY | 12.05.2021 | ||
| CZ | 12.05.2021 | ||
| DK | 12.05.2021 | ||
| EE | 12.05.2021 | ||
| ES | 12.05.2021 | ||
| FI | 12.05.2021 | ||
| HR | 12.05.2021 | ||
| IT | 12.05.2021 | ||
| LT | 12.05.2021 | ||
| LV | 12.05.2021 | ||
| MC | 12.05.2021 | ||
| MK | 12.05.2021 | ||
| MT | 12.05.2021 | ||
| NL | 12.05.2021 | ||
| PL | 12.05.2021 | ||
| RO | 12.05.2021 | ||
| RS | 12.05.2021 | ||
| SE | 12.05.2021 | ||
| SI | 12.05.2021 | ||
| SK | 12.05.2021 | ||
| SM | 12.05.2021 | ||
| BG | 12.08.2021 | ||
| NO | 12.08.2021 | ||
| GR | 13.08.2021 | ||
| IS | 12.09.2021 | ||
| PT | 13.09.2021 | ||
| Former [2024/22] | HU | 07.04.2016 | |
| AL | 12.05.2021 | ||
| AT | 12.05.2021 | ||
| CY | 12.05.2021 | ||
| CZ | 12.05.2021 | ||
| DK | 12.05.2021 | ||
| EE | 12.05.2021 | ||
| ES | 12.05.2021 | ||
| FI | 12.05.2021 | ||
| HR | 12.05.2021 | ||
| IT | 12.05.2021 | ||
| LT | 12.05.2021 | ||
| LV | 12.05.2021 | ||
| MC | 12.05.2021 | ||
| MK | 12.05.2021 | ||
| NL | 12.05.2021 | ||
| PL | 12.05.2021 | ||
| RO | 12.05.2021 | ||
| RS | 12.05.2021 | ||
| SE | 12.05.2021 | ||
| SI | 12.05.2021 | ||
| SK | 12.05.2021 | ||
| SM | 12.05.2021 | ||
| BG | 12.08.2021 | ||
| NO | 12.08.2021 | ||
| GR | 13.08.2021 | ||
| IS | 12.09.2021 | ||
| PT | 13.09.2021 | ||
| Former [2024/20] | HU | 07.04.2016 | |
| AL | 12.05.2021 | ||
| AT | 12.05.2021 | ||
| CY | 12.05.2021 | ||
| CZ | 12.05.2021 | ||
| DK | 12.05.2021 | ||
| EE | 12.05.2021 | ||
| ES | 12.05.2021 | ||
| FI | 12.05.2021 | ||
| HR | 12.05.2021 | ||
| IT | 12.05.2021 | ||
| LT | 12.05.2021 | ||
| LV | 12.05.2021 | ||
| MC | 12.05.2021 | ||
| NL | 12.05.2021 | ||
| PL | 12.05.2021 | ||
| RO | 12.05.2021 | ||
| RS | 12.05.2021 | ||
| SE | 12.05.2021 | ||
| SI | 12.05.2021 | ||
| SK | 12.05.2021 | ||
| SM | 12.05.2021 | ||
| BG | 12.08.2021 | ||
| NO | 12.08.2021 | ||
| GR | 13.08.2021 | ||
| IS | 12.09.2021 | ||
| PT | 13.09.2021 | ||
| Former [2024/18] | HU | 07.04.2016 | |
| AL | 12.05.2021 | ||
| AT | 12.05.2021 | ||
| CZ | 12.05.2021 | ||
| DK | 12.05.2021 | ||
| EE | 12.05.2021 | ||
| ES | 12.05.2021 | ||
| FI | 12.05.2021 | ||
| HR | 12.05.2021 | ||
| IT | 12.05.2021 | ||
| LT | 12.05.2021 | ||
| LV | 12.05.2021 | ||
| MC | 12.05.2021 | ||
| NL | 12.05.2021 | ||
| PL | 12.05.2021 | ||
| RO | 12.05.2021 | ||
| RS | 12.05.2021 | ||
| SE | 12.05.2021 | ||
| SI | 12.05.2021 | ||
| SK | 12.05.2021 | ||
| SM | 12.05.2021 | ||
| BG | 12.08.2021 | ||
| NO | 12.08.2021 | ||
| GR | 13.08.2021 | ||
| IS | 12.09.2021 | ||
