EP3295209 - METHOD AND APPARATUS FOR MEASURING THE LENGTH OF AN ELECTRODE IN AN ELECTRIC ARC FURNACE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 09.07.2021 Database last updated on 16.07.2024 | |
Former | The patent has been granted Status updated on 31.07.2020 | ||
Former | Grant of patent is intended Status updated on 19.03.2020 | ||
Former | Examination is in progress Status updated on 12.11.2019 | ||
Former | Request for examination was made Status updated on 16.02.2018 | ||
Former | The international publication has been made Status updated on 25.11.2016 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Hatch Ltd. 2800 Speakman Drive Mississauga, Ontario L5K 2R7 / CA | [2018/12] | Inventor(s) | 01 /
CRAMER, Matthew H. 247 Jelinik Terrace Milton, Ontario L9T 7M7 / CA | 02 /
SADRI, Afshin 25 Majesty Court Woodbridge, Ontario L4L 3S6 / CA | 03 /
ERSKINE, Jennifer 2170-18 Bromsgrove Road Mississauga, Ontario L5J 4J2 / CA | 04 /
CHATAWAY, David 954 Whittier Crescent Mississauga, Ontario L5H 2X3 / CA | 05 /
WASMUND, Bert O. 5271 Campbellville Road Milton, Ontario L9T 7L6 / CA | [2018/12] | Representative(s) | Millburn, Julie Elizabeth, et al Reddie & Grose LLP The White Chapel Building 10 Whitechapel High Street London E1 8QS / GB | [N/P] |
Former [2018/12] | Robson, Aidan John Reddie & Grose LLP The White Chapel Building 10 Whitechapel High Street London E1 8QS / GB | Application number, filing date | 16795586.3 | 13.05.2016 | [2018/12] | WO2016CA50550 | Priority number, date | US201562162158P | 15.05.2015 Original published format: US 201562162158 P | [2018/12] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016183672 | Date: | 24.11.2016 | Language: | EN | [2016/47] | Type: | A1 Application with search report | No.: | EP3295209 | Date: | 21.03.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 24.11.2016 takes the place of the publication of the European patent application. | [2018/12] | Type: | B1 Patent specification | No.: | EP3295209 | Date: | 02.09.2020 | Language: | EN | [2020/36] | Search report(s) | International search report - published on: | CA | 24.11.2016 | (Supplementary) European search report - dispatched on: | EP | 22.10.2018 | Classification | IPC: | G01S13/08, C21D1/38, C22B9/21, F27B3/08, F27D21/00, G01F23/284, G01S13/88, F27B3/28 | [2018/47] | CPC: |
G01S13/08 (EP,US);
F27B3/28 (EP,US);
F27D21/00 (EP,US);
G01F23/284 (EP,US);
G01S13/88 (EP,US);
F27B3/085 (EP,US)
|
Former IPC [2018/12] | G01S13/08, C21D1/38, C22B9/21, F27B3/08, F27D21/00, G01F23/284, G01S13/88 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/12] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR MESSUNG DER LÄNGE EINER ELEKTRODE IN EINEM ELEKTROLICHTBOGENOFEN | [2018/12] | English: | METHOD AND APPARATUS FOR MEASURING THE LENGTH OF AN ELECTRODE IN AN ELECTRIC ARC FURNACE | [2018/12] | French: | PROCÉDÉ ET APPAREIL POUR MESURER LA LONGUEUR D'UNE ÉLECTRODE DANS UN FOUR À ARC ÉLECTRIQUE | [2020/14] |
Former [2018/12] | PROCÉDÉ ET APPAREIL DE MESURE DE LA LONGUEUR D'UNE ÉLECTRODE DANS UN FOUR À ARC ÉLECTRIQUE | Entry into regional phase | 13.12.2017 | National basic fee paid | 13.12.2017 | Search fee paid | 13.12.2017 | Designation fee(s) paid | 13.12.2017 | Examination fee paid | Examination procedure | 13.12.2017 | Examination requested [2018/12] | 13.12.2017 | Date on which the examining division has become responsible | 17.05.2019 | Amendment by applicant (claims and/or description) | 15.11.2019 | Despatch of a communication from the examining division (Time limit: M02) | 15.01.2020 | Reply to a communication from the examining division | 20.03.2020 | Communication of intention to grant the patent | 20.07.2020 | Fee for grant paid | 20.07.2020 | Fee for publishing/printing paid | 21.07.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 03.06.2021 | No opposition filed within time limit [2021/32] | Fees paid | Renewal fee | 29.03.2018 | Renewal fee patent year 03 | 29.05.2019 | Renewal fee patent year 04 | 30.03.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.05.2016 | AL | 02.09.2020 | AT | 02.09.2020 | CY | 02.09.2020 | CZ | 02.09.2020 | DK | 02.09.2020 | EE | 02.09.2020 | ES | 02.09.2020 | FI | 02.09.2020 | HR | 02.09.2020 | IT | 02.09.2020 | LT | 02.09.2020 | LV | 02.09.2020 | MC | 02.09.2020 | MK | 02.09.2020 | PL | 02.09.2020 | RO | 02.09.2020 | RS | 02.09.2020 | SE | 02.09.2020 | SI | 02.09.2020 | SK | 02.09.2020 | SM | 02.09.2020 | NL | 23.09.2020 | BG | 02.12.2020 | NO | 02.12.2020 | GR | 03.12.2020 | IS | 02.01.2021 | PT | 04.01.2021 | GB | 13.05.2021 | IE | 13.05.2021 | LU | 13.05.2021 | BE | 31.05.2021 | CH | 31.05.2021 | FR | 31.05.2021 | LI | 31.05.2021 | [2024/22] |
