EP3529104 - PRE-CRASH SEAT ACTUATOR SYSTEM AND METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.06.2021 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 03.07.2020 | ||
Former | Grant of patent is intended Status updated on 18.02.2020 | ||
Former | Request for examination was made Status updated on 26.07.2019 | ||
Former | The international publication has been made Status updated on 27.04.2018 | ||
Former | unknown Status updated on 21.11.2016 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Robert Bosch GmbH Postfach 30 02 20 70442 Stuttgart / DE | [2020/32] |
Former [2020/18] | For all designated states Robert Bosch GmbH Postfach 30 02 20 70442 Stuttgart / DE | ||
Former [2019/35] | For all designated states Robert Bosch GmbH Postfach 30 02 20 70442 Stuttgart / DE | Inventor(s) | 01 /
FREIENSTEIN, Heiko Erik Weigleweg 12 71263 Weil der Stadt / DE | 02 /
MARUTZ, George, W., II. 10529 Hart Avenue Huntington Woods, MI 48070 / US | 03 /
ORAVA, Kevin 6585 Shadydale Drive Shelby Township, MI 48316 / US | [2019/35] | Representative(s) | (deleted) | [2020/32] |
Former [2019/35] | Isarpatent Patent- und Rechtsanwälte Behnisch Barth Charles Hassa Peckmann & Partner mbB Friedrichstrasse 31 80801 München / DE | Application number, filing date | 16794467.7 | 21.10.2016 | [2019/35] | WO2016US58161 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018075066 | Date: | 26.04.2018 | Language: | EN | [2018/17] | Type: | A1 Application with search report | No.: | EP3529104 | Date: | 28.08.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 26.04.2018 takes the place of the publication of the European patent application. | [2019/35] | Type: | B1 Patent specification | No.: | EP3529104 | Date: | 05.08.2020 | Language: | EN | [2020/32] | Search report(s) | International search report - published on: | EP | 26.04.2018 | Classification | IPC: | B60N2/02, B60N2/427 | [2019/35] | CPC: |
B60N2/0276 (EP,KR,US);
B60N2/02246 (US);
B60N2/4279 (EP,KR);
B60R21/013 (KR);
B60R21/0134 (US);
B60R21/01554 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/35] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUM VERSTELLEN EINES SITZES VOR EINEM UNFALL | [2020/09] | English: | PRE-CRASH SEAT ACTUATOR SYSTEM AND METHOD | [2019/35] | French: | PROCÉDÉ ET DISPOSITIF DE RÈGLAGE D'UN SIÈGE AVANT UNE COLLISION | [2020/09] |
Former [2019/35] | SITZAKTUATORSYSTEM UND -VERFAHREN VOR DEM UNFALL | ||
Former [2019/35] | SYSTÈME ET PROCÉDÉ D'ACTIONNEUR DE SIÈGE PRÉ-COLLISION | Entry into regional phase | 21.05.2019 | National basic fee paid | 21.05.2019 | Designation fee(s) paid | 21.05.2019 | Examination fee paid | Examination procedure | 21.05.2019 | Examination requested [2019/35] | 21.05.2019 | Date on which the examining division has become responsible | 03.12.2019 | Amendment by applicant (claims and/or description) | 19.02.2020 | Communication of intention to grant the patent | 26.06.2020 | Fee for grant paid | 26.06.2020 | Fee for publishing/printing paid | 26.06.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 07.05.2021 | No opposition filed within time limit [2021/28] | Fees paid | Renewal fee | 21.05.2019 | Renewal fee patent year 03 | 31.10.2019 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.10.2016 | AL | 05.08.2020 | AT | 05.08.2020 | CY | 05.08.2020 | CZ | 05.08.2020 | DK | 05.08.2020 | EE | 05.08.2020 | ES | 05.08.2020 | FI | 05.08.2020 | HR | 05.08.2020 | IT | 05.08.2020 | LT | 05.08.2020 | LV | 05.08.2020 | MC | 05.08.2020 | MK | 05.08.2020 | MT | 05.08.2020 | NL | 05.08.2020 | PL | 05.08.2020 | RO | 05.08.2020 | RS | 05.08.2020 | SE | 05.08.2020 | SI | 05.08.2020 | SK | 05.08.2020 | SM | 05.08.2020 | TR | 05.08.2020 | IE | 21.10.2020 | LU | 21.10.2020 | BE | 31.10.2020 | CH | 31.10.2020 | LI | 31.10.2020 | BG | 05.11.2020 | NO | 05.11.2020 | GR | 06.11.2020 | IS | 05.12.2020 | PT | 07.12.2020 | [2022/32] |
Former [2022/27] | HU | 21.10.2016 | |
AL | 05.08.2020 | ||
AT | 05.08.2020 | ||
CY | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
MT | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
TR | 05.08.2020 | ||
IE | 21.10.2020 | ||
LU | 21.10.2020 | ||
BE | 31.10.2020 | ||
CH | 31.10.2020 | ||
LI | 31.10.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/46] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
IE | 21.10.2020 | ||
LU | 21.10.2020 | ||
BE | 31.10.2020 | ||
CH | 31.10.2020 | ||
LI | 31.10.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/37] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
LU | 21.10.2020 | ||
BE | 31.10.2020 | ||
CH | 31.10.2020 | ||
LI | 31.10.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/36] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
LU | 21.10.2020 | ||
BE | 31.10.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/34] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
LU | 21.10.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/31] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
LU | 21.10.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/28] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/25] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/22] | AT | 05.08.2020 | |
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/21] | AT | 05.08.2020 | |
DK | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/12] | AT | 05.08.2020 | |
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/10] | AT | 05.08.2020 | |
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
PL | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/09] | AT | 05.08.2020 | |
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
LT | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
PT | 07.12.2020 | ||
Former [2021/08] | ES | 05.08.2020 | |
FI | 05.08.2020 | ||
LT | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
PT | 07.12.2020 | ||
Former [2021/07] | FI | 05.08.2020 | |
LT | 05.08.2020 | ||
NO | 05.11.2020 | Cited in | International search | [A]EP0402622 (DAIMLER BENZ AG [DE]) [A] 16,17* column 2, line 5 - column 3, line 25; figure 2 *; | [A]US2004212226 (BETHGE THOMAS [DE], et al) [A] 1,10,16,20 * paragraphs [0051] - [0055] - [0059] * * figure -; claim 8 *; | [A]US2005131606 (MOTOZAWA YASUKI [JP], et al) [A] 1,10,16,20 * paragraphs [0043] , [0067]; figure - *; | [A]EP1609664 (AISIN SEIKI [JP]) [A] 1,10,16,20 * paragraphs [0033] - [0035]; figure - *; | [A]US2006175116 (FRIEDMAN KEITH [US], et al) [A] 1,10,16,20 * paragraphs [0033] , [0048]; figures 1-5,7 *; | [I]US2011221247 (HASHIMOTO SYUZO [JP], et al) [I] 20-24 * paragraphs [0044] , [0045]; figure 6 * |