blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3291624

EP3291624 - TERMINAL DEVICE, BASE STATION DEVICE, COMMUNICATION METHOD, AND INTEGRATED CIRCUIT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  16.07.2021
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  07.08.2020
FormerGrant of patent is intended
Status updated on  02.04.2020
FormerRequest for examination was made
Status updated on  07.03.2020
FormerGrant of patent is intended
Status updated on  08.01.2020
FormerRequest for examination was made
Status updated on  02.02.2018
FormerThe international publication has been made
Status updated on  04.11.2016
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
Sharp Kabushiki Kaisha
1, Takumi-cho
Sakai-ku
Sakai City, Osaka 590-8522 / JP
[2018/10]
Inventor(s)01 / AIBA, Tatsushi
c/o Sharp Kabushiki Kaisha
1, Takumi-cho
Sakai-ku
Sakai City, Osaka 590-8522 / JP
02 / SUZUKI, Shoichi
c/o Sharp Kabushiki Kaisha
1, Takumi-cho
Sakai-ku
Sakai City, Osaka 590-8522 / JP
03 / YOKOMAKURA, Kazunari
c/o Sharp Kabushiki Kaisha
1, Takumi-cho
Sakai-ku
Sakai City, Osaka 590-8522 / JP
04 / TAKAHASHI, Hiroki
c/o Sharp Kabushiki Kaisha
1, Takumi-cho
Sakai-ku
Sakai City, Osaka 590-8522 / JP
 [2018/10]
Representative(s)Müller-Boré & Partner Patentanwälte PartG mbB
Friedenheimer Brücke 21
80639 München / DE
[2018/10]
Application number, filing date16786450.325.04.2016
[2018/10]
WO2016JP62924
Priority number, dateJP2015009091228.04.2015         Original published format: JP 2015090912
[2018/10]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2016175173
Date:03.11.2016
Language:JA
[2016/44]
Type: A1 Application with search report 
No.:EP3291624
Date:07.03.2018
Language:EN
[2018/10]
Type: B1 Patent specification 
No.:EP3291624
Date:09.09.2020
Language:EN
[2020/37]
Search report(s)International search report - published on:JP03.11.2016
(Supplementary) European search report - dispatched on:EP30.01.2019
ClassificationIPC:H04L1/00, H04L1/18
[2019/09]
CPC:
H04L1/0026 (EP,US); H04W72/23 (US); H04J11/00 (EP,US);
H04L1/1861 (EP,US); H04L5/001 (US); H04W24/10 (EP,US);
H04W28/04 (EP,US); H04W72/04 (EP,US); H04L1/1671 (EP,US) (-)
Former IPC [2018/10]H04W72/04, H04J11/00, H04W24/10, H04W28/04
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/10]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:ENDGERÄTEVORRICHTUNG, BASISSTATIONSVORRICHTUNG, KOMMUNIKATIONSVERFAHREN UND INTEGRIERTE SCHALTUNG[2018/10]
English:TERMINAL DEVICE, BASE STATION DEVICE, COMMUNICATION METHOD, AND INTEGRATED CIRCUIT[2018/10]
French:DISPOSITIF TERMINAL, STATION DE BASE, PROCÉDÉ DE COMMUNICATION ET CIRCUIT INTÉGRÉ[2018/10]
Entry into regional phase23.10.2017Translation filed 
26.10.2017National basic fee paid 
26.10.2017Search fee paid 
26.10.2017Designation fee(s) paid 
26.10.2017Examination fee paid 
Examination procedure23.10.2017Date on which the examining division has become responsible
26.10.2017Examination requested  [2018/10]
23.08.2019Amendment by applicant (claims and/or description)
09.01.2020Communication of intention to grant the patent
03.03.2020Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
03.04.2020Communication of intention to grant the patent
28.07.2020Receipt of the translation of the claim(s)
30.07.2020Fee for grant paid
30.07.2020Fee for publishing/printing paid
Opposition(s)10.06.2021No opposition filed within time limit [2021/33]
Fees paidRenewal fee
23.04.2018Renewal fee patent year 03
23.04.2019Renewal fee patent year 04
27.04.2020Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU25.04.2016
AL09.09.2020
AT09.09.2020
CY09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
MK09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
NL23.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE25.04.2021
LU25.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
[2024/22]
Former [2023/30]HU25.04.2016
AL09.09.2020
AT09.09.2020
CY09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
NL23.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE25.04.2021
