EP3303436 - HYDROFLUOROOLEFINS AND METHODS OF USING SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.10.2021 Database last updated on 01.01.2025 | |
Former | The patent has been granted Status updated on 06.11.2020 | ||
Former | Grant of patent is intended Status updated on 06.10.2020 | ||
Former | Request for examination was made Status updated on 28.09.2020 | ||
Former | Grant of patent is intended Status updated on 13.05.2020 | ||
Former | Request for examination was made Status updated on 09.03.2018 | ||
Former | The international publication has been made Status updated on 09.12.2016 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states 3M Innovative Properties Company 3M Center Post Office Box 33427 Saint Paul, Minnesota 55133-3427 / US | [2020/24] |
Former [2018/15] | For all designated states 3M Innovative Properties Company 3M Center Post Office Box 33427 St. Paul, MN 55133-3427 / US | Inventor(s) | 01 /
BULINSKI, Michael J. 3M Center Post Office Box 33427 Saint Paul, Minnesota 55133-3427 / US | 02 /
COSTELLO, Michael G. 3M Center Post Office Box 33427 Saint Paul, Minnesota 55133-3427 / US | 03 /
LAMANNA, William M. 3M Center Post Office Box 33427 Saint Paul, Minnesota 55133-3427 / US | 04 /
SMITH, Sean M. 3M Center Post Office Box 33427 Saint Paul, Minnesota 55133-3427 / US | [2018/15] | Representative(s) | Vossius & Partner Patentanwälte Rechtsanwälte mbB Siebertstrasse 3 81675 München / DE | [2018/15] | Application number, filing date | 16804089.7 | 27.05.2016 | [2018/15] | WO2016US34516 | Priority number, date | US201562171463P | 05.06.2015 Original published format: US 201562171463 P | [2018/15] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016196242 | Date: | 08.12.2016 | Language: | EN | [2016/49] | Type: | A1 Application with search report | No.: | EP3303436 | Date: | 11.04.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 08.12.2016 takes the place of the publication of the European patent application. | [2018/15] | Type: | B1 Patent specification | No.: | EP3303436 | Date: | 09.12.2020 | Language: | EN | [2020/50] | Search report(s) | International search report - published on: | US | 08.12.2016 | (Supplementary) European search report - dispatched on: | EP | 18.01.2019 | Classification | IPC: | C08G18/48, C08J9/00, C07C43/17, C07C211/24, C07D265/30, C07D207/10 | [2019/08] | CPC: |
C07C43/17 (EP,KR,US);
C07D265/30 (EP,KR,US);
C07C211/24 (EP,KR,US);
C07D207/10 (EP,US);
C07D209/10 (KR);
C08F16/24 (US);
C08J9/0019 (EP,KR,US);
C08J9/0023 (EP,KR,US);
C08J9/0028 (EP,KR,US);
|
Former IPC [2018/15] | C08G18/48, C08J9/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | FLUORWASSERSTOFFOLEFINE UND VERFAHREN ZUR VERWENDUNG DAVON | [2020/45] | English: | HYDROFLUOROOLEFINS AND METHODS OF USING SAME | [2018/15] | French: | HYDROFLUOROOLÉFINES ET LEURS PROCÉDÉS D'UTILISATION | [2018/15] |
Former [2018/15] | HYDROFLUOROLEFINE UND VERFAHREN ZUR VERWENDUNG DAVON | Entry into regional phase | 05.12.2017 | National basic fee paid | 05.12.2017 | Search fee paid | 05.12.2017 | Designation fee(s) paid | 05.12.2017 | Examination fee paid | Examination procedure | 05.12.2017 | Examination requested [2018/15] | 05.12.2017 | Date on which the examining division has become responsible | 05.08.2019 | Amendment by applicant (claims and/or description) | 14.05.2020 | Communication of intention to grant the patent | 24.09.2020 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 24.09.2020 | Fee for grant paid | 24.09.2020 | Fee for publishing/printing paid | 14.10.2020 | Communication of intention to grant the patent | 27.10.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 10.09.2021 | No opposition filed within time limit [2021/46] | Fees paid | Renewal fee | 11.05.2018 | Renewal fee patent year 03 | 15.05.2019 | Renewal fee patent year 04 | 31.03.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.05.2016 | AL | 09.12.2020 | AT | 09.12.2020 | CY | 09.12.2020 | CZ | 09.12.2020 | DK | 09.12.2020 | EE | 09.12.2020 | ES | 09.12.2020 | FI | 09.12.2020 | HR | 09.12.2020 | IT | 09.12.2020 | LT | 09.12.2020 | LV | 09.12.2020 | MC | 09.12.2020 | MK | 09.12.2020 | MT | 09.12.2020 | NL | 09.12.2020 | PL | 09.12.2020 | RO | 09.12.2020 | RS | 09.12.2020 | SE | 09.12.2020 | SI | 09.12.2020 | SK | 09.12.2020 | SM | 09.12.2020 | BG | 09.03.2021 | NO | 09.03.2021 | GR | 10.03.2021 | IS | 09.04.2021 | PT | 09.04.2021 | GB | 27.05.2021 | IE | 27.05.2021 | LU | 27.05.2021 | BE | 31.05.2021 | CH | 31.05.2021 | FR | 31.05.2021 | LI | 31.05.2021 | [2024/42] |
