| EP3341108 - METHOD AND DEVICE FOR ARRANGING A GAS FILTER ON A COMPONENT OF A RECIPIENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.02.2021 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 28.02.2020 | ||
| Former | Grant of patent is intended Status updated on 23.10.2019 | ||
| Former | Request for examination was made Status updated on 01.06.2018 | ||
| Former | The international publication has been made Status updated on 04.03.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states SAC 02 NV Veldeken 29 9850 Deinze / BE | [2020/23] |
| Former [2018/27] | For all designated states SAC 02 NV Veldeken 38B 9850 Nevele / BE | Inventor(s) | 01 /
VAN DE HEYNING, Roel Luc Twaalfkameren 50 9000 Gent / BE | [2018/27] | Representative(s) | D'Halleweyn, Nele Veerle Trees Gertrudis, et al Arnold & Siedsma Bezuidenhoutseweg 57 2594 AC The Hague / NL | [2018/27] | Application number, filing date | 16778185.5 | 22.08.2016 | [2018/27] | WO2016BE00041 | Priority number, date | BE20150005523 | 24.08.2015 Original published format: BE 201505523 | [2018/27] | Filing language | NL | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017031557 | Date: | 02.03.2017 | Language: | EN | [2017/09] | Type: | A1 Application with search report | No.: | EP3341108 | Date: | 04.07.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 02.03.2017 takes the place of the publication of the European patent application. | [2018/27] | Type: | B1 Patent specification | No.: | EP3341108 | Date: | 01.04.2020 | Language: | EN | [2020/14] | Search report(s) | International search report - published on: | EP | 02.03.2017 | Classification | IPC: | B01D46/10, B29C65/08, B29L31/14, B29C65/78, B29C67/00, B01D46/00 | [2019/44] | CPC: |
B01D46/0001 (EP,US);
B01D46/14 (US);
B29C65/7882 (EP,US);
B29C66/4722 (EP,US);
B01D2265/04 (EP,US);
B01D46/10 (EP,US);
B29C2793/0018 (EP,US);
B29C2793/0081 (EP,US);
B29C65/08 (EP,US);
B29C66/02241 (EP,US);
B29C66/1122 (EP,US);
B29C66/5326 (EP,US);
|
| Former IPC [2018/27] | B01D46/10, B29C65/08, B29L31/14, B29C65/78, B29C67/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/27] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUM ANORDNEN EINES GASFILTERS AN EINEM BAUTEIL EINER AUFNAHME | [2018/27] | English: | METHOD AND DEVICE FOR ARRANGING A GAS FILTER ON A COMPONENT OF A RECIPIENT | [2018/27] | French: | PROCÉDÉ ET DISPOSITIF POUR DISPOSER UN FILTRE À GAZ SUR UN ÉLÉMENT DE RÉCIPIENT | [2018/27] | Entry into regional phase | 14.03.2018 | National basic fee paid | 14.03.2018 | Designation fee(s) paid | 14.03.2018 | Examination fee paid | Examination procedure | 26.06.2017 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 14.03.2018 | Examination requested [2018/27] | 14.03.2018 | Date on which the examining division has become responsible | 20.09.2018 | Amendment by applicant (claims and/or description) | 24.10.2019 | Communication of intention to grant the patent | 20.02.2020 | Fee for grant paid | 20.02.2020 | Fee for publishing/printing paid | 20.02.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 12.01.2021 | No opposition filed within time limit [2021/11] | Fees paid | Renewal fee | 27.08.2018 | Renewal fee patent year 03 | 27.08.2019 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 01.04.2020 | AT | 01.04.2020 | CY | 01.04.2020 | CZ | 01.04.2020 | EE | 01.04.2020 | FI | 01.04.2020 | HR | 01.04.2020 | LT | 01.04.2020 | LV | 01.04.2020 | MC | 01.04.2020 | MK | 01.04.2020 | MT | 01.04.2020 | RO | 01.04.2020 | RS | 01.04.2020 | SE | 01.04.2020 | SI | 01.04.2020 | SK | 01.04.2020 | SM | 01.04.2020 | BG | 01.07.2020 | NO | 01.07.2020 | GR | 02.07.2020 | IS | 01.08.2020 | PT | 17.08.2020 | [2022/32] |
| Former [2022/28] | AL | 01.04.2020 | |
| AT | 01.04.2020 | ||
| CY | 01.04.2020 | ||
| CZ | 01.04.2020 | ||
| EE | 01.04.2020 | ||
| FI | 01.04.2020 | ||
| HR | 01.04.2020 | ||
| LT | 01.04.2020 | ||
| LV | 01.04.2020 | ||
| MC | 01.04.2020 | ||
| MT | 01.04.2020 | ||
| RO | 01.04.2020 | ||