LU25.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
Former [2023/29]HU25.04.2016
AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
NL23.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE25.04.2021
LU25.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
Former [2023/27]HU25.04.2016
AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE25.04.2021
LU25.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
Former [2022/34]AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE25.04.2021
LU25.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
Former [2022/23]AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE25.04.2021
LU25.04.2021
CH30.04.2021
LI30.04.2021
Former [2022/21]AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
PT11.01.2021
IE25.04.2021
LU25.04.2021
CH30.04.2021
LI30.04.2021
Former [2022/10]AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
PT11.01.2021
LU25.04.2021
CH30.04.2021
LI30.04.2021
Former [2022/04]AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
LU25.04.2021
Former [2021/50]AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/48]AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/37]AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/36]AL09.09.2020
AT09.09.2020
CZ09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/28]AL09.09.2020
AT09.09.2020
CZ09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/25]AL09.09.2020
AT09.09.2020
CZ09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/23]AT09.09.2020
CZ09.09.2020
EE09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
PT11.01.2021
Former [2021/22]CZ09.09.2020
EE09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
PT11.01.2021
Former [2021/21]FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RS09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
PT11.01.2021
Former [2021/10]FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RS09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
Former [2021/09]FI09.09.2020
LT09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
Former [2021/08]FI09.09.2020
LT09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
Former [2021/07]FI09.09.2020
LT09.09.2020
NO09.12.2020
Documents cited:Search[I]EP2760171  (LG ELECTRONICS INC [KR]) [I] 1-8 * abstract * * page 6, paragraph 50 - page 8, paragraph 82 * * page 14, paragraph 140 - page 19, paragraph 156 * * page 23, paragraph 206 - page 24, paragraph 218 * * tables 1,5-9 *;
 [A]  - SAMSUNG, "HARQ-ACK and Periodic CSI Multiplexing using PUCCH Format 3", vol. RAN WG1, no. San Diego, USA; 20121008 - 20121012, (20120929), 3GPP DRAFT; R1-124359 A_N_CSI, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_70b/Docs/, (20120929), XP050662256 [A] 1-8 * the whole document *
International search[Y]  - INTEL CORPORATION, "Remaining details of Multi- cell HARQ-ACK and Periodic CSI Multiplexing for PUCCH format 3", 3GPP TSG-RAN WG1#70b R1-124110, (20120929), URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_70b/Docs/R1-124110.zip, XP050662019 [Y] 1-14
 [Y]  - CMCC, "Discussion on PUCCH design for CA enhancement", 3GPP TSG-RAN WG1#80b R1-152024, (20150411), URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_80b/Docs/R1-152024.zip, XP050934873 [Y] 1-14
 [Y]  - ALCATEL -LUCENT et al., "PUCCH design for A/N feedbacks on PCell up to 32 carrier aggregation[ online", 3GPP TSG-RAN WG1#80b R1-151326, (20150411), URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_80b/Docs/R1-151326.zip, XP050934205 [Y] 1-14
 [Y]  - ERICSSON, "PUCCH resource allocation for HARQ- ACK", 3GPP TSG-RAN WG1#80b R1-151801, (20150410), URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_80b/Docs/R1-151801.zip, XP050934662 [Y] 4, 5, 9, 10
 [Y]  - NOKIA NETWORKS, "Dynamic adaptation of HARQ-ACK feedback size and PUCCH format", 3GPP TSG-RAN WG1#80b R1-151838, (20150410), URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_80b/Docs/Rl-151838.zip, XP050934698 [Y] 4, 5, 9, 10
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.