EP3370498 - LONGITUDINAL LEAF STRIPPER AND CORRESPONDING BEET HARVESTING MACHINE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 14.10.2022 Database last updated on 18.11.2024 | |
Former | The patent has been granted Status updated on 05.11.2021 | ||
Former | Grant of patent is intended Status updated on 10.02.2021 | ||
Former | Examination is in progress Status updated on 22.01.2021 | ||
Former | Grant of patent is intended Status updated on 17.11.2020 | ||
Former | Examination is in progress Status updated on 11.12.2019 | ||
Former | Request for examination was made Status updated on 10.08.2018 | ||
Former | The international publication has been made Status updated on 13.05.2017 | ||
Former | unknown Status updated on 14.11.2016 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Exel Industries 54, rue Marcel Paul 51200 Epernay / FR | [2018/37] | Inventor(s) | 01 /
RICHER, Eduard Hagelstädter Straße 11 93095 Hagelstadt/Gailsbach / DE | 02 /
GALLMEIER, Florian Bachstraße 14 84069 Schierling / DE | [2018/37] | Representative(s) | Lavoix Bayerstraße 83 80335 München / DE | [2021/49] |
Former [2018/37] | Lavoix Bayerstrasse 83 80335 München / DE | Application number, filing date | 16790613.0 | 03.11.2016 | [2018/37] | WO2016EP76522 | Priority number, date | DE201520105938U | 06.11.2015 Original published format: DE 202015105938 U | [2018/37] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2017076953 | Date: | 11.05.2017 | Language: | DE | [2017/19] | Type: | A1 Application with search report | No.: | EP3370498 | Date: | 12.09.2018 | Language: | DE | The application published by WIPO in one of the EPO official languages on 11.05.2017 takes the place of the publication of the European patent application. | [2018/37] | Type: | B1 Patent specification | No.: | EP3370498 | Date: | 08.12.2021 | Language: | DE | [2021/49] | Search report(s) | International search report - published on: | EP | 11.05.2017 | Classification | IPC: | A01D23/02 | [2018/37] | CPC: |
A01D23/02 (EP,RU,US);
A01D33/02 (RU);
A01D2023/022 (EP,US);
A01D2023/026 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/37] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | LÄNGSENTBLATTER UND ENTSPRECHENDE RÜBENERNTEMASCHINE | [2018/37] | English: | LONGITUDINAL LEAF STRIPPER AND CORRESPONDING BEET HARVESTING MACHINE | [2018/37] | French: | EFFEUILLEUSE LONGITUDINALE ET RÉCOLTEUSE DE BETTERAVES CORRESPONDANTE | [2018/37] | Entry into regional phase | 06.06.2018 | National basic fee paid | 06.06.2018 | Designation fee(s) paid | 06.06.2018 | Examination fee paid | Examination procedure | 06.06.2018 | Examination requested [2018/37] | 06.06.2018 | Date on which the examining division has become responsible | 10.12.2018 | Amendment by applicant (claims and/or description) | 16.12.2019 | Despatch of a communication from the examining division (Time limit: M04) | 27.02.2020 | Reply to a communication from the examining division | 18.11.2020 | Communication of intention to grant the patent | 21.01.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 11.02.2021 | Communication of intention to grant the patent | 13.07.2021 | Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time | 28.07.2021 | Fee for grant paid | 28.07.2021 | Fee for publishing/printing paid | 28.07.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 09.09.2022 | No opposition filed within time limit [2022/46] | Request for further processing for: | The application is deemed to be withdrawn due to failure to fulfill actions required for granting the patent | 28.07.2021 | Request for further processing filed | 28.07.2021 | Full payment received (date of receipt of payment) Request granted | 04.08.2021 | Decision despatched | Fees paid | Renewal fee | 29.11.2018 | Renewal fee patent year 03 | 25.10.2019 | Renewal fee patent year 04 | 26.10.2020 | Renewal fee patent year 05 | 29.10.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.11.2016 | AL | 08.12.2021 | CY | 08.12.2021 | CZ | 08.12.2021 | DK | 08.12.2021 | EE | 08.12.2021 | ES | 08.12.2021 | FI | 08.12.2021 | HR | 08.12.2021 | IT | 08.12.2021 | LT | 08.12.2021 | LV | 08.12.2021 | MC | 08.12.2021 | MK | 08.12.2021 | MT | 08.12.2021 | PL | 08.12.2021 | RO | 08.12.2021 | RS | 08.12.2021 | SE | 08.12.2021 | SI | 08.12.2021 | SK | 08.12.2021 | SM | 08.12.2021 | BG | 08.03.2022 | NO | 08.03.2022 | GR | 09.03.2022 | IS | 08.04.2022 | PT | 08.04.2022 | [2024/42] |
Former [2024/27] | HU | 03.11.2016 | |
AL | 08.12.2021 | ||
CY | 08.12.2021 | ||
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
IT | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
MC | 08.12.2021 | ||
MK | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SI | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2024/21] | HU | 03.11.2016 | |
AL | 08.12.2021 | ||
CY | 08.12.2021 | ||
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
IT | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
MC | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SI | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2024/18] | HU | 03.11.2016 | |
AL | 08.12.2021 | ||
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
IT | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
MC | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SI | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2023/30] | AL | 08.12.2021 | |
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
IT | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
MC | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SI | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2023/27] | AL | 08.12.2021 | |
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
IT | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SI | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2023/01] | AL | 08.12.2021 | |
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SI | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2022/49] | AL | 08.12.2021 | |
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2022/46] | CZ | 08.12.2021 | |
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2022/42] | CZ | 08.12.2021 | |
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2022/36] | CZ | 08.12.2021 | |
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
PT | 08.04.2022 | ||
Former [2022/35] | CZ | 08.12.2021 | |
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
PT | 08.04.2022 | ||
Former [2022/34] | EE | 08.12.2021 | |
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
PT | 08.04.2022 | ||
Former [2022/33] | ES | 08.12.2021 | |
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
Former [2022/25] | ES | 08.12.2021 | |
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
Former [2022/24] | ES | 08.12.2021 | |
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
BG | 08.03.2022 | ||
GR | 09.03.2022 | ||
Former [2022/22] | FI | 08.12.2021 | |
LT | 08.12.2021 | ||
RS | 08.12.2021 | ||
BG | 08.03.2022 | ||
Former [2022/21] | RS | 08.12.2021 | |
BG | 08.03.2022 | ||
Former [2022/19] | BG | 08.03.2022 | Cited in | International search | [A]GB875861 (STOLL WALTER) [A] 1-10* the whole document *; | [Y]FR1587299 (CAMILLE CARRE) [Y] 1-10 * page 1, line 32 - page 2, line 31; figure 3 *; | [A]DE3213563 (STOLL MASCHF GMBH WILHELM [DE]) [A] 1-10 * page 11 - page 14; figures 1, 2 *; | [Y]FR2928241 (EXEL IND SA [FR]) [Y] 1-10 * page 2, line 11 - page 3, line 26; figures 2, 4 * | by applicant | DE2716015 |