EP3371341 - TREATMENT DEVICE FOR PICKLING AND PHOSPHATING WIRE OR WIRE PARTS AND TREATMENT PLANT FOR COATING THE WIRE OR THE WIRE PARTS [Right-click to bookmark this link] | |||
Former [2018/37] | TREATMENT DEVICE FOR PICKLING AND PHOSPHATING WIRE OR WIRE PARTS, AND TREATMENT METHOD, AND TREATMENT PLANT FOR COATING THE WIRE OR THE WIRE PARTS | ||
[2019/20] | Status | No opposition filed within time limit Status updated on 04.09.2020 Database last updated on 30.07.2024 | |
Former | The patent has been granted Status updated on 27.09.2019 | ||
Former | Grant of patent is intended Status updated on 14.05.2019 | ||
Former | Request for examination was made Status updated on 10.08.2018 | ||
Former | The international publication has been made Status updated on 13.05.2017 | ||
Former | unknown Status updated on 25.11.2016 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Retomax AG c/o First Advisory Trust Reg. Wuhrstraße 6 Postfach 461 9490 Vaduz / LI | [2018/39] |
Former [2018/37] | For all designated states Retomax AG Wuhrstrasse 6 9490 Vaduz / LI | Inventor(s) | 01 /
SCHÖNBERG, Joachim Gerberstrasse 5 88444 Ummendorf / DE | [2018/37] | Representative(s) | Ascherl, Andreas KEHL, ASCHERL, LIEBHOFF & ETTMAYR Patentanwälte - Partnerschaft Emil-Riedel-Strasse 18 80538 München / DE | [2018/37] | Application number, filing date | 16797484.9 | 07.11.2016 | [2018/37] | WO2016EP76873 | Priority number, date | DE20151014304 | 05.11.2015 Original published format: DE102015014304 | [2018/37] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2017077124 | Date: | 11.05.2017 | Language: | DE | [2017/19] | Type: | A1 Application with search report | No.: | EP3371341 | Date: | 12.09.2018 | Language: | DE | The application published by WIPO in one of the EPO official languages on 11.05.2017 takes the place of the publication of the European patent application. | [2018/37] | Type: | B1 Patent specification | No.: | EP3371341 | Date: | 30.10.2019 | Language: | DE | [2019/44] | Search report(s) | International search report - published on: | EP | 11.05.2017 | Classification | IPC: | C23C22/00, C23C22/08, C23G1/00, C23G1/06, C23G3/00 | [2018/37] | CPC: |
C23C22/00 (EP,US);
C23C22/07 (KR);
C23C22/83 (US);
C23C22/08 (EP,US);
C23C22/62 (US);
C23G1/00 (EP,US);
C23G1/06 (EP,KR,US);
C23G3/00 (EP,US);
C23G3/025 (KR);
C23G3/027 (KR)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/37] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | BEHANDLUNGSVORRICHTUNG ZUM BEIZEN UND PHOSPHATIEREN VON DRAHT ODER DRAHTTEILEN SOWIE BEHANDLUNGSANLAGE ZUM BESCHICHTEN DES DRAHTS ODER DER DRAHTTEILE | [2019/20] | English: | TREATMENT DEVICE FOR PICKLING AND PHOSPHATING WIRE OR WIRE PARTS AND TREATMENT PLANT FOR COATING THE WIRE OR THE WIRE PARTS | [2019/20] | French: | DISPOSITIF DE TRAITEMENT POUR LE DÉCAPAGE ET LA PHOSPHATATION D'UN FIL MÉTALLIQUE OU DE PARTIES DE FIL MÉTALLIQUE ET INSTALLATION DE TRAITEMENT POUR LE REVÊTEMENT DU FIL MÉTALLIQUE OU DES PARTIES DE FIL MÉTALLIQUE | [2019/20] |
Former [2018/37] | BEHANDLUNGSVORRICHTUNG ZUM BEIZEN UND PHOSPHATIEREN VON DRAHT ODER DRAHTTEILEN UND BEHANDLUNGSVERFAHREN SOWIE BEHANDLUNGSANLAGE ZUM BESCHICHTEN DES DRAHTS ODER DER DRAHTTEILE | ||
Former [2018/37] | TREATMENT DEVICE FOR PICKLING AND PHOSPHATING WIRE OR WIRE PARTS, AND TREATMENT METHOD, AND TREATMENT PLANT FOR COATING THE WIRE OR THE WIRE PARTS | ||
