EP3306362 - LAMINATE AND MANUFACTURING METHOD FOR SAME [Right-click to bookmark this link] | Status | The patent has been granted Status updated on 01.10.2021 Database last updated on 02.11.2024 | |
Former | Grant of patent is intended Status updated on 17.06.2021 | ||
Former | Request for examination was made Status updated on 09.03.2018 | ||
Former | The international publication has been made Status updated on 09.12.2016 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Toppan Printing Co., Ltd. 5-1, Taito 1-chome Taito-ku Tokyo 110-0016 / JP | [2018/15] | Inventor(s) | 01 /
YASHIKI, Kazuhiro c/o TOPPAN PRINTING CO. LTD. 5-1 Taito 1-chome Taito-ku Tokyo 110-0016 / JP | [2018/15] | Representative(s) | Hoffmann Eitle Patent- und Rechtsanwälte PartmbB Arabellastraße 30 81925 München / DE | [2018/15] | Application number, filing date | 16802825.6 | 02.06.2016 | [2018/15] | WO2016JP02688 | Priority number, date | JP20150112623 | 02.06.2015 Original published format: JP 2015112623 | [2018/15] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016194385 | Date: | 08.12.2016 | Language: | JA | [2016/49] | Type: | A1 Application with search report | No.: | EP3306362 | Date: | 11.04.2018 | Language: | EN | [2018/15] | Type: | B1 Patent specification | No.: | EP3306362 | Date: | 03.11.2021 | Language: | EN | [2021/44] | Search report(s) | International search report - published on: | JP | 08.12.2016 | (Supplementary) European search report - dispatched on: | EP | 10.04.2018 | Classification | IPC: | G02B5/18, B32B3/02, B32B3/30, B42D25/328, B42D25/45, B32B27/08, B32B27/36 | [2018/18] | CPC: |
B32B3/30 (EP,KR,US);
G02B5/18 (EP,CN,KR,US);
B42D25/324 (US);
B32B27/08 (EP,US);
B32B27/36 (EP,US);
B32B3/02 (EP,US);
B42D25/328 (EP,US);
B42D25/373 (US);
B42D25/445 (US);
B42D25/45 (EP,US);
B42D25/455 (US);
B42D25/46 (US);
G02B5/021 (US);
G02B5/1814 (CN);
G02B5/1819 (CN,US);
B32B2255/10 (EP,US);
B32B2255/205 (EP,US);
B32B2255/26 (EP,US);
B32B2255/28 (EP,US);
B32B2307/4023 (EP,US);
B32B2307/416 (EP,US);
B32B2451/00 (US);
B32B2551/00 (EP,US);
B32B2554/00 (US);
|
Former IPC [2018/15] | G02B5/18, B32B3/02, B32B3/30, B42D25/328, B42D25/45 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | LAMINAT UND HERSTELLUNGSVERFAHREN DAFÜR | [2018/15] | English: | LAMINATE AND MANUFACTURING METHOD FOR SAME | [2018/15] | French: | STRATIFIÉ ET SON PROCÉDÉ DE FABRICATION | [2018/15] | Entry into regional phase | 01.12.2017 | Translation filed | 01.12.2017 | National basic fee paid | 01.12.2017 | Search fee paid | 01.12.2017 | Designation fee(s) paid | 01.12.2017 | Examination fee paid | Examination procedure | 01.12.2017 | Examination requested [2018/15] | 01.12.2017 | Date on which the examining division has become responsible | 29.10.2018 | Amendment by applicant (claims and/or description) | 18.06.2021 | Communication of intention to grant the patent | 22.09.2021 | Fee for grant paid | 22.09.2021 | Fee for publishing/printing paid | 22.09.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | EP21195251.0 / EP3951449 | Opposition(s) | Opponent(s) | 01
03.08.2022
05.08.2022
ADMISSIBLE Giesecke+Devrient Currency Technology GmbH Prinzregentenstraße 159 81677 München / DE Opponent's representative Patentanwälte Geyer, Fehners & Partner mbB Perhamerstrasse 31 80687 München / DE | [2022/37] |
Former [2022/36] | |||
Opponent(s) | 01
03.08.2022
Giesecke+Devrient Currency Technology GmbH Prinzregentenstraße 159 81677 München / DE Opponent's representative Patentanwälte Geyer, Fehners & Partner mbB Perhamerstrasse 31 80687 München / DE | 18.08.2022 | Invitation to proprietor to file observations on the notice of opposition | 24.11.2022 | Reply of patent proprietor to notice(s) of opposition | 12.11.2024 | Date of oral proceedings | Fees paid | Renewal fee | 25.06.2018 | Renewal fee patent year 03 | 17.06.2019 | Renewal fee patent year 04 | 31.03.2020 | Renewal fee patent year 05 | 14.06.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 02.06.2016 | AL | 03.11.2021 | CY | 03.11.2021 | CZ | 03.11.2021 | DK | 03.11.2021 | EE | 03.11.2021 | ES | 03.11.2021 | FI | 03.11.2021 | HR | 03.11.2021 | IT | 03.11.2021 | LT | 03.11.2021 | LV | 03.11.2021 | MC | 03.11.2021 | MK | 03.11.2021 | MT | 03.11.2021 | NL | 03.11.2021 | PL | 03.11.2021 | RO | 03.11.2021 | RS | 03.11.2021 | SE | 03.11.2021 | SI | 03.11.2021 | SK | 03.11.2021 | SM | 03.11.2021 | BG | 03.02.2022 | NO | 03.02.2022 | GR | 04.02.2022 | IS | 03.03.2022 | PT | 03.03.2022 | GB | 02.06.2022 | IE | 02.06.2022 | LU | 02.06.2022 | BE | 30.06.2022 | CH | 30.06.2022 | LI | 30.06.2022 | [2024/42] |