| PT | 13.09.2021 | ||
| Former [2023/06] | AL | 12.05.2021 | |
| AT | 12.05.2021 | ||
| CZ | 12.05.2021 | ||
| DK | 12.05.2021 | ||
| EE | 12.05.2021 | ||
| ES | 12.05.2021 | ||
| FI | 12.05.2021 | ||
| HR | 12.05.2021 | ||
| IT | 12.05.2021 | ||
| LT | 12.05.2021 | ||
| LV | 12.05.2021 | ||
| MC | 12.05.2021 | ||
| NL | 12.05.2021 | ||
| PL | 12.05.2021 | ||
| RO | 12.05.2021 | ||
| RS | 12.05.2021 | ||
| SE | 12.05.2021 | ||
| SI | 12.05.2021 | ||
| SK | 12.05.2021 | ||
| SM | 12.05.2021 | ||
| BG | 12.08.2021 | ||
| NO | 12.08.2021 | ||
| GR | 13.08.2021 | ||
| IS | 12.09.2021 | ||
| PT | 13.09.2021 | ||
| Former [2022/36] | AL | 12.05.2021 | |
| AT | 12.05.2021 | ||
| CZ | 12.05.2021 | ||
| DK | 12.05.2021 | ||
| EE | 12.05.2021 | ||
| ES | 12.05.2021 | ||
| FI | 12.05.2021 | ||
| HR | 12.05.2021 | ||
| IT | 12.05.2021 | ||
| LT | 12.05.2021 | ||
| LV | 12.05.2021 | ||
| NL | 12.05.2021 | ||
| PL | 12.05.2021 | ||
| RO | 12.05.2021 | ||
| RS | 12.05.2021 | ||
| SE | 12.05.2021 | ||
| SI | 12.05.2021 | ||
| SK | 12.05.2021 | ||
| SM | 12.05.2021 | ||
| BG | 12.08.2021 | ||
| NO | 12.08.2021 | ||
| GR | 13.08.2021 | ||
| IS | 12.09.2021 | ||
| PT | 13.09.2021 | ||
| Former [2022/29] | AL | 12.05.2021 | |
| AT | 12.05.2021 | ||
| CZ | 12.05.2021 | ||
| DK | 12.05.2021 | ||
| EE | 12.05.2021 | ||
| ES | 12.05.2021 | ||
| FI | 12.05.2021 | ||
| HR | 12.05.2021 | ||
| LT | 12.05.2021 | ||
| LV | 12.05.2021 | ||
| NL | 12.05.2021 | ||
| PL | 12.05.2021 | ||
| RO | 12.05.2021 | ||
| RS | 12.05.2021 | ||
| SE | 12.05.2021 | ||
| SI | 12.05.2021 | ||
| SK | 12.05.2021 | ||
| SM | 12.05.2021 | ||
| BG | 12.08.2021 | ||
| NO | 12.08.2021 | ||
| GR | 13.08.2021 | ||
| IS | 12.09.2021 | ||
| PT | 13.09.2021 | ||
| Former [2022/26] | AL | 12.05.2021 | |
| AT | 12.05.2021 | ||
| CZ | 12.05.2021 | ||
| DK | 12.05.2021 | ||
| EE | 12.05.2021 | ||
| ES | 12.05.2021 | ||
| FI | 12.05.2021 | ||
| HR | 12.05.2021 | ||
| LT | 12.05.2021 | ||
| LV | 12.05.2021 | ||
| NL | 12.05.2021 | ||
| PL | 12.05.2021 | ||
| RO | 12.05.2021 | ||
| RS | 12.05.2021 | ||
| SE | 12.05.2021 | ||
| SK | 12.05.2021 | ||
| SM | 12.05.2021 | ||
| BG | 12.08.2021 | ||
| NO | 12.08.2021 | ||
| GR | 13.08.2021 | ||
| IS | 12.09.2021 | ||
| PT | 13.09.2021 | ||
| Former [2022/23] | AT | 12.05.2021 | |
| CZ | 12.05.2021 | ||
| DK | 12.05.2021 | ||
| EE | 12.05.2021 | ||
| ES | 12.05.2021 | ||
| FI | 12.05.2021 | ||
| HR | 12.05.2021 | ||
| LT | 12.05.2021 | ||