| RS | 01.04.2020 | ||
| SE | 01.04.2020 | ||
| SI | 01.04.2020 | ||
| SK | 01.04.2020 | ||
| SM | 01.04.2020 | ||
| BG | 01.07.2020 | ||
| NO | 01.07.2020 | ||
| GR | 02.07.2020 | ||
| IS | 01.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2021/24] | AL | 01.04.2020 | |
| AT | 01.04.2020 | ||
| CZ | 01.04.2020 | ||
| EE | 01.04.2020 | ||
| FI | 01.04.2020 | ||
| HR | 01.04.2020 | ||
| LT | 01.04.2020 | ||
| LV | 01.04.2020 | ||
| MC | 01.04.2020 | ||
| RO | 01.04.2020 | ||
| RS | 01.04.2020 | ||
| SE | 01.04.2020 | ||
| SI | 01.04.2020 | ||
| SK | 01.04.2020 | ||
| SM | 01.04.2020 | ||
| BG | 01.07.2020 | ||
| NO | 01.07.2020 | ||
| GR | 02.07.2020 | ||
| IS | 01.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2021/18] | AL | 01.04.2020 | |
| AT | 01.04.2020 | ||
| CZ | 01.04.2020 | ||
| EE | 01.04.2020 | ||
| FI | 01.04.2020 | ||
| HR | 01.04.2020 | ||
| LT | 01.04.2020 | ||
| LV | 01.04.2020 | ||
| MC | 01.04.2020 | ||
| RO | 01.04.2020 | ||
| RS | 01.04.2020 | ||
| SE | 01.04.2020 | ||
| SK | 01.04.2020 | ||
| SM | 01.04.2020 | ||
| BG | 01.07.2020 | ||
| NO | 01.07.2020 | ||
| GR | 02.07.2020 | ||
| IS | 01.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2021/10] | AL | 01.04.2020 | |
| AT | 01.04.2020 | ||
| CZ | 01.04.2020 | ||
| EE | 01.04.2020 | ||
| FI | 01.04.2020 | ||
| HR | 01.04.2020 | ||
| LT | 01.04.2020 | ||
| LV | 01.04.2020 | ||
| RO | 01.04.2020 | ||
| RS | 01.04.2020 | ||
| SE | 01.04.2020 | ||
| SK | 01.04.2020 | ||
| SM | 01.04.2020 | ||
| BG | 01.07.2020 | ||
| NO | 01.07.2020 | ||
| GR | 02.07.2020 | ||
| IS | 01.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2021/08] | AL | 01.04.2020 | |
| CZ | 01.04.2020 | ||
| FI | 01.04.2020 | ||
| HR | 01.04.2020 | ||
| LT | 01.04.2020 | ||
| LV | 01.04.2020 | ||
| RO | 01.04.2020 | ||
| RS | 01.04.2020 | ||
| SE | 01.04.2020 | ||
| SM | 01.04.2020 | ||
| BG | 01.07.2020 | ||
| NO | 01.07.2020 | ||
| GR | 02.07.2020 | ||
| IS | 01.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2021/04] | AL | 01.04.2020 | |
| CZ | 01.04.2020 | ||
| FI | 01.04.2020 | ||
| HR | 01.04.2020 | ||
| LT | 01.04.2020 | ||
| LV | 01.04.2020 | ||
| RS | 01.04.2020 | ||
| SE | 01.04.2020 | ||
| BG | 01.07.2020 | ||
| NO | 01.07.2020 | ||
| GR | 02.07.2020 | ||
| IS | 01.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2020/51] | CZ | 01.04.2020 | |
| FI | 01.04.2020 | ||
| HR | 01.04.2020 | ||
| LT | 01.04.2020 | ||
| LV | 01.04.2020 | ||
| RS | 01.04.2020 | ||
| SE | 01.04.2020 | ||
| BG | 01.07.2020 | ||
| NO | 01.07.2020 | ||
| GR | 02.07.2020 | ||
| IS | 01.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2020/50] | CZ | 01.04.2020 | |
| FI | 01.04.2020 | ||
| HR | 01.04.2020 | ||
| LT | 01.04.2020 | ||
| LV | 01.04.2020 | ||
| SE | 01.04.2020 | ||
| BG | 01.07.2020 | ||
| NO | 01.07.2020 | ||
| GR | 02.07.2020 | ||
| IS | 01.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2020/49] | CZ | 01.04.2020 | |
| FI | 01.04.2020 | ||
| LT | 01.04.2020 | ||
| SE | 01.04.2020 | ||
| BG | 01.07.2020 | ||
| NO | 01.07.2020 | ||
| IS | 01.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2020/48] | FI | 01.04.2020 | |
| LT | 01.04.2020 | ||
| SE | 01.04.2020 | ||
| BG | 01.07.2020 | ||
| NO | 01.07.2020 | ||
| IS | 01.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2020/47] | LT | 01.04.2020 | |
| BG | 01.07.2020 | ||
| NO | 01.07.2020 | ||
| IS | 01.08.2020 | ||
| Former [2020/46] | BG | 01.07.2020 | |
| IS | 01.08.2020 | ||
| Former [2020/39] | BG | 01.07.2020 | Cited in | International search | [XI] US4318406 (MCLEOD PATRICK H et al.) | [XAI] US4120715 (OCKWELL MALCOLM CHARLES et al.) | [XI] WO9422557 (MINNESOTA MINING & MFG et al.) [X] 1,3,4,9,10,15,18,20,24 * column 1, line 44 - column 19; figures 1-2 *[I] 2,5-8,11-14,17,21-23 | [XAI] US5997614 (TUMA DANIEL L et al.) [X] 1,15,16,18,20,24,25,28,29,33-35 * column 1, line 43 - column 2, line 29; figures 1,2; claims 1,2 *[A] 2-14 [I] 17,19,21-23,26,27,30-32,36-38 | by applicant | US4318406 | US4120715 |