Former [2024/22] | HU | 02.06.2016 | |
AL | 03.11.2021 | ||
CY | 03.11.2021 | ||
CZ | 03.11.2021 | ||
DK | 03.11.2021 | ||
EE | 03.11.2021 | ||
ES | 03.11.2021 | ||
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
IT | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
MC | 03.11.2021 | ||
MK | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RO | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
SI | 03.11.2021 | ||
SK | 03.11.2021 | ||
SM | 03.11.2021 | ||
BG | 03.02.2022 | ||
NO | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
GB | 02.06.2022 | ||
IE | 02.06.2022 | ||
LU | 02.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2024/20] | HU | 02.06.2016 | |
AL | 03.11.2021 | ||
CY | 03.11.2021 | ||
CZ | 03.11.2021 | ||
DK | 03.11.2021 | ||
EE | 03.11.2021 | ||
ES | 03.11.2021 | ||
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
IT | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
MC | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RO | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
SI | 03.11.2021 | ||
SK | 03.11.2021 | ||
SM | 03.11.2021 | ||
BG | 03.02.2022 | ||
NO | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
GB | 02.06.2022 | ||
IE | 02.06.2022 | ||
LU | 02.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2024/18] | HU | 02.06.2016 | |
AL | 03.11.2021 | ||
CZ | 03.11.2021 | ||
DK | 03.11.2021 | ||
EE | 03.11.2021 | ||
ES | 03.11.2021 | ||
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
IT | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
MC | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RO | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
SI | 03.11.2021 | ||
SK | 03.11.2021 | ||
SM | 03.11.2021 | ||
BG | 03.02.2022 | ||
NO | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
GB | 02.06.2022 | ||
IE | 02.06.2022 | ||
LU | 02.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2023/27] | AL | 03.11.2021 | |
CZ | 03.11.2021 | ||
DK | 03.11.2021 | ||
EE | 03.11.2021 | ||
ES | 03.11.2021 | ||
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
IT | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
MC | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RO | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
SI | 03.11.2021 | ||
SK | 03.11.2021 | ||
SM | 03.11.2021 | ||
BG | 03.02.2022 | ||
NO | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
GB | 02.06.2022 | ||
IE | 02.06.2022 | ||
LU | 02.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2023/25] | AL | 03.11.2021 | |
CZ | 03.11.2021 | ||
DK | 03.11.2021 | ||
EE | 03.11.2021 | ||
ES | 03.11.2021 | ||
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
IT | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
MC | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RO | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
SI | 03.11.2021 | ||
SK | 03.11.2021 | ||
SM | 03.11.2021 | ||
BG | 03.02.2022 | ||
NO | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
IE | 02.06.2022 | ||
LU | 02.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2023/21] | AL | 03.11.2021 | |
CZ | 03.11.2021 | ||
DK | 03.11.2021 | ||
EE | 03.11.2021 | ||
ES | 03.11.2021 | ||
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
MC | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RO | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
SI | 03.11.2021 | ||
SK | 03.11.2021 | ||
SM | 03.11.2021 | ||
BG | 03.02.2022 | ||
NO | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
IE | 02.06.2022 | ||
LU | 02.06.2022 | ||
CH | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2023/20] | AL | 03.11.2021 | |
CZ | 03.11.2021 | ||
DK | 03.11.2021 | ||
EE | 03.11.2021 | ||
ES | 03.11.2021 | ||
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
MC | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RO | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
SI | 03.11.2021 | ||
SK | 03.11.2021 | ||
SM | 03.11.2021 | ||
BG | 03.02.2022 | ||
NO | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
IE | 02.06.2022 | ||
Former [2023/08] | AL | 03.11.2021 | |
CZ | 03.11.2021 | ||
DK | 03.11.2021 | ||
EE | 03.11.2021 | ||
ES | 03.11.2021 | ||
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
MC | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RO | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
SI | 03.11.2021 | ||