| LV | 12.05.2021 | ||
| NL | 12.05.2021 | ||
| PL | 12.05.2021 | ||
| RO | 12.05.2021 | ||
| RS | 12.05.2021 | ||
| SE | 12.05.2021 | ||
| SK | 12.05.2021 | ||
| SM | 12.05.2021 | ||
| BG | 12.08.2021 | ||
| NO | 12.08.2021 | ||
| GR | 13.08.2021 | ||
| IS | 12.09.2021 | ||
| PT | 13.09.2021 | ||
| Former [2022/10] | AT | 12.05.2021 | |
| CZ | 12.05.2021 | ||
| DK | 12.05.2021 | ||
| EE | 12.05.2021 | ||
| ES | 12.05.2021 | ||
| FI | 12.05.2021 | ||
| HR | 12.05.2021 | ||
| LT | 12.05.2021 | ||
| LV | 12.05.2021 | ||
| NL | 12.05.2021 | ||
| PL | 12.05.2021 | ||
| RO | 12.05.2021 | ||
| RS | 12.05.2021 | ||
| SE | 12.05.2021 | ||
| SK | 12.05.2021 | ||
| SM | 12.05.2021 | ||
| BG | 12.08.2021 | ||
| NO | 12.08.2021 | ||
| GR | 13.08.2021 | ||
| PT | 13.09.2021 | ||
| IS | 22.12.2021 | ||
| Former [2022/09] | AT | 12.05.2021 | |
| CZ | 12.05.2021 | ||
| DK | 12.05.2021 | ||
| ES | 12.05.2021 | ||
| FI | 12.05.2021 | ||
| HR | 12.05.2021 | ||
| LT | 12.05.2021 | ||
| LV | 12.05.2021 | ||
| NL | 12.05.2021 | ||
| PL | 12.05.2021 | ||
| RO | 12.05.2021 | ||
| RS | 12.05.2021 | ||
| SE | 12.05.2021 | ||
| SK | 12.05.2021 | ||
| SM | 12.05.2021 | ||
| BG | 12.08.2021 | ||
| NO | 12.08.2021 | ||
| GR | 13.08.2021 | ||
| IS | 12.09.2021 | ||
| PT | 13.09.2021 | ||
| Former [2022/08] | AT | 12.05.2021 | |
| CZ | 12.05.2021 | ||
| DK | 12.05.2021 | ||
| ES | 12.05.2021 | ||
| FI | 12.05.2021 | ||
| HR | 12.05.2021 | ||
| LT | 12.05.2021 | ||
| LV | 12.05.2021 | ||
| NL | 12.05.2021 | ||
| PL | 12.05.2021 | ||
| RS | 12.05.2021 | ||
| SE | 12.05.2021 | ||
| SM | 12.05.2021 | ||
| BG | 12.08.2021 | ||
| NO | 12.08.2021 | ||
| GR | 13.08.2021 | ||
| IS | 12.09.2021 | ||
| PT | 13.09.2021 | ||
| Former [2022/07] | AT | 12.05.2021 | |
| FI | 12.05.2021 | ||
| HR | 12.05.2021 | ||
| LT | 12.05.2021 | ||
| LV | 12.05.2021 | ||
| NL | 12.05.2021 | ||
| PL | 12.05.2021 | ||
| RS | 12.05.2021 | ||
| SE | 12.05.2021 | ||
| SM | 12.05.2021 | ||
| BG | 12.08.2021 | ||
| NO | 12.08.2021 | ||
| GR | 13.08.2021 | ||
| IS | 12.09.2021 | ||
| PT | 13.09.2021 | ||
| Former [2022/04] | AT | 12.05.2021 | |
| FI | 12.05.2021 | ||
| HR | 12.05.2021 | ||
| LT | 12.05.2021 | ||
| LV | 12.05.2021 | ||
| NL | 12.05.2021 | ||
| PL | 12.05.2021 | ||
| RS | 12.05.2021 | ||
| SE | 12.05.2021 | ||
| BG | 12.08.2021 | ||
| NO | 12.08.2021 | ||
| GR | 13.08.2021 | ||
| IS | 12.09.2021 | ||
| PT | 13.09.2021 | ||
| Former [2021/52] | AT | 12.05.2021 | |
| FI | 12.05.2021 | ||
| HR | 12.05.2021 | ||