Former [2024/22] | HU | 27.05.2016 | |
AL | 09.12.2020 | ||
AT | 09.12.2020 | ||
CY | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
MK | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
GB | 27.05.2021 | ||
IE | 27.05.2021 | ||
LU | 27.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
FR | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2023/30] | HU | 27.05.2016 | |
AL | 09.12.2020 | ||
AT | 09.12.2020 | ||
CY | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
GB | 27.05.2021 | ||
IE | 27.05.2021 | ||
LU | 27.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
FR | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2023/29] | HU | 27.05.2016 | |
AL | 09.12.2020 | ||
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
GB | 27.05.2021 | ||
IE | 27.05.2021 | ||
LU | 27.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
FR | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/34] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
GB | 27.05.2021 | ||
IE | 27.05.2021 | ||
LU | 27.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
FR | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/23] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
GB | 27.05.2021 | ||
IE | 27.05.2021 | ||
LU | 27.05.2021 | ||
CH | 31.05.2021 | ||
FR | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/22] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
GB | 27.05.2021 | ||
IE | 27.05.2021 | ||
LU | 27.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/21] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
IE | 27.05.2021 | ||
LU | 27.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/10] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
LU | 27.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/08] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
LU | 27.05.2021 | ||
Former [2022/07] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
Former [2021/49] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
Former [2021/48] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
Former [2021/45] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
Former [2021/42] | AT | 09.12.2020 | |
CZ | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
Former [2021/39] | AT | 09.12.2020 | |
CZ | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2021/37] | AT | 09.12.2020 | |
CZ | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2021/36] | CZ | 09.12.2020 | |
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2021/35] | CZ | 09.12.2020 | |
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2021/34] | CZ | 09.12.2020 | |
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2021/33] | FI | 09.12.2020 | |
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2021/32] | FI | 09.12.2020 | |
HR | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
Former [2021/30] | FI | 09.12.2020 | |
HR | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
Former [2021/28] | FI | 09.12.2020 | |
HR | 09.12.2020 | ||
LV | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
Former [2021/24] | FI | 09.12.2020 | |
LV | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
Former [2021/23] | FI | 09.12.2020 | |
LV | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
Former [2021/22] | FI | 09.12.2020 | |
RS | 09.12.2020 | ||
NO | 09.03.2021 | ||
Former [2021/20] | FI | 09.12.2020 | Documents cited: | Search | [A]US2005113609 (FURUKAWA YUTAKA [JP]) [A] 1-9 * the whole document *; | [A]US8193397 (FLYNN RICHARD M [US], et al) [A] 1-9* the whole document *; | [I]WO2015013155 (3M INNOVATIVE PROPERTIES CO [US]) [I] 1-9 * the whole document * | International search | [A]US2005113609 (FURUKAWA YUTAKA [JP]) [A] 1-9 * ; para [0025] *; | [A]US8193397 (FLYNN RICHARD M [US], et al) [A] 1-9* ; col 17, In 1-5 *; | [A]WO2015013155 (3M INNOVATIVE PROPERTIES CO [US]) [A] 1-9 * ; pg. 4, In 22-25 *; | [A] - ELLZEY et al., "Reduction of Polyfluoroalkyl Nitriles with Sodium Borohydride", Joumal of Organic Chemistry., (19651100), vol. 30, pages 3945 - 3946, XP055334102 [A] 1-9 * ; pg. 3946, left col, para 6 * DOI: http://dx.doi.org/10.1021/jo01022a512 | by applicant | RU2245319 | WO2015013155 | - FURIN, G.G. et al., Fluorine Notes, (20070000), page 50 |