Former [2018/37] | DISPOSITIF DE TRAITEMENT POUR LE DÉCAPAGE ET LA PHOSPHATATION D'UN FIL MÉTALLIQUE OU DE PARTIES DE FIL MÉTALLIQUE ET PROCÉDÉ DE TRAITEMENT AINSI QU'INSTALLATION DE TRAITEMENT POUR LE REVÊTEMENT DU FIL MÉTALLIQUE OU DES PARTIES DE FIL MÉTALLIQUE | Entry into regional phase | 04.06.2018 | National basic fee paid | 04.06.2018 | Designation fee(s) paid | 04.06.2018 | Examination fee paid | Examination procedure | 05.09.2017 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 04.06.2018 | Examination requested [2018/37] | 04.06.2018 | Date on which the examining division has become responsible | 28.01.2019 | Amendment by applicant (claims and/or description) | 15.05.2019 | Communication of intention to grant the patent | 13.09.2019 | Fee for grant paid | 13.09.2019 | Fee for publishing/printing paid | 13.09.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | EP19205240.5 / EP3640368 | Opposition(s) | 31.07.2020 | No opposition filed within time limit [2020/41] | Fees paid | Renewal fee | 27.11.2018 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.11.2016 | AL | 30.10.2019 | CY | 30.10.2019 | CZ | 30.10.2019 | DK | 30.10.2019 | EE | 30.10.2019 | ES | 30.10.2019 | FI | 30.10.2019 | HR | 30.10.2019 | IT | 30.10.2019 | LT | 30.10.2019 | LV | 30.10.2019 | MC | 30.10.2019 | MK | 30.10.2019 | MT | 30.10.2019 | NL | 30.10.2019 | PL | 30.10.2019 | RO | 30.10.2019 | RS | 30.10.2019 | SE | 30.10.2019 | SI | 30.10.2019 | SK | 30.10.2019 | SM | 30.10.2019 | TR | 30.10.2019 | IE | 07.11.2019 | LU | 07.11.2019 | BE | 30.11.2019 | CH | 30.11.2019 | LI | 30.11.2019 | BG | 30.01.2020 | NO | 30.01.2020 | GR | 31.01.2020 | IS | 29.02.2020 | PT | 02.03.2020 | [2022/32] |
Former [2022/27] | HU | 07.11.2016 | |
AL | 30.10.2019 | ||
CY | 30.10.2019 | ||
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
IT | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
MC | 30.10.2019 | ||
MT | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SI | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
TR | 30.10.2019 | ||
IE | 07.11.2019 | ||
LU | 07.11.2019 | ||
BE | 30.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2021/34] | HU | 07.11.2016 | |
AL | 30.10.2019 | ||
CY | 30.10.2019 | ||
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
IT | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
MC | 30.10.2019 | ||
MT | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SI | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
IE | 07.11.2019 | ||
LU | 07.11.2019 | ||
BE | 30.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2021/32] | HU | 07.11.2016 | |
AL | 30.10.2019 | ||
CY | 30.10.2019 | ||
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
IT | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
MC | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SI | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
IE | 07.11.2019 | ||
LU | 07.11.2019 | ||
BE | 30.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2021/26] | AL | 30.10.2019 | |
CY | 30.10.2019 | ||
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
IT | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
MC | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SI | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
IE | 07.11.2019 | ||
LU | 07.11.2019 | ||
BE | 30.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/51] | AL | 30.10.2019 | |
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
IT | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
MC | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SI | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
IE | 07.11.2019 | ||
LU | 07.11.2019 | ||
BE | 30.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/46] | AL | 30.10.2019 | |
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
IT | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
MC | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