Former [2023/30] | HU | 13.05.2016 | |
AL | 02.09.2020 | ||
AT | 02.09.2020 | ||
CY | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
NL | 23.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
GB | 13.05.2021 | ||
IE | 13.05.2021 | ||
LU | 13.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
FR | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2023/29] | HU | 13.05.2016 | |
AL | 02.09.2020 | ||
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
NL | 23.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
GB | 13.05.2021 | ||
IE | 13.05.2021 | ||
LU | 13.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
FR | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/34] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
GB | 13.05.2021 | ||
IE | 13.05.2021 | ||
LU | 13.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
FR | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/24] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
GB | 13.05.2021 | ||
IE | 13.05.2021 | ||
LU | 13.05.2021 | ||
CH | 31.05.2021 | ||
FR | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/22] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
GB | 13.05.2021 | ||
IE | 13.05.2021 | ||
LU | 13.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/21] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
IE | 13.05.2021 | ||
LU | 13.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/11] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
LU | 13.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/09] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
LU | 13.05.2021 | ||
Former [2022/07] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/48] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/37] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/36] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/28] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/25] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/23] | AT | 02.09.2020 | |
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/22] | CZ | 02.09.2020 | |
EE | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/21] | FI | 02.09.2020 | |
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/10] | FI | 02.09.2020 | |
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
Former [2021/09] | FI | 02.09.2020 | |
LT | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
Former [2021/08] | FI | 02.09.2020 | |
LT | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
Former [2021/07] | FI | 02.09.2020 | |
LT | 02.09.2020 | ||
NO | 02.12.2020 | Documents cited: | Search | [XI]JP2012137255 (WIRE DEVICE KK) [X] 1-7 * paragraphs [0001] , [0002]; figures 1,2,6,7; claims 1-5 *[I] 8-15; | [X]US2013127653 (DIENENTHAL JORG [DE], et al) [X] 1-15 * paragraphs [0001] , [0002] , [0008] , [0012] , [0016] , [0019] , [0021]; figures 1,3; claims 1,2 *; | [XI]WO2014002192 (WADECO CO LTD [JP], et al) [X] 1-7 * paragraphs [0001] , [0002]; figures 1,2,6,7; claims 1,2,6 * [I] 8-15; | [X] - Norman Ballard ET AL, "ELECTRODE LENGTH MEASUREMENT IN ELECTRIC 'ARC FURNACES", MSc Dissertation., (19950426), pages 1 - 68, URL: https://open.uct.ac.za/bitstream/handle/11427/18232/thesis_ebe_1995_ballard_norman.pdf?sequence=1, (20161220), XP055330590 [X] 1-15 * page ii; 1st and 2nd paragraphs * * page 9; section 2.2.4 * * page 1; 3rd paragraph * * figure 1.2 * | International search | [A]US2013127653 (DIENENTHAL JORG [DE], et al) [A] 1-41 **see entire document *; | [A]WO2014002192 (WADECO CO LTD [JP], et al) [A] 1-41 **see entire document *; | [A] - BALLARD, NORMAN, "Electrode Length Measurement in Electric Arc Furnaces.", MSc Dissertation., (19950426), pages 1 - 68, XP055330590 [A] 1-41 **see pages 9-10 and 12-14 * | by applicant | US4843234 | WO2006089315 | US2013127653 | WO2014002192 | - "Electrode Length Measurement in Electric Arc Furnaces", MSC Dissertation, (19950426), pages 1 - 68 |