| LT | 12.05.2021 | ||
| LV | 12.05.2021 | ||
| PL | 12.05.2021 | ||
| RS | 12.05.2021 | ||
| SE | 12.05.2021 | ||
| BG | 12.08.2021 | ||
| NO | 12.08.2021 | ||
| GR | 13.08.2021 | ||
| IS | 12.09.2021 | ||
| PT | 13.09.2021 | ||
| Former [2021/51] | AT | 12.05.2021 | |
| FI | 12.05.2021 | ||
| HR | 12.05.2021 | ||
| LT | 12.05.2021 | ||
| LV | 12.05.2021 | ||
| RS | 12.05.2021 | ||
| SE | 12.05.2021 | ||
| BG | 12.08.2021 | ||
| NO | 12.08.2021 | ||
| GR | 13.08.2021 | ||
| IS | 12.09.2021 | ||
| PT | 13.09.2021 | ||
| Former [2021/50] | AT | 12.05.2021 | |
| FI | 12.05.2021 | ||
| HR | 12.05.2021 | ||
| LT | 12.05.2021 | ||
| LV | 12.05.2021 | ||
| SE | 12.05.2021 | ||
| BG | 12.08.2021 | ||
| NO | 12.08.2021 | ||
| GR | 13.08.2021 | ||
| PT | 13.09.2021 | ||
| Former [2021/49] | AT | 12.05.2021 | |
| FI | 12.05.2021 | ||
| HR | 12.05.2021 | ||
| LT | 12.05.2021 | ||
| LV | 12.05.2021 | ||
| SE | 12.05.2021 | ||
| BG | 12.08.2021 | ||
| NO | 12.08.2021 | ||
| GR | 13.08.2021 | ||
| Former [2021/47] | AT | 12.05.2021 | |
| FI | 12.05.2021 | ||
| LT | 12.05.2021 | ||
| BG | 12.08.2021 | ||
| Former [2021/46] | AT | 12.05.2021 | |
| FI | 12.05.2021 | ||
| LT | 12.05.2021 | Documents cited: | Search | [Y] JP2009075236 (SANYO ELECTRIC CO et al.) [Y] 1-9 * figures 1-14 * | [Y] US2009237619 (YANAGISAWA YOSHIYUKI et al.) [Y] 1-9 * figures 1-16 * | International search | [Y] JP2009075236 (SANYO ELECTRIC CO et al.) [Y] 1-9 * , paragraphs [0021] to [0091]; fig. 1, 4 to 6, 10 (Family: none) * | [Y] WO2013157417 (KEENUSDESIGN CORP et al.) [Y] 1-9 * , paragraphs [0011] to [0029]; fig. 1 & US 2015/0107272 A1 paragraphs [0024] to [0041]; fig. 1 * | [Y] JP2005121250 (SEIKO EPSON CORP et al.) [Y] 7-8 * , paragraph [0054]; fig. 10 (Family: none) * | [Y] JP2010048885 (SANYO ELECTRIC CO et al.) [Y] 8 * , paragraph [0044]; fig. 3 to 4 (Family: none) * | [A] WO2009150850 (PANASONIC CORP et al.) [A] 1-9 * , paragraphs [0026] to [0099]; fig. 3 & US 2011/0032489 A1 paragraphs [0062] to [0135]; fig. 3 & CN 102057328 A * | [A] JP2009237365 (SANYO ELECTRIC CO et al.) [A] 1-9 * , paragraphs [0024] to [0059]; fig. 2 & US 2011/0037954 A1 paragraphs [0268] to [0286]; fig. 7 & EP 2256548 A1 & CN 101978319 A * | [A] JP2011075797 (SANYO ELECTRIC CO et al.) [A] 1-9 * , paragraphs [0010] to [0027]; fig. 1 (Family: none) * | [A] JP2008176079 (HITACHI LTD et al.) [A] 1-9 * , paragraphs [0019] to [0076]; fig. 1 to 2 & CN 101227812 A * | Examination | US2010045940 |