IE | 07.11.2019 | ||
LU | 07.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/38] | AL | 30.10.2019 | |
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
IT | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
MC | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
LU | 07.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/37] | AL | 30.10.2019 | |
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
MC | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
SK | 30.10.2019 | ||
SM | 30.10.2019 | ||
LU | 07.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/36] | AL | 30.10.2019 | |
CZ | 30.10.2019 | ||
DK | 30.10.2019 | ||
EE | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
MC | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
LU | 07.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/35] | AL | 30.10.2019 | |
CZ | 30.10.2019 | ||
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RO | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
LU | 07.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/34] | AL | 30.10.2019 | |
ES | 30.10.2019 | ||
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/32] | AL | 30.10.2019 | |
FI | 30.10.2019 | ||
HR | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/25] | FI | 30.10.2019 | |
HR | 30.10.2019 | ||
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
RS | 30.10.2019 | ||
SE | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/24] | FI | 30.10.2019 | |
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
SE | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
IS | 29.02.2020 | ||
PT | 02.03.2020 | ||
Former [2020/23] | FI | 30.10.2019 | |
LT | 30.10.2019 | ||
LV | 30.10.2019 | ||
NL | 30.10.2019 | ||
PL | 30.10.2019 | ||
SE | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
GR | 31.01.2020 | ||
PT | 02.03.2020 | ||
Former [2020/22] | FI | 30.10.2019 | |
LT | 30.10.2019 | ||
SE | 30.10.2019 | ||
BG | 30.01.2020 | ||
NO | 30.01.2020 | ||
PT | 02.03.2020 | ||
Former [2020/21] | NO | 30.01.2020 | Cited in | International search | [IY]EP0270836 (NIHON PARKERIZING [JP]) [I] 11-15 * page 3, paragraph 2; example 1 * * page 7, paragraph 2 * [Y] 10; | [A]DE10345801 (BASF AG [DE]) [A] 7,14 * paragraph [0004] *; | [A]WO2015070976 (WEYLCHEM WIESBADEN GMBH [DE]) [A] 7,14 * page 19, lines 15 - 19 *; | [XP]WO2015165600 (RIO VERWALTUNGS AG [CH]) [XP] 1,6-9 * page 13, paragraph l; figures 1,2; claims 1,7,10 *; | [XAY] - Anonym, "Betona Kristallbeizverfahren", Rio GmbH, Ummendorf [DE], (2012), pages 1 - 3, URL: http://betona-kristallbeize.de/betona.html, (20170206), XP055342685 [X] 1,6-8 * the whole document * [A] 11-15 [Y] 2-5,10 | [YA] - Horschig J, "Mit einem Tauchbad beizen und phosphatieren", besser lackieren., Vincentz Network, Hannover [DE], (20130313), page 1, URL: http://www.besserlackieren.de/layout/set/print/Industrielle-Anwendungen/Sonstige-Beschichtungen/Mit-einem-Tauchbad-beizen-und-phosphatieren, (20170131), XP055340858 [Y] 2-5 * the whole document * [A] 11-15 | [A] - KEIJZER M, "VECOM IST AUF STRENGERE UMWELTNORMEN VORBEREITET", TECHNICAL BULLETIN, VECOM Groep, Maassluis [NL], (200404), vol. PRD 2004/07, page 1, XP055342279 [A] 11 * the whole document * | [A] - VAN OS T, "PRE-COMMISSION CLEANING", TECHNICAL BULLETIN, VECOM Groep, Maassluis [NL], (200410), vol. 2004/19, pages 1 - 3, XP055342285 [A] 1-15 * the whole document * | [A] - SCHÖNBERG J, "Sieben Arbeitsschritte in einem Prozess", JOT - JOURNAL FÜR OBERFLÄCHENTECHNIK, Springer [DE], (201011), vol. 50, no. 11, doi:10.1007/BF03242014, ISSN 0940-8789, pages 60 - 61, XP055340860 [A] 1-15 * the whole document * DOI: http://dx.doi.org/10.1007/BF03242014 |