SK | 03.11.2021 | ||
SM | 03.11.2021 | ||
BG | 03.02.2022 | ||
NO | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
Former [2023/01] | AL | 03.11.2021 | |
CZ | 03.11.2021 | ||
DK | 03.11.2021 | ||
EE | 03.11.2021 | ||
ES | 03.11.2021 | ||
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RO | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
SI | 03.11.2021 | ||
SK | 03.11.2021 | ||
SM | 03.11.2021 | ||
BG | 03.02.2022 | ||
NO | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
Former [2022/49] | AL | 03.11.2021 | |
CZ | 03.11.2021 | ||
DK | 03.11.2021 | ||
EE | 03.11.2021 | ||
ES | 03.11.2021 | ||
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RO | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
SK | 03.11.2021 | ||
SM | 03.11.2021 | ||
BG | 03.02.2022 | ||
NO | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
Former [2022/35] | CZ | 03.11.2021 | |
DK | 03.11.2021 | ||
EE | 03.11.2021 | ||
ES | 03.11.2021 | ||
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RO | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
SK | 03.11.2021 | ||
SM | 03.11.2021 | ||
BG | 03.02.2022 | ||
NO | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
Former [2022/34] | EE | 03.11.2021 | |
ES | 03.11.2021 | ||
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RO | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
SM | 03.11.2021 | ||
BG | 03.02.2022 | ||
NO | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
Former [2022/33] | ES | 03.11.2021 | |
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
SM | 03.11.2021 | ||
BG | 03.02.2022 | ||
NO | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
Former [2022/25] | ES | 03.11.2021 | |
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
BG | 03.02.2022 | ||
NO | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
Former [2022/24] | ES | 03.11.2021 | |
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
NL | 03.11.2021 | ||
PL | 03.11.2021 | ||
RS | 03.11.2021 | ||
SE | 03.11.2021 | ||
BG | 03.02.2022 | ||
GR | 04.02.2022 | ||
IS | 03.03.2022 | ||
PT | 03.03.2022 | ||
Former [2022/23] | ES | 03.11.2021 | |
FI | 03.11.2021 | ||
HR | 03.11.2021 | ||
LT | 03.11.2021 | ||
LV | 03.11.2021 | ||
PL | 03.11.2021 | ||
RS | 03.11.2021 | ||
BG | 03.02.2022 | ||
PT | 03.03.2022 | ||
Former [2022/22] | FI | 03.11.2021 | |
LT | 03.11.2021 | ||
RS | 03.11.2021 | ||
BG | 03.02.2022 | ||
Former [2022/21] | RS | 03.11.2021 | |
BG | 03.02.2022 | ||
Former [2022/19] | BG | 03.02.2022 | Documents cited: | Search | [A]JP2003344633 (DAINIPPON PRINTING CO LTD) [A] 1-10 * the whole document *; | [Y]JP2011221330 (TOPPAN PRINTING CO LTD) [Y] 1-8 * paragraphs [0016] , [0 23] , [0 25] *; | [YA]US2012064303 (YASHIKI KAZUHIRO [JP], et al) [Y] 1-8 * paragraphs [0044] - [0053] - [0 57] , [0 73] - [0077] - [0 90] , [ 105] , [ 109] , [ 113] , [ 115] , [ 119] * * paragraphs [0121] - [0129] - [ 134] , [ 135] , [ 150] * * figures 1-6 * [A] 9,10; | [D]JP2012063738 (TOPPAN PRINTING CO LTD); | [A]JP2014071442 (TOPPAN PRINTING CO LTD) [A] 1-10* the whole document * | International search | [A]JPS6140272U (Toppan Printing Co., Ltd.) [A] 1-10* , entire text; fig. 1 to 2 (Family: none) *; | [A]JP2008256926 (TOPPAN PRINTING CO LTD) [A] 1-10 * , entire text; fig. 1 to 28 & US 2008/0239216 A1 entire text; fig. 1 to 16 & WO 2008/041580 A1 & EP 2068208 A1 & CA 2631161 A1 & KR 10-2009-0071511 A & AU 2007303379 A1 *; | [A]JP2009086648 (TOPPAN PRINTING CO LTD) [A] 1-10 * , entire text; fig. 1 to 16 (Family: none) *; | [Y]JP4319807B (Dainippon Printing Co., Ltd.) [Y] 2-8 * , paragraphs [0016], [0018]; fig. 1 to 2 (Family: none) *; | [Y]JP2011221330 (TOPPAN PRINTING CO LTD) [Y] 1-8 * , paragraphs [0016], [0023], [0025] (Family: none) *; | [YA]JP2012063738 (TOPPAN PRINTING CO LTD) [Y] 1-8 * , paragraphs [0022] to [0031], [0035], [0051] to [0055], [0067], [0082], [0086], [0089], [0091], [0095], [0097] to [0105], [0110] to [0111], [0125]; fig. 1 to 6 & US 2012/0064303 A1 paragraphs [0044] to [0053], [0057], [0073] to [0077], [0090], [0105], [0109], [0113], [0115], [0119], [0121] to [0129 * [A] 9-10; | [Y]JP2014071442 (TOPPAN PRINTING CO LTD) [Y] 4-8 * , paragraph [0103] (Family: none) * | Opposition | EP0758587 | DE102006037431 | JP2008105226 | EP2077459 | DE102008009296 | JP2010128096 | EP2264488 | JP2011128269 | JP2012078447 | EP2447743 | EP2505377 | WO2013017865 | DE102012105571 | WO2014082319 | DE102013001734 | WO2014118567 | EP2790042 | CN104647936 | WO2015107347 |